Copying Equipment / Service Manual Section 1 - Product Outline, Congiguration, Specifications, Consumable Parts, External Views, Unpacking.
File
ar-m35-ar-m450-sm11.pdf
Date

Sharp AR-M35 / AR-M450 (serv.man11) Service Manual ▷ View online

AR-M350 UNPACKING AND INSTALLATION 6-9
8. AR-M11
<Before installation>
•For installation of AR-M11, a scanner module is needed.
•Start installation after checking that the DATA and COMMUNICATION
indicators on the operation panel are neither lit nor blinking.
1) Turn off the main switch of the main unit of the printer.
Turn the main switch located on the front side of the main unit to the
"OFF" position.
Then remove the power plug from the outlet.
2) Remove the cables connected to the printer control PWB unit.
Remove all the cables connected to the printer control PWB unit
from the computer.
3) Remove the printer control PWB unit.
Remove the five screws that fix the printer control PWB unit to the
main unit of the printer.
Then, hold the two grips and pull out the printer control PWB to
remove it from the main unit.
4) Move the optional boards to the MFP control PWB.
Remove the print server card, the HDD PWB, the expansion
memory, the PS Kanji font ROM, and the E2PROM from the removed
printer control PWB unit and mount them to the positions of the MFP
control PWB unit shown in the illustration.
•Installation of print server card
<1>Remove the screws that fix the cover and remove the cover.
<2>Insert the connector of the print server card to the connector of the
MFP control PWB unit.
<3>Fix the print server card using the removed screws.
•Installation of HDD expansion PWB
<1>Remove the three screws shown in the illustration among the screws
that fix the MFP control PWB unit.
<2>Mount the three PWB fixing screws to the positions from which three
screws have been removed.
<3>Insert the HDD expansion PWB to the connector of the MFP control
PWB.
<4>Fix the HDD expansion PWB to the PWB fixing screws using the
three screws that have been removed.
"OFF"
Centronics cable
LAN cable
Screws
Screws
Grip
Grip
Printer control PWB unit
Print server card
PS Kanji font ROM
HDD PWB
Extended memory
Cover
PWB
fixing screw
MFP control PWB unit
E2PROM
 /   "# $%&'(
AR-M350 UNPACKING AND INSTALLATION 6-10
5) Attach the MFP control PWB.
Attach the MFP control PWB unit to the main unit of the printer and
fix it using five screws.
6) Connect the cables to the MFP control PWB.
Connect all the cables that have been removed in step 2 to the
connectors of the MFP control PWB unit.
7) Turn on the main switch of the main unit of the printer.
Insert the power plug of the main unit of the printer to the outlet.
Then, turn the main switch located on the front side of the main unit
to the "ON" position.
8) Check the operation.
<1>Check to see if the indicators on the operation panel of the scanner
module are lit and key operation is available.
<2>Place an original in the scanner module and check to see if copying
can be performed normally.
<3>For setting change of the printer drivers on the computer, see the
supplied operation manual.
Then, execute printing from the computer to check for proper
printing.
Screws
Screws
Cable for scanner
Centronics cable
LAN cable
If another peripheral device must be installed, carry out the following 
step at the end of the installation work.
"ON"
    "# $%&'(
AR-M350 UNPACKING AND INSTALLATION 6-10
5) Attach the MFP control PWB.
Attach the MFP control PWB unit to the main unit of the printer and
fix it using five screws.
6) Connect the cables to the MFP control PWB.
Connect all the cables that have been removed in step 2 to the
connectors of the MFP control PWB unit.
7) Turn on the main switch of the main unit of the printer.
Insert the power plug of the main unit of the printer to the outlet.
Then, turn the main switch located on the front side of the main unit
to the "ON" position.
8) Check the operation.
<1>Check to see if the indicators on the operation panel of the scanner
module are lit and key operation is available.
<2>Place an original in the scanner module and check to see if copying
can be performed normally.
<3>For setting change of the printer drivers on the computer, see the
supplied operation manual.
Then, execute printing from the computer to check for proper
printing.
Screws
Screws
Cable for scanner
Centronics cable
LAN cable
If another peripheral device must be installed, carry out the following 
step at the end of the installation work.
"ON"
    "# $%&'(
AR-M350 UNPACKING AND INSTALLATION 6-10
5) Attach the MFP control PWB.
Attach the MFP control PWB unit to the main unit of the printer and
fix it using five screws.
6) Connect the cables to the MFP control PWB.
Connect all the cables that have been removed in step 2 to the
connectors of the MFP control PWB unit.
7) Turn on the main switch of the main unit of the printer.
Insert the power plug of the main unit of the printer to the outlet.
Then, turn the main switch located on the front side of the main unit
to the "ON" position.
8) Check the operation.
<1>Check to see if the indicators on the operation panel of the scanner
module are lit and key operation is available.
<2>Place an original in the scanner module and check to see if copying
can be performed normally.
<3>For setting change of the printer drivers on the computer, see the
supplied operation manual.
Then, execute printing from the computer to check for proper
printing.
Screws
Screws
Cable for scanner
Centronics cable
LAN cable
If another peripheral device must be installed, carry out the following 
step at the end of the installation work.
"ON"
    "# $%&'(