DOWNLOAD Sharp AR-C262M (serv.man3) Service Manual ↓ Size: 34.72 MB | Pages: 127 in PDF or view online for FREE

Model
AR-C262M (serv.man3)
Pages
127
Size
34.72 MB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / Service Manual
File
ar-c262m-sm3.pdf
Date

Sharp AR-C262M (serv.man3) Service Manual ▷ View online

AR-C262M  CONSUMABLE PARTS  4 - 1
[4] CONSUMABLE PARTS
1. Supply system table
A. European Subsidiary
2. Consumables (kit, unit)
*1: Replace at 100K or within 2 years
No.
Item
Model Name
Content
Life
Commonality with 
other host machines
Remarks
1
Toner Cartridge 
(Black)
AR-C26TBN
Toner Cartridge (Black) with IC Chip
 (Toner ; Net 525g)
x 1
16.7k
Common
(AR-C170)
(AR-C172)
* Life : A4 size
at Area 
Coverage 6%
2
Toner Cartridge 
(Cyan)
AR-C26TCE
Toner Cartridge (Cyan) with IC Chip
(Toner ; Net 315g)
x 1
11k
Common
(AR-C260)
(AR-C170)
(AR-C172)
* Life : A4 size
at Area 
Coverage 5%
3
Toner Cartridge 
(Magenta)
AR-C26TME Toner Cartridge (Magenta) with IC Chip
 (Toner ; Net 315g)
x 1
11k
Common
(AR-C260)
(AR-C170)
(AR-C172)
* Life : A4 size
at Area 
Coverage 5%
4
Toner Cartridge 
(Yellow)
AR-C26TYE
Toner Cartridge (Yellow) with IC Chip
 (Toner ; Net 315g)
x 1
11k
Common
(AR-C260)
(AR-C170)
(AR-C172)
* Life : A4 size
at Area 
Coverage 5%
5
Drum Cartridge
AR-C26DUN Drum Cartridge
(Drum/Unit Parts included)
x 1
50k
Common
(AR-C170)
(AR-C172)
Color identification seal (C/M/Y/Bk)
x 1 each
6
Drum
AR-C26DMN OPC Drum
x 1
50k
Common
(AR-C170)
(AR-C172)
7
Main Charger Kit
AR-C26MKE Charger Unit
x 1
50k
Common
(AR-C260)
(AR-C170)
(AR-C172)
Cleaning Blade
x 1
Toner Receiving Seal
x 1
Part name
Model name
Content
Life
1 Upper heat roller kit
AR-C26UH
Upper heat roller
x 1
100K *1
Heat roller 60T gear
x 1
Upper heat roller bearing
x 2
Thermistor
x 1
Upper heat roller stopper
x 2
2 Lower heat roller kit
AR-C26LH
Lower heat roller
x 1
100K *1
Lower heat roller bearing
x 2
Thermistor
x 1
Lower heat roller stopper
x 2
Fusing separation pawl lower
x 2
3 Transfer belt kit
AR-C26TT
Transfer belt
x 1
100K *1
4 Transfer roller kit
AR-C26TX
Transfer roller
x 4
100K
5 Transfer waste toner tank unit
AR-C26HB
Transfer waste toner tank unit
x 1
100K
6 Filter kit
AR-C26FL
Ozone filter A
x 1
50K
Ozone filter B
x 1
7 Saddle staple cartridge
AR-SC2
5 Fusing unit
AR-C26FU (230V heater lamp)
AR-C26FU1 (120V heater lamp)
AR-C26FU2 (100V heater lamp)
Fusing unit for servicing 
(including upper/lower heater lamps)
 *1
6 Transfer belt unit
AR-C26TU
Transfer unit for servicing
100K *1
AR-C262M  CONSUMABLE PARTS  4 - 2
3. Photoconductor, developer, toner
A. Lot number identification and the term of validity
(1) Photoconductor
The term of validity: 36 months from the production day (month).
(2) Photoconductor cartridge
The term of validity: 24 months from the production day (month).
(3) Toner cartridge
The term of validity: 24 months from the production day (month).
(1)
Figure
2 for this model
(2)
Alphabet
Indicates the model support code.
(3)
Figure
Indicates the end digit of the production year.
(4)
Figure or X, Y, Z
Indicates the production month. (X= October, Y= November, 
Z= December)
(5) (6) Figure
Indicates the production day.
(7)
Figure or X, Y, Z
Indicates the packing month. (X= October, Y= November, 
Z= December)  
(8) (9) Figure
Indicates the packing day.
(10)
Figure or alphabet
Indicates the production division.
(1)
Figure
Version No.
(2)
Figure
The end digit of the year.
(3)
Alphabet
Production code (B for SOCC)
(4)
Alphabet
Destination code
(5) (6) Figure
Production day
(7)
Figure or X, Y, Z
Indicates the production month. (X= October, Y= November, 
Z= December)
(1)
Alphabet or figure
Unit code
(2)
Alphabet
Destination code
(3)
Alphabet
Skating
(4)
Alphabet
Production site code
(5)
Figure
Serial number (5 digits)
(6)
Figure
Production year, month, day (6 digits)
(7)
Alphabet
Version No. (A ~ sequentially revised)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9) (10)
(1)    (2)    (3)    (4)    (5)    (6)    (7)
(1)
(4)
(5)
(6)
(7)
(2)
(3)
AR-C262M  UNPACKING AND INSTALLATION  5 - 1
[5] UNPACKING AND INSTALLATION
1. Installing (use) conditions
Before installing the machine, check that the following installing
(use) conditions are satisfied.
If the installing (use) conditions are not satisfied, the machine may
not display full performances, resulting in troubles. It may also
cause safety problems. Therefore, be sure to arrange the installing
(use) conditions before setting up the machine.
A. Bringing space
For installation of a large size machine, be sure to check that the
door size is great enough before bringing in.
B. Installing space
The following space must be provided around the machine in
order to assure machine performances and proper operations.
If any option is installed, provide the additional space for installing
it.
Especially the space at the rear of the machine must be provided
sufficiently. If not, the machine cannot exhibit functions against
heat and dust, causing some troubles.
C. Power source 
(Capacity, voltage, frequency, safety, plug)
If the power specifications are not satisfied, the machine cannot
exhibit full performances and may cause safety trouble. 
Strictly observe the following specifications.
(1) Power capacity
Check that the following power capacity is satisfied. If not, addi-
tionally provide a power source.
Current capacity
100V: 15A or more
(2) Power voltage
Measure the voltage during copying to check that the voltage is in
the range of the specified voltage ±10%.
If the voltage is outside the specified range, use thicker lead wires
to reduce impedance.
(An electrical work is required.)
Use of a step-up transformer is also available. In this case, the
capacity must be great enough for the max. power consumption of
the machine.
(3) Power frequency, waveform
The frequency must be within the range of the specified frequency
±2%. If power waveform is deformed, a trouble may occur.
(4) Safety
Be sure to properly ground the machine.
(5) Power plug
Check the form of the power plug. If the shape does not match, do
not use it.
D. Floor strength and level
This machine is considerably heavy and becomes heavier with an
option installed.
The floor must be strong enough for assuring safety.
If not, color shift or image distortion may occur.
E. Direct rays of the sun, dust, temperature, 
humidity, gasses, chemicals, vibration
(1) Temperature and humidity
This machine is designed to perform properly under the specified
temperature and humidity. If the temperature and humidity
exceeds the specified range, the machine may not operate prop-
erly and or cause equipment failure.
Especially when the humidity is too high, paper absorbs humidity
to cause a paper jam or dirty copy.
(Do not install the machine near a stove, a humidifier, or an air
conditioner.)
Do not install the machine near a heater, a cooler, or a humidifier.
Dew may be formed inside the machine to cause a trouble. Use
enough care for ventilation.
No.
Content
1
Bringing space
2
Installing space
3
Power source (Capacity, fluctuation, safety)
4
Floor strength
5
Direct rays of the sun, dust, temperature, humidity, gases, 
chemicals 
31.5"
(80cm)
23.6"
(60cm)
23.6"
(60cm)
11.8"
(30cm)
Humidity (RH)
80%
60%
20%
15˚C
30˚C
35˚C
Temperature
AR-C262M  UNPACKING AND INSTALLATION  5 - 2
(2) Dust
If dust enters the machine, it may cause dirty copy and a paper
jam, resulting in a shortened lifetime.
(3) Direct rays of the sun
If the machine is installed under the rays of the sun, the exterior of
the machine may be discolored and abnormal copies may be pro-
duced.
(4) Gases and chemicals
Do not install the machine at a place where there are gases and
chemicals. Especially be careful to avoid installation near a diazo-
type copier, which produces ammonium gas.
Copy quality may be adversely affected and a trouble may be
caused.
(5) Vibration
Avoid installation near a machine which produces vibrations.
If vibrations are applied to the copier machine, copy images may
be deflected and a trouble may be caused.
2. Transit and delivery
A. Implements, facility, and manpower
It is recommendable to use a forklift for bringing in the machine for
safety.
If no forklift is available, man-power of four persons is required.
The machine is considerably heavy, and requires safety precau-
tions for delivery and installation.
Transit of the machine must be made in packed condition to the
installing place.
B. Delivery
Remove the packing materials prior to installation in the ofice envi-
ronment.
3. Unpacking
A. Unpacking procedure
1) Remove the PP band.
2) Remove the top case.
3) Remove the internal packing pads and the items packed
together with the machine.
4) Remove the machine from the package.
No.
Content
Method
1
Implements, facility, 
and man power
Use a forklift. (If no forklift is available, 
manpower of four persons is required.)
2
Delivery
Transit must be made in packed 
condition.
Page of 127
Display

Click on the first or last page to see other AR-C262M (serv.man3) service manuals if exist.