DOWNLOAD Panasonic CF-W5LWEZZBM Service Manual ↓ Size: 32.07 MB | Pages: 127 in PDF or view online for FREE

Model
CF-W5LWEZZBM
Pages
127
Size
32.07 MB
Type
PDF
Document
Service Manual
Brand
Device
PC / NOTEBOOK COMPUTER
File
cf-w5lwezzbm.pdf
Date

Panasonic CF-W5LWEZZBM Service Manual ▷ View online

73
9.3.6. Assembly knowhow of the Body
9.3.6.1. Setting LCD
9.3.6.2. Line processing LCD Cable (bottom case side)
Screw
Screw
b
a
LCD unit
The hinge is drawn up and the screw is tightened. 
The order of tightening screw (DXQT26+D5FNL) : a     b
Connection order
Inverter cable
LCD cable
Conductive cloth
Processes that cable should 
not run aground on the DC-
jack holder. 
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Sheet’s edge and edge 
are matched and put.
(The inclination part is 
pressurized. ) 
The work order
Cable is processed under the 
point hanging part. 
(Floatage prevention)
Cable is processed to 
the DC-jack holder.
Cable is processed 
to the ditch. 
Processes so that sheet should 
not run aground in the screw 
hole land. 
(The figure below is state 
after wiring)
VGA connector
Sheet
Cable
Bottom case
Main board
Screw hole land
Sheet must not 
roll the holder. 
The space is secured. 
It is not possible to 
recycle when flaking off. 
Put the conductive cloth
Standard
74
9.3.6.3. Assembly of the Top Case
Gasket 
cloth
DVD heat inslation sheet
Puts it on the drive bottom.
Puts it on the drive side.
Range which you may grip
The connector is connected. 
The center of Pin is a standard. 
Surely pressurizes 
between Pin and 
Pin. 
Preparation Specification
DVD drive
DVD drive
Pressurizes tape at the time of the tape 
pressurizing with the drive damper suppressed. 
(When suppressing, with tools)
The pick stopper is removed before the drive 
damper is pressurized. 
The removed pick stopper is annulled. 
Arranges it under Cable. 
Arranges it under Board. 
Distributes at 
the center. 
Connector externals match
The damper (3 places) must not float after 
affixing the tape.
Suppress the part FFC again when floating.  
PET tape
9.3.6.4. Setting Disk Cover
75
Hook is hooked
When g is tightened, part       is suppressed and tightened. 
Screw 
(DXQT26+D8FCL)
Screw (DXQT2+E6FCL)
Screw 
(DXQT2+E6FNL)
Screw
(DXQT2+E6FNL)
Screw (DFHE5025XA)
Cable does not run 
aground on pin. 
Safety Work
Safety Work
Safety Work
Connection
Processes it 
under the pin. 
Cable does not 
run aground. 
Screw 
(DXQT2+E6FNL)
The order of tightening screw : a     J
Screw 
(DXQT26+D8FCL)
Top case
Safety Work
Safety Work
Safety Work
Safety Work
Does not run 
aground in the 
LAN connector. 
Neither WAN cable nor LAN 
cable come in succession. 
Does not run 
aground in the rib. 
Does not run aground 
in the bottom rib. 
Safety Work
Safety Work
The tool is inserted between 
the bottom cases with cable. 
Tool insertion chart
Does not run 
aground in 
the rib. 
Does not run 
aground in the 
LAN connector. 
Top Case 
engagement
The connector 
is connected. 
The connector 
is connected. 
After connects the connector, and hinge 
department Wiring is confirmed, top case is 
installed in the bottom case. 
It is confirmed that FFC is processed 
straight when top case engages. 
9.3.6.5. Assembly of the Top Case
76
9.3.6.6. Assembly of the Disk Cover and Antenna Cover R
Screw (DXQT2+E12FNL)
The disk angle is drawn 
below and tightened. 
The order of tightening screw : 
Insert it in the positioning pin surely. 
Disk cover preparation goods
Screw (DXHM0057ZA)
Screw 
(DXQT2+E6FNL)
The installation order : 1
The installation order : 2
9.3.6.7. Assembly of the Keyboard
Antenna cover R
Insert antenna cover in the 
bottom side first and installs 
pushing from the side. 
Installation completion chart
Antenna cover installation chart
Keyboard
Sheet
Inclination 0.5m or less
Inclination 0.5m or less
Edge side 
match of hole 
of keyboard
Edge side match of hole of keyboard
Page of 127
Display

Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.