DOWNLOAD Panasonic CF-30FTSAZAM Service Manual ↓ Size: 7.09 MB | Pages: 85 in PDF or view online for FREE

Model
CF-30FTSAZAM
Pages
85
Size
7.09 MB
Type
PDF
Document
Simplified Service Manual
Brand
Device
PC / NOTEBOOK COMPUTER
File
cf-30ftsazam.pdf
Date

Panasonic CF-30FTSAZAM Simplified Service Manual ▷ View online

7-16
7.2.5.
Setting the Display Unit
1. Fix the Display Unit using the 4 Screws. <N9> No1 to No4
2. Fix the Display Unit using the 2 Screws. <N10> No1, No2
Note:
Tighten the Screws in the numbered order (No1 to No2).
Tighten the Screws in the numbered order (No1 to No4).
Screws <N9>: DRYN4+J10FKL
Screws <N10>: DXSB4+15FNLB
7.2.6.
Setting the Handle and Power SW
1. Set the WM SW using the 2 Screws. <K2-42>
2. Set the Power SW.
3. Set the Handle.
4. Fix the Handle Base L and R using the 2 Screws. <K2-41>
5.
Screws <K2-41>: DRSN4+6FKLT
Screws <K2-42>: DXQT26+D4NLT
<N9>
<N9>
<N9>
<N9>
 Display Unit
<N10>
<N10>
No.1
No.2
No.3
No.4
No.1
No.2
Handle
Handle Base L
Handle Base R
Power
SW
<K2-41>
<K2-41>
WM SW
<K2-42>
7-17
7.2.7.
 Setting the Palm Top Cover Sheet, Palm Top Cover, Touch Pad Adhesion Seat, Touch
Pad SW Knob, LED PCB And SW LED PCB
1. Set the SW LED PCB.
2. Attach the Power LED Packing Sheet to the LED Spacer
Sheet.
3. Attach the LEDX6 Spacer Sheet on the SW LED PCB.
4. Fix the SW LED PCB using the Screw. <K2-42>
5. Attach the PW LED Sheet.
6. Pass the Cable of LED PCB through the hole 1 on the Top
Cabinet, then set the LED PCB.
7. Attach the LES Spacer Sheet on the LED PCB.
8. Set the touch Pad SW Knob In and Touch Pad SW Knob
9. Attach the TP Bottom Tape to the Touch Pad.
10. Pass the Cables of the Touch Pad through the hole 2 on the
Top Cabinet, set the touch Pad.
11. Attach the Touch Pad Adhesion Seat.
12. Fix the Palm Top Cover using the 5 Screws. <N29> No1 to
No5
13. Attach the Palm Top Cover Sheet.
Note:
Tighten the Screws in the numbered order (No1 to No5).
Screws <K2-42>: DRQT26+D4NLT
Screws <N29>: DRQT26+E3FNL
■ Preparation of SW LED FPC
Palm Top Cover Sheet
<N29>
<K2-42>
Palm Top Cover
PW LED Sheet
Touch Pad Adhesion Seat
Touch Pad
LED PCB
Touch Pad SW Knob
Touch Pad 
SW Knob In
PW LED
PCB
SW LED
PCB
<N29>
<N29>
<N29>
<N29>
No.4
No.2
No.5
No.3
No.1
Hole 1
Hole 2
0.5
    
0.5
1   1
Attach the Tape
Attach the Sheet
* Notes: 
1. Apply the load when attaching the parts.   20N to 30N (2 to 3Kgf)/cm2
Use a pinset.
White Full Line : Mountain Fold
Attach it not to overlap the SW leg.
Flex Notch Standard  0    1
White Dotted Line : Valley Fold
SW-LED FPC Ass'y
7-18
■ Assembly of Power SW
12    2
25    2
10    1
3    5
Attach the Battery Cushion
Attach the DC Gasket
Tighten of Screw  
Power SW LED 
Panel is set
FPC Power SW is set
Safety Working 
Attach the TP 
FPC Tape
Cable Power
Connection
* Notes:
1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2
Battery Pack Insertion Slot
Attach the Battery Slide Sheet (on Battery Cushion)
Avoid air leaking into it.  Avoid coming off 4 corners.
Fit to the line.
Ensure the upper and lower Flex holes match.
CAB Wall
Connection Direction
Connection Direction
Top
Bottom
Match the Cabinet slit 
and the tape slit. 
    Do not run the Cabinet 
edge out of the tape slit.
CAUTION
S1:Insulation  S2:Pinching Cables  S3:Sharp Edge
S4:Part No. Check  S5:Others
S3
7-19
■ Assembly of Palm Top Cover
Notes:
Attach the Pad
1. Apply the load when attaching the parts.  20N to 30N (2 to 3Kgf)/cm2
After attaching, trace around TP, 
SW and circumference with finger.
Ensure that the PAD and the button neck 
are attached with adhesive firmly.
A
B
Order of fixing
Screw
Screw
Screw
Screw
Screw
Tighten of
Screw 
Tighten of
Screw 
Tighten of
Screw 
Tighten of
Screw 
Tighten of
Screw 
Palm Top Cover 
is set
Touch Pad SW Knob 
Rubber is set
FFC 6LED is set
Attach the
PWB 6LED 
LEDX6 Spacer 
Sheet is set
Touch Pad SW Knob 
In is set
Attach the Pad WP Sheet
Palm Top 
Cover
Avoid running over the protrusion attached 
to the protrusion side of the upper Cabinet.
Put to the arrow direction 
and attach it.
Insert FPC into the hole 
of upper cabinet.
Do not come over 
the Pad edge.
Attach the TP 
Bottom Tape
Put to the left and set.
Protrusion
Insert FFC into the hole 
of upper cabinet.
Note: Separation
Notes for Separation
Do not attach the 
oil on both sides. 
Avoid running over!
Attach within the range of the 
upper Cabinet concave.
Palmtop Preparation
Attach the Washer 
Attach it not to cover the hole 
of LEDX6 Spacer Sheet. 
Attach the Washer 
(See below)
Process the speaker lead wire not to 
put inside when applying the load.
Using the pressure jig, Ensure the 
loads are applied equally.
Make sure the adhesive materials 
are attached closely on the whole 
side.
Page of 85
Display

Click on the first or last page to see other CF-30FTSAZAM service manuals if exist.