Panasonic CF-W5LWEZZBM Service Manual ▷ View online
45
9.3.2.13. Assembly of the WWAN Board
9.3.2.14. Putting Tapes for WM Cable
WWAN board
WM cable
Screw
Screw
Rear wall application
LCD hook WAN
LCD hook Wan installation standard
Connection
Rear wall application
There is no order specification
excluding a specified part.
excluding a specified part.
The oreder of tightening screw (LCD hook WAN) :
The oreder of tightening screw (WWAN board) :
The oreder of tightening screw (WWAN board) :
PET tape
Refer to Figure 1
Root fixation
The cable must not stretch.
The cable must not stretch.
A two sided tape of the cable after the cable position
A two sided tape of the cable after the cable position
of Figure 1 is put out is affixed (cable fixation).
of Figure 1 is put out is affixed (cable fixation).
of Figure 1 is put out is affixed (cable fixation).
A two sided tape of the cable after the cable position
of Figure 1 is put out is affixed (cable fixation)
of Figure 1 is put out is affixed (cable fixation)
This is affixed along shape so that Conduction Cloth
should not float.
should not float.
This is affixed along shape so that conduction cloth
should not float.
should not float.
Safety work
Conduction cloth
The convex part is
matched to a red line.
matched to a red line.
Conductive cloth
must not hang to
PET tape
must not hang to
PET tape
Edge side standard
of conduction cloth
of conduction cloth
46
9.3.2.16. Setting Spacer CU on Antenna Cover
WWAN antenna (MAIN)
Screw
WWAN antenna (SUB)
Cable blind sheet
Screw
Screw
Screw
Screw
The coaxial cable connector is processed
in the corner hole of the substrate
in the corner hole of the substrate
Paper tape
Cable fixed sheet
Clamp
Clamp
The cable is fixed
with the paper tape
with the paper tape
Corner hole externals standard
This is clamped on the right side
This is clamped on the right side
This is clamped
This is clamped
in the upper part
in the upper part
Clamp
This is clamped on the right side
This is clamped
in the upper part
After the cable is processed to the ditch of rear,
cable fixed sheet is affixed
cable fixed sheet is affixed
NEXT
Wall application affixation
Safety work
The oreder of tighting screw:
Antenna cover
Spacer CU
Spacer CU
Spacer CU
Spacer CU is put on the boss before antenna cover is installed.
47
9.3.2.18. Assembly of the Hinge Cover (L), (R)
Engages with LCD front
goods which have prepared
LCD rear
goods which have prepared
LCD rear
Refer to Figure 1
Refer to Figure 2
Refer to Figure 2
Multiply the fingernail
in 16 all places surely
SIMM cover WAN
Insertion
Antenna cover
Lock engagement
The fingernail in four places is inserted
PANASONIC LABEL
PANASONIC LABEL
Panasonic label
Cable drawing out route
Cable drawing out route
Safety work
Safety work
Safety work
Safety work
The cable is drawn out
between front and rear.
between front and rear.
The cable is drawn out
between front and rear.
between front and rear.
Hinge cover installation OK figure
Hinge cover installation NG figure
Hinge cover R
(Note)
Because the fixed lock medicine is used,
the screw cannot be repeated and be used.
Because the fixed lock medicine is used,
the screw cannot be repeated and be used.
Screw
Screw
Install the back pushing
when you tighten the screw.
(Left side is similarly executed.)
(Space generation prevention
of cover)
when you tighten the screw.
(Left side is similarly executed.)
(Space generation prevention
of cover)
Screw
Screw
a
a
b
b
Hinge cover L
The cover externals and the
front rib are parallel
(agreement).
front rib are parallel
(agreement).
The cover externals are not
parallel to the front rib. Inclines.
parallel to the front rib. Inclines.
The cable is processed under the axis.
It is confirmed that the cable does not narrow
between cabinets.
It is confirmed that the cable does not narrow
between cabinets.
TP cable
The order of tightening screw:a b
Screw DRHM0076ZA
Screw DRHM0076ZA
Safety work
The cable is processed under
the axis . It is confirmed that
the cable does not narrow
between cabinets.
the axis . It is confirmed that
the cable does not narrow
between cabinets.
Safety work
9.3.2.17. Assembly of the LCD Rear
48
9.3.3. Assembly knowhow of the Main Board
9.3.3.1. Putting tapes for Memory Sheet of top side
Main board
Removes with tweezers etc.
(note)
It is noted that there is no damage
of an internal terminal.
(note)
It is noted that there is no damage
of an internal terminal.
Capton tape removing
USB CN sheet
Connector root
application affixation
application affixation
Board slit externals match
There must not be running aground
Top side memory sheet
Board slit externals match
0 1mm
It is confirmed that top side memo-
ry sheet does not run aground on
the switch.
ry sheet does not run aground on
the switch.
Bond neatly for the memory heat
radiation purpose material
radiation purpose material
Safety work
Safety work
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.