DOWNLOAD Panasonic CF-W5LWEZZBM Service Manual ↓ Size: 32.07 MB | Pages: 127 in PDF or view online for FREE

Model
CF-W5LWEZZBM
Pages
127
Size
32.07 MB
Type
PDF
Document
Service Manual
Brand
Device
PC / NOTEBOOK COMPUTER
File
cf-w5lwezzbm.pdf
Date

Panasonic CF-W5LWEZZBM Service Manual ▷ View online

57
LCD metal damper B
HDD FPC
HDD FPC edge sheet
The half is turned previously after putting and put. 
The position is matched in this order. 
a
b
a’
b’
Mountain 
case
Mountain 
case
Valley
case
Valley
case
Valley
case
Safety work
Safety work
Corner
standard
HDD FPC
Connection
Connector insertion
OK photograph
The silk line is parallel. 
Capacitor externals standard
Capacitor externals
standard
There is an inclination
in the silk line.
(Insertion is imperfect.)
Connector insertion
NG photograph
PET Tape
Affixes along shape
58
9.3.3.16. Setting the Main Board
9.3.3.15. Assembly of the DC-IN Cable
B
A
Bends in the vicinity of the tube root. 
Bends in the vicinity of the 
connector root. 
Do not give the terminal the load 
while working. 
The shrinkage tube is bent
from the root. 
Ferrite sheet wrapping is unnecessary. 
Ferrite sheet wrapping
is unnecessary. 
Ferrite sheet wrapping
is unnecessary. 
Safety work
Safety work
Safety work
(6)
(6)
Main board
Ext port connector
is previously inserted. 
The cable is prevented from running aground
in the rib and the boss of bottom case. 
Bottom case
Safety work
59
LAN cable
Boss
LAN cable
LAN cable is inserted under
LAN cable fix sheet. 
LAN cable is processed
to boss’s interior.  
Sheet is pulled in the direction
of the arrow and a two sided tape
is pasted.   
LAN SW knob
Insertion after
installation of Main board
It is confirmed that SW lever
has been surely inserted in
the ditch of knob. 
Insertion after installation
of Main board
Bottom case
Bottom case
WLAN SW
(OFF : Left side  ON : Right side)
It is confirmed that WLAN SW has
become turning off (left side) before
building in bottom case. 
LAN cable
Main board
LAN cable / antenna cable
is drawn out from the under
between boss A and B. 
Boss A
Boss B
HDD FPC is inserted
under the board.
DVD FCC / coin battery cable
is drawn out from boss B the under. 
Connector edge match
Pad button sheet
Cover pad SW surely.
Connector edge match
60
Top case assy
DVD PWB sheet
PCMCIA stopper 
PCMCIA stopper 
cushion
Do not overflow from case. 
Management size : 0    1mm
Thing without floatage
Thing without floatage
(Coming to the surface is 0.5mm or less)
(Coming to the surface is 0.5mm or less)
Affixation within the range 
of plane part of length wall
of plane part of length wall
Affixes on 
the side
Affixes in the package corner match
Affixes in the package corner match
PCMCIA stopper 
cushion
(Coming to the surface is 0.5mm or less)
Affixation within the range 
of plane part of length wall
Affixes in the package corner match
Case externals match
Refer to next page
Welding
DVD cover click
The slide is done and is made to install
Break spring
Break lever
Break lever
Break pad
Brake completion chart
Brake lever built-in figure
Respect with shape is the above
The back photograph
Be sure not to do the slide 
with struck the rib
Do not touch the bonding side when you put the 
brake pad
9.3.4. Assembly knowhow of the Top Case
9.3.4.1. Assembly of the DVD Cover
9.3.4.2. Assembly of theBreak Lever
Page of 127
Display