Sony SAL70200G2 Service Manual ▷ View online
2-10
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP12
1. Affix the spring protection sheet to the G19 holder ring, starting from the cut groove for aperture connect lever in the counterclockwise
direction. Place the center of sheet in the hole for the outer tube block fixing screw.
Note:
Note:
Do not protrude the spring protection sheet on the slant surface at the inner side of G19 holder ring.
As the spring protection sheet is rectangular in shape, affix it while deforming a little by little.
2. Thread the aperture connect lever of outer barrel block in the hole of connect barrel unit.
3. Link the aperture connect lever to the pin of aperture operation plate unit and insert four screws in the holes.
3. Link the aperture connect lever to the pin of aperture operation plate unit and insert four screws in the holes.
Note:
It is not necessary to tighten the screws at this moment.
4. Lift up the outer tube block and lean it a little. Insert the back adjustment washer (0.5mm) in the gap between outer barrel block and 5
group ball frame block (2 locations of both sides).
Note:
Note:
For the number of back adjustment washer, refer to 5-4-3 Flange-back (f F) adjustment .
5. Rotate clockwise the outer tube block to eliminate a play, viewing from the mount side and tighten firmly four screws.
Outer Tube Block
Outer Tube Block
Aperture Connect
Lever
Lever
Spring Protection
Sheet
Sheet
Cut groove for
aperture connect lever
aperture connect lever
Cut groove for
aperture connect lever
aperture connect lever
Four screws inserted
in the screw hole
in the screw hole
Back Adjustment
Washer
Washer
5 Group Ball
Frame Block
Frame Block
5 Group Ball
Frame Block
Frame Block
Lean the outer tube block
and insert the back adjustment washer
as shown in the figure.
and insert the back adjustment washer
as shown in the figure.
Rotate clockwise to eliminate a play and
tighten four screws.
tighten four screws.
Mount
Pin of aperture
operation plate
unit
operation plate
unit
Installation screw hole
of outer tube block
of outer tube block
Spring Protection
Sheet
Sheet
G19 Holder
Ring
Ring
HELP13
Adhesive bond (B-10): J-6082-612-A
1. Overlay the aperture blade unit clockwise.
2. Open the aperture operate plate unit and install the aperture hold ring so that the aperture blade unit protrudes a little from the hole.
3. Install nine screws tentatively.
2. Open the aperture operate plate unit and install the aperture hold ring so that the aperture blade unit protrudes a little from the hole.
3. Install nine screws tentatively.
Overlay the aperture
blade unit clockwise
blade unit clockwise
Install the aperture hold ring.
(The aperture blade unit
protrudes a little from the hole)
(The aperture blade unit
protrudes a little from the hole)
Set the aperture operate
plate unit to the open state
plate unit to the open state
Aperture Hold Ring
Screw
(9 pieces)
(9 pieces)
4. After
performing 5-2-2. Aperture Diameter Adjustment , tighten firmly nine screws and apply the adhesive bond (B-10) as shown
below.
5. Apply the adhesive bond (B-10) to the portion A (head of screw) at three locations (at an interval of every two screws).
6. Apply the adhesive bond (B-10) portion B (protruded portion at the tip of screw) (9 locations).
6. Apply the adhesive bond (B-10) portion B (protruded portion at the tip of screw) (9 locations).
Apply the adhesive bond (B-10)
Portion A (head of screw) (3 locations)
(at an interval of every two screws)
Portion A (head of screw) (3 locations)
(at an interval of every two screws)
Apply the adhesive bond (B-10)
Portion B (protruded at the tip of screw)
(9 locations)
Portion B (protruded at the tip of screw)
(9 locations)
2-11
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP14
1. Install the aperture operate plate holder, facing the burr (by press) side to the 1st lens side.
2. Usually, use two pieces of aperture blade spacer B (t=0.3mm).
2. Usually, use two pieces of aperture blade spacer B (t=0.3mm).
Note:
Use two pieces of aperture blade spacer A (t=0.2mm) only when the defect occurs in the iris dynamic characteristics.
Aperture Operate Plate Holder
Use the
Aperture Blade Spacer A (t=0.2mm)
or
Aperture Blade Spacer B (t=0.3mm)
Aperture Blade Spacer A (t=0.2mm)
or
Aperture Blade Spacer B (t=0.3mm)
burr side
1st lens side
HELP15
1. Install the zoom rubber ring to the zoom operation ring.
2. Fold up the 1st lens side of zoom rubber ring.
3. Affix the SW flexible setting tape not to overlap on the brush cover and tapes.
4. Peel the protection sheet off the adhesive side of SW flexible setting tape and return the zoom rubber ring to the original position.
2. Fold up the 1st lens side of zoom rubber ring.
3. Affix the SW flexible setting tape not to overlap on the brush cover and tapes.
4. Peel the protection sheet off the adhesive side of SW flexible setting tape and return the zoom rubber ring to the original position.
Brush cover and tapes
Zoom Operation
Ring
Ring
SW flexible setting tape
(Affix it not to overlap on
the brush cover and tapes)
(Affix it not to overlap on
the brush cover and tapes)
Install the zoom rubber ring and
fold it up as shown in the figure
fold it up as shown in the figure
HELP16
1. Thread the projection of zoom operation ring through the hole of brush (zoom).
2. Set the zoom to the TELE end (200).
3. Adjust the position of brush (zoom) so that the curved portion (contact with the flexible board) of brush (zoom) comes to the circle
2. Set the zoom to the TELE end (200).
3. Adjust the position of brush (zoom) so that the curved portion (contact with the flexible board) of brush (zoom) comes to the circle
portion (Part R) of zoom encoder flexible.
Note:
Note:
In case of finished lens, perform 5-9-1. Zoom Brush Position Adjustment .
4. Cut a polyester tape (black) 10mm in the specified size and fix the brush (zoom) with the polyester tape (black) 10mm.
5. Set the brush cover to cover the polyester tape (black) 10mm fixing the brush (zoom).
6. Cut a polyester tape (black) 10mm in the specified size and affix the polyester tape (black) 10mm at right and left sides of brush cover
5. Set the brush cover to cover the polyester tape (black) 10mm fixing the brush (zoom).
6. Cut a polyester tape (black) 10mm in the specified size and affix the polyester tape (black) 10mm at right and left sides of brush cover
to fix it.
Set the TELE end (200)
Part R of brush (zoom)
Zoom Encoder Flexible
Zoom Operation Ring
Brush
(Zoom)
(Zoom)
Brush
(Zoom)
(Zoom)
Brush Cover
Brush Cover
Polyester Tape (Black)
10mm (10X40mm)
10mm (10X40mm)
Polyester Tape (Black)
10mm (10X40mm)
10mm (10X40mm)
Polyester Tape (Black)
10mm (10X40mm)
10mm (10X40mm)
Projection of
zoom operation ring
zoom operation ring
2-12
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP17
Anti-diffusion agent (A-20): J-6082-611-A
Adhesive bond (B-10): J-6082-612-A
Adhesive bond (B-40): J-6082-614-A
Adhesive bond (B-10): J-6082-612-A
Adhesive bond (B-40): J-6082-614-A
1. Apply the adhesive bond (B-40) to the tip of screw portion of zoom stopper pin.
2. Install two pieces of anti slip rubber.
3. Apply the anti-diffusion agent (A-20) to all circumferences of indicated portion of zoom connect plate.
4. Insert two pieces of zoom connect plate in the groove of 4th lens barrel and tighten firmly four screws.
2. Install two pieces of anti slip rubber.
3. Apply the anti-diffusion agent (A-20) to all circumferences of indicated portion of zoom connect plate.
4. Insert two pieces of zoom connect plate in the groove of 4th lens barrel and tighten firmly four screws.
Loosen the screws half turn.
5. After moving the zoom operation ring little by little, tighten firmly the screws.
Note:
Do not operate the zoom until the zoom stopper pin is installed.
6. Apply the adhesive bond (B-10) to the indicated portion of zoom connect plate.
After tightening four screws,
loose the screws half turn
loose the screws half turn
Zoom Connect Plate
Zoom Connect
Plate
Plate
Anti-Slip
Rubber
Rubber
Anti-Slip
Rubber
Rubber
Insert in the groove
of 4th lens barrel
of 4th lens barrel
Groove
of 4th lens barrel
of 4th lens barrel
Zoom Stopper Pin
Apply the adhesive bond (B-40)
Apply the adhesive bond (B-40)
Apply the
anti-diffusion
agent (A-20)
(All around)
anti-diffusion
agent (A-20)
(All around)
Apply the adhesive bond (B-10)
Zoom Connect Plate
Note:
Do not operate the zoom until
the zoom stopper pin is installed.
Do not operate the zoom until
the zoom stopper pin is installed.
HELP18
Anti-diffusion agent (A-20): J-6082-611-A
Grease (G-15): J-6082-619-A
Grease (G-85): J-6082-626-A
Grease (G-15): J-6082-619-A
Grease (G-85): J-6082-626-A
1. Apply the ant-diffusion agent (A-20) to the indicated portion of zoom operation ring.
2. Apply the grease (G-15) (G-85) to the indicated portion of zoom operation ring.
2. Apply the grease (G-15) (G-85) to the indicated portion of zoom operation ring.
Apply the
anti-diffusion
agent (A-20)
(All around)
anti-diffusion
agent (A-20)
(All around)
Apply the
anti-diffusion
agent (A-20)
(All around)
anti-diffusion
agent (A-20)
(All around)
Apply the
grease (G-85)
(All around)
grease (G-85)
(All around)
Area
(all around)
restricted to
apply the
anti-diffusion
agent (A-20)
(all around)
restricted to
apply the
anti-diffusion
agent (A-20)
Apply the
grease (G-15)
grease (G-15)
Inside
Outside
Inside
Outside
3mm
Cut
view
view
Zoom Operation
Ring
Ring
Surroundings of
brush hole
brush hole
Apply the anti-diffusion
agent (A-20)
agent (A-20)
Cut
view
view
3. Install the zoom operation ring to the mirror tube, aligning the brush hole of zoom operation ring with the red index of mirror tube and
aligning three projections of zoom operation ring with the grooves as shown in the figure below.
Projections
Projection
Projection
Projection
Brush
Hole
Hole
Zoom Operation
Ring
Ring
Insert 3 projections of zoom operation ring in the
grooves of front holding tube block at 3 locations
and rotate the zoom operation ring in the arrow
direction.
grooves of front holding tube block at 3 locations
and rotate the zoom operation ring in the arrow
direction.
Zoom Operation
Ring
Ring
Groove
Groove
Groove
Groove
Groove
Front Holding
Tube Block
Tube Block
Red index of
mirror tube
mirror tube
2-13
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP19
Anti-diffusion agent: (A-20): J-6082-611-A
1. Overlay the flexible PWB as shown in the figure below and fix them with the polyester tapes (black) 4mm cut in the specified size.
2. Apply the anti-diffusion agent (A-20) to the surrounding of tape.
2. Apply the anti-diffusion agent (A-20) to the surrounding of tape.
Flexible PWB of MR Sensor Block
Flexible PWB of Stator
DV Encoder Flexible
PC Board
PC Board
DV Encoder Flexible
PC Board
PC Board
Zoom Encoder Flexible
Zoom Encoder Flexible
Polyester Tape (Black)
4mm (4X15mm)
4mm (4X15mm)
Apply the anti-diffusion
agent (A-20)
agent (A-20)
Front Holding Tube Block
Flexible PWB of
ultrasonic motor
(stator)
ultrasonic motor
(stator)
Flexible PWB of
MR sensor block
MR sensor block
MR Sensor Holding Plate
HELP20
Adhesive bond (B-10): J-6082-612-A
1. Fix the brush holder to the front holding tube block with two screws and washers tentatively.
Note:
Be careful not to bend the leads of brush.
2. Set the focus to the infinity end.
3. Adjust the brush holder so that the curved portion (contact with the flexible board) of A encoder brush comes to the circle portion (Part
3. Adjust the brush holder so that the curved portion (contact with the flexible board) of A encoder brush comes to the circle portion (Part
R) of DV encoder flexible PC board and tighten firmly two screws.
4. After performing the 5-7-1. Focus Brush (A Encoder Brush) Position Adjustment , apply the adhesive bond (B-10) to the head of screw
at two locations.
Brush Holder
DV Encoder Flexible
PC Board
PC Board
Part R of
A encoder brush
A encoder brush
A Encoder Brush
Brush Holder
Screws Several pieces of washer
(The number of washer used differs
depending on the result of adjustment.)
depending on the result of adjustment.)
A Encoder Brush
Set the focus to the infinity
end position
end position
Apply the
adhesive bond
(B-10)
adhesive bond
(B-10)
Click on the first or last page to see other SAL70200G2 service manuals if exist.