Panasonic CF-W5LWEZZBM Service Manual ▷ View online
49
9.3.3.3. Putting PET tapes
9.3.3.2. Assembly of the MDC MODEM
MDC plate fixed
treatment device
treatment device
Puts to the boss side
Puts to the boss side
Board’s edge match
0 1mm
0 1mm
MDC modem
Affixes to the back
of board
of board
Modem cable
PET tape
Cover the connector part.
Hits to the treatmen
to device
to device
10 3mm
Screw
MDC plate
Safety work
Safety work
Cable’s root is surely suppressed
Screw a
Screw b
Processes on the capacitor
Processes between capacitors
The order of tightening screw :
Screw : DXQT2+D25FNL
PET tape
DAI externals match
Affixes between DAI
Processes next to the connector
Connector connection
50
9.3.3.4. Putting Main PW Sheet
Main sub cable
USB b oard
MAIN PWB sheet 1 W5
Connector connection
Connector connection
Connector connection
Connector connection
Two sided tape putting
Square hole
Square hole
Do not get on the
machine screw hole
machine screw hole
Corner hole part DAI of the CIP set is matched and affixes
Affix without running aground on CPU DAI.
Affix without running aground on CPU DAI.
Board externals match
There must not be disarrangement from
board externals.
board externals.
PCMCIA-MAIN sheet
Main board
Touch the power SW edge
Insert on the tip of the foot under of MDC board
Refer to the explanation
for the installation.
for the installation.
The lever is drawn to
the right before building in
the right before building in
Card bus ejector
The lever is drawn to the
left before building in.
Card bus ejector’s sheet metal bend part is inserted in
the corner hole part. (An opposite direction is also the same)
Multiply the hook surely. (There must not be floatage)
the corner hole part. (An opposite direction is also the same)
Multiply the hook surely. (There must not be floatage)
Square hole
Bend
Explanation
9.3.3.5. Assembly of the PCMCIA Ejector
51
9.3.3.6. Assembly of the LAN Cable
Safety work
Safety work
Purpose :
Resisting pressure cover
Resisting pressure cover
Purpose :
Resisting pressure
cover
Resisting pressure
cover
Capton tape
Protect the cable
completely.
completely.
The cable keeps parallel
to the case side and is put.
to the case side and is put.
Safety work
Protect the cable
completely.
completely.
From externals
From externals
Capton tape
Turns on an opposite side
The FFC corner is set to
the both sided tape corner After putting, the flaking off
the both sided tape corner After putting, the flaking off
paper on the surface is not
peeled off.
(Flakes off in a finished pro-
cess. )
peeled off.
(Flakes off in a finished pro-
cess. )
Turns on an opposite side
Both sided tape
Back
Front
DVD FFC gasket cloth
DVD FFC
9.3.3.7. Assembly of the DVD FFC
52
9.3.3.8. Screw tightening of Main Board
Insulation sheet
Purpose : Resisting
pressure measures
pressure measures
DVD FCC
Capacitor wall application
Screw
DRQT2+G6FKL
Screw
DFHE5025XA
Safety work
Safety work
Connector connection
Blue side
(Reinforcement board)
(Reinforcement board)
Connector
root application
root application
LAN cable Ass’y
OK processing
Processing on tape
(The tape is not fixed)
(The tape is not fixed)
NG processing
Connector connection
Safety work
Lithium battery
PET tape
The tape is put along
the connector externals.
the connector externals.
9.3.3.9. Line processing LAN cable
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.