Panasonic CF-W5LWEZZBM Service Manual ▷ View online
77
Edge match of hole of corner
Keyboard edge sheet
Edge match of hole of corner
Keyboard edge sheet
Over sheet bends from the
edge side of the keyboard and
pastes to the surface.
edge side of the keyboard and
pastes to the surface.
Over sheet bends from the
edge side of the keyboard and
pastes to the surface.
edge side of the keyboard and
pastes to the surface.
Keyboard FFC edge match
Two sided tape
Both sided tape
Both sided tape
Keyboard sheet
Keyboard tape
Edge match of press hole
Edge match
of press hole
of press hole
Keyboard FFC is bent.
With a pin of 1 or more the bend (bend on inside).
As for the bend, the possibility to disconnect is in 1
or less.
With a pin of 1 or more the bend (bend on inside).
As for the bend, the possibility to disconnect is in 1
or less.
Order 3
Order 1
Order 2
RCH rubber Affixation
Connection
Preparation goods of keyboard
78
9.3.6.8. Assembly of the Heat Spreader
9.3.6.9. Setting Keyboard
The flaking off papersa (6 places A to F) of a two sided tape are peeled off.
Heat spleader
Heat radiation grease
Spread with a tool.
Over sheet is pasted
on an opposite side.
on an opposite side.
Over sheet is pasted
on an opposite side.
on an opposite side.
PET
tape
tape
Safety Work
Safety Work
There is a possibility to damage sheet and cable
when the part where aluminum is thin bends.
Returns it if bending. However, use not bare-
handed but the tool (pliers etc).
when the part where aluminum is thin bends.
Returns it if bending. However, use not bare-
handed but the tool (pliers etc).
Attention
Installs it in Top case’s dent part.
Does not run aground on the
keyboard installation side.
Does not run aground on the
keyboard installation side.
Pressure is pressurized by
or more.
or more.
It is confirmed that edge part where on
keyboard FFC is surely covered with the
PET tape.
keyboard FFC is surely covered with the
PET tape.
Arrangement
standard
standard
79
Hook is hooked
Hook is hooked
Inserts in corner hole part of the top case
Insert under the top case
Insert between disk angle
and disk angle FPC cover
and disk angle FPC cover
After the hook is inserted, KBD is drawn up.
Keyboard pressurizing point
Disk Cover is opened and keyboard FPC is confirmed.
OK
NG
Keyboard FPC not protrude.
Keyboard FPC protrude.
It is confirmed that the keyboard hook
has been inserted in the angle.
has been inserted in the angle.
80
9.3.6.11. The tightening screw of Bottom Case
9.3.6.10. Setting DIMM Cover
DIMM cover sheet
DIMM cover
DIMM cover is arranged
making not run aground
in screw tightening respect.
making not run aground
in screw tightening respect.
Rib application
DIMM heat sheet
For the cutting lack part to get
on the boss and so as not to go
up, affixation
on the boss and so as not to go
up, affixation
Do not run aground on the edge
of the DIMM cover surroundings
of the DIMM cover surroundings
The position where the DIMM cover and DIMM heat sheet
is put is this corner line match.
is put is this corner line match.
Put the
DIMM thermal sponge
DIMM thermal sponge
(Space )
OK
NG
TOP
J18
Screw (a) : DXHM0039ZA
Screw (b) : DXHM0057ZA
Screw (c) : DXQT2+E12FNL
Screw (d) : DXQT2+E10FNL
Screw (e) : DXQT2+D4FNL
Screw (f) : DRHM0092ZA
Screw (b) : DXHM0057ZA
Screw (c) : DXQT2+E12FNL
Screw (d) : DXQT2+E10FNL
Screw (e) : DXQT2+D4FNL
Screw (f) : DRHM0092ZA
Screw (a)
Screw (b)
Screw (b)
Screw (c)
Screw (d)
Screw (e)
Screw (f)
When the screw is tightened, the bottom
case is held and the tool is used.
case is held and the tool is used.
The order of tightening screw :
Keyboard hook
Keyboard hook
(Refer to a left chart)
Does not run aground on the rib.
It is confirmed that cable is not narrowing with top case
between the bottom cases. LCD cable is exchanged if
narrowing.
between the bottom cases. LCD cable is exchanged if
narrowing.
~
b
b
Screw (DFHE5035ZB)
Screw (K1YE50000022)
The order of tightening screw : a d
Click on the first or last page to see other CF-W5LWEZZBM service manuals if exist.