Panasonic CF-W5LWEZZBM Service Manual ▷ View online
73
9.3.6. Assembly knowhow of the Body
9.3.6.1. Setting LCD
9.3.6.2. Line processing LCD Cable (bottom case side)
Screw
Screw
b
a
LCD unit
The hinge is drawn up and the screw is tightened.
The order of tightening screw (DXQT26+D5FNL) : a b
Connection order
Inverter cable
LCD cable
Conductive cloth
Processes that cable should
not run aground on the DC-
jack holder.
not run aground on the DC-
jack holder.
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Sheet’s edge and edge
are matched and put.
(The inclination part is
pressurized. )
are matched and put.
(The inclination part is
pressurized. )
The work order
Cable is processed under the
point hanging part.
(Floatage prevention)
point hanging part.
(Floatage prevention)
Cable is processed to
the DC-jack holder.
the DC-jack holder.
Cable is processed
to the ditch.
to the ditch.
Processes so that sheet should
not run aground in the screw
hole land.
not run aground in the screw
hole land.
(The figure below is state
after wiring)
after wiring)
VGA connector
Sheet
Cable
Bottom case
Main board
Screw hole land
Sheet must not
roll the holder.
roll the holder.
The space is secured.
It is not possible to
recycle when flaking off.
recycle when flaking off.
Put the conductive cloth
Standard
74
9.3.6.3. Assembly of the Top Case
Gasket
cloth
cloth
DVD heat inslation sheet
Puts it on the drive bottom.
Puts it on the drive side.
Range which you may grip
The connector is connected.
The center of Pin is a standard.
Surely pressurizes
between Pin and
Pin.
between Pin and
Pin.
Preparation Specification
DVD drive
DVD drive
Pressurizes tape at the time of the tape
pressurizing with the drive damper suppressed.
(When suppressing, with tools)
pressurizing with the drive damper suppressed.
(When suppressing, with tools)
The pick stopper is removed before the drive
damper is pressurized.
The removed pick stopper is annulled.
damper is pressurized.
The removed pick stopper is annulled.
Arranges it under Cable.
Arranges it under Board.
Distributes at
the center.
the center.
Connector externals match
The damper (3 places) must not float after
affixing the tape.
Suppress the part FFC again when floating.
affixing the tape.
Suppress the part FFC again when floating.
PET tape
9.3.6.4. Setting Disk Cover
75
Hook is hooked
When g is tightened, part is suppressed and tightened.
Screw
(DXQT26+D8FCL)
(DXQT26+D8FCL)
Screw (DXQT2+E6FCL)
Screw
(DXQT2+E6FNL)
(DXQT2+E6FNL)
Screw
(DXQT2+E6FNL)
(DXQT2+E6FNL)
Screw (DFHE5025XA)
Cable does not run
aground on pin.
aground on pin.
Safety Work
Safety Work
Safety Work
Connection
Processes it
under the pin.
under the pin.
Cable does not
run aground.
run aground.
Screw
(DXQT2+E6FNL)
(DXQT2+E6FNL)
The order of tightening screw : a J
Screw
(DXQT26+D8FCL)
(DXQT26+D8FCL)
Top case
Safety Work
Safety Work
Safety Work
Safety Work
Does not run
aground in the
LAN connector.
aground in the
LAN connector.
Neither WAN cable nor LAN
cable come in succession.
cable come in succession.
Does not run
aground in the rib.
aground in the rib.
Does not run aground
in the bottom rib.
in the bottom rib.
Safety Work
Safety Work
The tool is inserted between
the bottom cases with cable.
the bottom cases with cable.
Tool insertion chart
Does not run
aground in
the rib.
aground in
the rib.
Does not run
aground in the
LAN connector.
aground in the
LAN connector.
Top Case
engagement
engagement
The connector
is connected.
is connected.
The connector
is connected.
is connected.
After connects the connector, and hinge
department Wiring is confirmed, top case is
installed in the bottom case.
department Wiring is confirmed, top case is
installed in the bottom case.
It is confirmed that FFC is processed
straight when top case engages.
straight when top case engages.
9.3.6.5. Assembly of the Top Case
76
9.3.6.6. Assembly of the Disk Cover and Antenna Cover R
Screw (DXQT2+E12FNL)
The disk angle is drawn
below and tightened.
below and tightened.
The order of tightening screw :
Insert it in the positioning pin surely.
Disk cover preparation goods
Screw (DXHM0057ZA)
Screw
(DXQT2+E6FNL)
(DXQT2+E6FNL)
The installation order : 1
The installation order : 2
9.3.6.7. Assembly of the Keyboard
Antenna cover R
Insert antenna cover in the
bottom side first and installs
pushing from the side.
bottom side first and installs
pushing from the side.
Installation completion chart
Antenna cover installation chart
Keyboard
Sheet
Inclination 0.5m or less
Inclination 0.5m or less
Edge side
match of hole
of keyboard
match of hole
of keyboard
Edge side match of hole of keyboard
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.