9.3.5. Assembly knowhow of the Bottom Case
9.3.5.1. Putting RJ Cable Bling Sheet / Hinge Buck Up Sheet / Cable Fix Sheet
Bottom case ass’y
Bottom cutting lack shape standard
Hits to the bottom in the cabinet and putting.
Hits to the cabinet corner and putting.
Puts only on this respect.
Other flaking off paper is not peeled off.
Other flaking off paper is not peeled off.
Left interior hinge part
The convex part is matched to
the shape of the cabinet and puts.
the shape of the cabinet and puts.
Hinge backup sheet
The cabinet heaven side is set
to the cushion heaven side.
to the cushion heaven side.
Both sided
tape putting
tape putting
Both sided
Both sided
tape putting
tape putting
Both sided
tape putting
tape putting
RJ cable
blind sheet
blind sheet
Cable fix sheet
9.3.5.2. Setting Antenna Board and Line processing (1)
Safety work
<The tightening order>
DC jack is
installed
in bottom.
installed
in bottom.
Processes with the boss
between ribs.
between ribs.
Processes to the
ditch of bottom.
ditch of bottom.
It is confirmed that the
terminal becomes straight.
terminal becomes straight.
The board is made to
draw in the under and
screw is tightened.
draw in the under and
screw is tightened.
Board is placed between
Bottom Case and installs.
Bottom Case and installs.
Board is placed between
Bottom Case and installs.
Bottom Case and installs.
Screw
DXQT2+E6FNL
DXQT2+E6FNL
It is confirmed that the screw hole of the board
is corresponding to the machine screw hole of bottom,
and tightens the screw.
is corresponding to the machine screw hole of bottom,
and tightens the screw.
a
b
Safety work
Safety work
When the screw is tightened,
the VGA connector is drawn
on and tightened.
the VGA connector is drawn
on and tightened.
70
9.3.5.4. Line processing HDD FPC
9.3.5.3. Assenbly of the Antenna Cover (L)
Safety work
Antenna cover
Antenna cover
Antenna cover
DC jack holder
installation
installation
Hook is hooked to
the bottom case
the bottom case
Hook is hooked to
the bottom case
the bottom case
Hook is hooked to
the bottom case
the bottom case
LCD cable fix sheet
It is confirmed
that the terminal
becomes straight.
that the terminal
becomes straight.
Safety work
PET tape
FPC is fixed.
HDD FPC is fixed with a two sided tape.
The vicinity of the root is
prevented from floating.
prevented from floating.
HDD FPC is processed internally.
FPC must not run
aground in Pin.
aground in Pin.
71
9.3.5.5. Putting Tape and Sheet
FFC bend part
edge standard
edge standard
B oth sided tape
Processing
between bosses
between bosses
The part where conduction
cloth comes in succession
is firmly suppressed.
cloth comes in succession
is firmly suppressed.
The position of a red line
puts out the position with
a treatment device.
puts out the position with
a treatment device.
Conduction cloth
Antenna board R
Antenna board R
Antenna board R
Processing in the vicinity
of Bottom difference root
of Bottom difference root
Screw
Screw
Screw
Screw
Screw
Screw
Conduction cloth is processed
straight next to the boss.
straight next to the boss.
Boss central standard
Refer to the affixation
specification to Figure 2
specification to Figure 2
The coaxial cable is processed
between the battery and the boss.
between the battery and the boss.
Convex side
Fixation after processing
not put on convex side of
bottom is done
not put on convex side of
bottom is done
Figure 2
Figure 1
Boss central
standard
standard
Refer to
Figure 1
Figure 1
Slack is processed
under the tape.
under the tape.
A both sided tape is fixed while installed in the
FFC positional putting out treatment device.
FFC positional putting out treatment device.
Fixes while installed in the
FFC positional putting out
treatment device.
FFC positional putting out
treatment device.
A remaining amount
is inserted under the
substrate.
is inserted under the
substrate.
A remaining amount is inserted
under the substrate.
Do not process the cable under
MIC,H/P jack.
under the substrate.
Do not process the cable under
MIC,H/P jack.
Installation placed
between bottom case
between bottom case
Fixes with the tape after
the cable is processed below.
(Securing of drive and clearance)
the cable is processed below.
(Securing of drive and clearance)
Affixation matched to plinth
externals (left chart red line)
A curved surface side is affixed
to bottom case.
externals (left chart red line)
A curved surface side is affixed
to bottom case.
(Contact prevention
with drive spacer)
with drive spacer)
Safety work
RJ cable sheet
Modem connector installation
USB board installation
Inserts in positioning pin.
Inserts in positioning Pin.
The cable is drawn
out straight.
out straight.
Bottom corner
standard
Putting
standard
Putting
USB cable
spacer
spacer
Processing of pin to inside
Modem cable : Under
USB cable : Upper
USB cable : Upper
Processing of pin
to inside
Modem cable : Under
USB cable : Upper
to inside
Modem cable : Under
USB cable : Upper
Cable positional accuracy is put
out about this size with a cable
positioning treatment device.
out about this size with a cable
positioning treatment device.
Modem cable is prevented
from running aground to the boss.
from running aground to the boss.
Processing which passes side of connector
Slack is lost by processing the cable in the
direction of the arrow when slackening.
Slack is lost by processing the cable in the
direction of the arrow when slackening.
Safety work
Safety work
Safety work
Processing of boss
to inside
The cable must not
run aground on the boss.
to inside
The cable must not
run aground on the boss.
Safety work
The PET tape wrapping part
of modem cable is processed
to the part HDD FPC.
of modem cable is processed
to the part HDD FPC.
72
RJ cable sheet
Do not run
aground
to the pin.
aground
to the pin.
Do not run
aground
to the pin.
aground
to the pin.
Do not run
aground
to the pin.
aground
to the pin.
Do not run
aground
to the pin.
aground
to the pin.
Do not run
aground
to the pin.
aground
to the pin.
Do not run
aground
to LAN co-
nnector
aground
to LAN co-
nnector
Neither WAN cable nor LAN
cable must come in succession.
cable must come in succession.
A remaining amount is
affixed on an opposite side.
affixed on an opposite side.
The cable is rolled and
a two sided tape is put.
a two sided tape is put.
Be sure to bond a two sided tape picking
the board and the cable when you fix the tape.
the board and the cable when you fix the tape.
fixes with the tape by processing
the cable internally.
the cable internally.
LAN cable in the pin is processed.
Do not run aground to the pin.
Do not run aground to the pin.
The flaking off paper of sheet is
peeled off, sheet is put on bottom
and the cable is fixed.
peeled off, sheet is put on bottom
and the cable is fixed.
The cable is processed
to the cutting lack part.
to the cutting lack part.
Connector
connection
connection
Refer to the putting
specification of the
tape to figure A.
specification of the
tape to figure A.
Processing of board
to the under
to the under
LAN cable is processed
in the pin.
in the pin.
figure A
Processing of pin
to the under
Do not run aground
to the pin.
to the under
Do not run aground
to the pin.
LAN cable in the pin is processed.
Do not run aground to the pin.
Do not run aground to the pin.
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.