Panasonic CF-W5LWEZZBM Service Manual ▷ View online
65
9.3.
4.10. Assembly of the Touch Pad
PAD gasket
PAD cover
FFC (PAD)
Touch pad
PAD button
Work 2
Double-faced tape
DOUBLE SIDE TAPE
PIN Insertion
The foot is inserted
Work 1
Work 4
Work 3
Work 5
Touch pad is affixed
Corner match
Positioning
Pressurizing
The fingernail is
inserted
inserted
The fingernail is
inserted
inserted
Concave part outer match
Difference edge match
The flaking off paper is peeled off
Pressurizing
Puts in the ditch
After affixes, the flaking
off paper is peeled off
off paper is peeled off
The fingernail is hooked
The fingernail is
multiplied
multiplied
Hole externals match
Concave part outer match
Do not run aground
Do not run aground
Corner hole externals match
No turnip in the corner hole
PAD sheet
Pad LED cushion
FFC bend specification
PET tape
PET Tape
Bend
Mountain bend
Valley bend
From the tape edge side
180 degree bend
180 degree bend
From the tape center
180 degree bend
180 degree bend
Valley bend
From the tape center
180 degree bend
180 degree bend
Mountain bend
From the tape edge side
180 degree bend
180 degree bend
Order 1
Order 3
Order 4
Order 2
Finished
chart
66
9.3.
4.11. Assembly of the Disk Cover
Three bond
Three bond
Safety work
Safety work
The angle and spring are fixed
The angle and spring are fixed
Conduction cloth
Rib root standard
Rib root
standard
standard
Disk cover arm spring
Disk cover arm spring
Disk CV shaft angle
2. The slide is done and the pin
is inserted from the side.
is inserted from the side.
1. The pin is inserted through
the inside diameter of the spring.
the inside diameter of the spring.
Conduction cloth
Conduction cloth
It is surely pasted to the plating
part along the shape in spring.
part along the shape in spring.
Inserts under
the fingernail
the fingernail
Inserts under
the fingernail
the fingernail
The fingernail
is inserted.
is inserted.
The fingernail
is inserted.
is inserted.
The fingernail
is hooked.
is hooked.
The hanging fingernail is inserted.
Insert in the interior so as not to cause
the space between the hanging fingernail
and disk cover.
the space between the hanging fingernail
and disk cover.
Put the fingernail after
confirming the hanging
fingernail has been
surely inserted.
confirming the hanging
fingernail has been
surely inserted.
The hanging fingernail is inserted.
Insert in the interior so as not to cause
the space between the hanging fingernail
and disk cover.
the space between the hanging fingernail
and disk cover.
The installation order
67
DFKE0817ZA : There is painting
DFKE0817YA : There is no painting
DFKE0817YA : There is no painting
Disk angle MG
Wall root application
Wall root application
Disk angle sheet B
Disk angle
sheet B
sheet B
Disk angle sheet C
Disk angle
sheet C
sheet C
Do not run aground in the rib.
A-A
Cross section
Cross section
Disk angle sheet A
Disk angle sheet A
Disk angle MG
Fingernail insertion
Disk angle FPC cover
Disk angle FPC cover
externals match
externals match
Disk angle cushion
Screw
DXQT2+D25FNL
PET tape
From externals
From externals
to not protruding
to not protruding
Disk angle cushion
Disk angle cushion
Sheet metal corner match
(note)
It is confirmed that the point of the machine
screw on an opposite side does not protrude
beyond the angle after tightening the machine
screw.
It is confirmed that the point of the machine
screw on an opposite side does not protrude
beyond the angle after tightening the machine
screw.
Externals match
Externals match
Externals match
Concave part
Concave part
Concave part
Wall application
Wall application
Wall application
Wall application
Corner hole corner match
Round hole central distribution
68
Disk angle
Order 2
The slide is done left and the point
is inserted under the angle.
The slide is done left and the point
is inserted under the angle.
Disk angle
Order 1
The fingernail is abolished at the right
of the angle switching off lack part.
The fingernail is abolished at the right
of the angle switching off lack part.
Order 3
The pin is done in the slide
and inserts in the ditch.
The pin is done in the slide
and inserts in the ditch.
Installation completion chart
The fingernail in three places
must been inserted.
must been inserted.
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.