DOWNLOAD Panasonic CF-W5LWEZZBM Service Manual ↓ Size: 32.07 MB | Pages: 127 in PDF or view online for FREE

Model
CF-W5LWEZZBM
Pages
127
Size
32.07 MB
Type
PDF
Document
Service Manual
Brand
Device
PC / NOTEBOOK COMPUTER
File
cf-w5lwezzbm.pdf
Date

Panasonic CF-W5LWEZZBM Service Manual ▷ View online

49
9.3.3.3. Putting PET tapes
9.3.3.2. Assembly of the MDC MODEM
MDC plate fixed
treatment device
Puts to the boss side
Puts to the boss side
Board’s edge match
0   1mm
MDC modem
Affixes to the back
of board
Modem cable
PET tape
Cover the connector part. 
Hits to the treatmen 
to device
10   3mm
Screw
MDC plate
Safety work
Safety work
Cable’s root is surely suppressed
Screw a
Screw b
Processes on the capacitor
Processes between capacitors
   The order of tightening screw :
Screw : DXQT2+D25FNL
PET tape
DAI externals match
Affixes between DAI
Processes next to the connector
Connector connection
50
9.3.3.4. Putting Main PW Sheet
Main sub cable
USB b  oard
MAIN PWB sheet 1 W5
Connector connection
Connector connection
Connector connection
Connector connection
Two sided tape putting
Square hole
Square hole
Do not get on the 
machine screw hole
Corner hole part DAI of the CIP set is matched and affixes
Affix without running aground on CPU DAI.
Board externals match
There must not be disarrangement from 
board externals. 
PCMCIA-MAIN sheet
Main board
Touch the power SW edge
Insert on the tip of the foot under of MDC board
Refer to the explanation 
for the installation. 
The lever is drawn to 
the right before building in
Card bus ejector
The lever is drawn to the 
left before building in. 
Card bus ejector’s sheet metal bend part is inserted in 
the corner hole part. (An opposite direction is also the same)
Multiply the hook surely. (There must not be floatage)
Square hole
Bend
Explanation
9.3.3.5. Assembly of the PCMCIA Ejector
51
9.3.3.6. Assembly of the LAN Cable
Safety work
Safety work
Purpose :
  Resisting pressure cover
Purpose :
  Resisting pressure
  cover
Capton tape
Protect the cable
completely. 
The cable keeps parallel
to the case side and is put. 
Safety work
Protect the cable
completely. 
From externals
From externals
Capton tape
Turns on an opposite side
The FFC corner is set to
the both sided tape corner After putting, the flaking off
paper on the surface is not
peeled off. 
(Flakes off in a finished pro-
cess. )
Turns on an opposite side
Both sided tape
Back
Front
DVD FFC gasket cloth
DVD FFC
9.3.3.7. Assembly of the DVD FFC
52
9.3.3.8. Screw tightening of Main Board
Insulation sheet
Purpose : Resisting
                 pressure measures
DVD FCC
Capacitor wall application
Screw
DRQT2+G6FKL
Screw
DFHE5025XA
Safety work
Safety work
Connector connection
Blue side
(Reinforcement board)
Connector
root application
LAN cable Ass’y
OK processing
Processing on tape
(The tape is not fixed)
NG processing
Connector connection
Safety work
Lithium battery
PET tape
The tape is put along
the connector externals. 
9.3.3.9. Line processing LAN cable
Page of 127
Display

Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.