DOWNLOAD Panasonic AG-DVC30P / AG-DVC30E / AG-DVC32EN / AG-DVC33MC / AG-MYA30G Service Manual ↓ Size: 25.19 MB | Pages: 127 in PDF or view online for FREE

Model
AG-DVC30P AG-DVC30E AG-DVC32EN AG-DVC33MC AG-MYA30G
Pages
127
Size
25.19 MB
Type
PDF
Document
Service Manual
Brand
Device
Provideo / DIGITAL VIDEO CAMERA RECORDER
File
ag-dvc30p-ag-dvc30e-ag-dvc32en-ag-dvc33mc-ag-mya30.pdf
Date

Panasonic AG-DVC30P / AG-DVC30E / AG-DVC32EN / AG-DVC33MC / AG-MYA30G Service Manual ▷ View online

DIS-13 
 
13. Removal of EVF Unit 
 
1.  Removal of MIC Case Unit. 
2.  Removal of Side Case R Unit. 
3.  Removal of TOP VF Unit. 
4.  Disconnect connector P1 on EVF CONNECT C.B.A. as shown in figure 13-1. 
5.  Unscrew the 4 screws (A) and remove the EVF Unit and EVF SLIDER Unit from EVF LCD HOLD Unit as 
shown in figure 13-2. 
6.  Unscrew the 3 screws (B) and remove the EVF SLIDE COVER as shown in figure 13-3. 
7.  Unscrew the 4 screws (C) and remove the EVF Unit from EVF SLIDER Unit as shown in figure 13-4. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 13-1 
P1 
TOP VF UNIT 
Figure 13-2 
SCREW (A) 
FPC 
EVF SLIDE UNIT 
EVF LCD HOLDER UNIT 
EVF UNIT 
Figure 13-3 
Lift up EVF 
  Slide to EVF 
EVF SLIDE COVER 
 SCREW (B) 
 SCREW (B) 
Figure 13-4 
EVF SLIDE UNIT 
SCREW (C) 
EVF UNIT   
FPC 
SCREW (C) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
MECHANICAL ADJUSTMENT 
CONTENTS 
1.  MECHANICAL ADJUSTMENT AND CONFIRMATION .......................................................... MECH-1 
1-1. Name of Tape Transportation......................................................................................... MECH-1 
1-2. Tape Path Adjustment Procedure................................................................................... MECH-1 
1-3. Adjustment of S1 & T2 Post............................................................................................ MECH-2 
1-4. Confirmation of EVR Tools ............................................................................................. MECH-2 
1-5. Connection of LISTA Adjustment System ...................................................................... MECH-3 
1-6. Boot up the LISTA Software ........................................................................................... MECH-6 
1-7. How to Enter the Alignment Tape Data .......................................................................... MECH-7 
1-8. LISTA Sensitivity Detection ............................................................................................ MECH-8 
1-9. LISTA Linearity Adjustment ............................................................................................ MECH-9 
1-10.Tape Path Confirmation................................................................................................. MECH-11 
1-11.Self-REC/PLAY Envelope Waveform Confirmation....................................................... MECH-11 
2.  MECHANICAL PARTS REPLACEMENT PROCEDURE ........................................................ MECH-12 
2-1. Cleaning Roller Unit ........................................................................................................ MECH-12 
MECH-1 
1. MECHANICAL ADJUSTMENT AND CONFIRMATION 
 
1-1. Name of Tape Transportation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1-2. Tape Path Adjustment Procedure 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
T2 Post 
T1 Post 
T3 Post 
Capstan Shaft 
Pinch Roller 
S1 Post 
Tension Post 
S2 Post
Cylinder 
LOADING condition 
LISTA Sensitivity Detection 
LISTA Linearity Adjustment 
START 
END 
Confirmation of Tape Path 
Self-REC/PLAY ENV Confirmation 
LISTA Connection & Boot Up 
MECH-2 
 
1-3. Adjustment of S1 & T2 Post 
 
LISTA linearity and Envelope waveform are adjusted by S1 and T2 post. When removing the Mech. Cover (R) and 
(L), which is shown in the following figure, without opening a cassette cover, it is possible to do an adjustment. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1-4. Connection of EVR Tools 
 
To performing the confirmation of envelope (item “1-11. Self-REC/PLAY Envelope Confirmation”), the following 
tools are required. 
NAME Part 
Number 
Pcs. Remark 
Measuring Board 
VFK1308P 
 
EVR Connector Board 
VFK1309A 
NOTE:
 VFK1309 also can be use 
Connection Adapter 
VFK1763 
60 to 30pin 
30pin Flat Cable 
VFK1317 
 
DC Cable 
VJA1128 or LSJA0310 
For Unit 
DC Cable 
VJA0941 
For Measuring Board 
AC Adapter 
----- 
 
 
To confirm the envelope output, connect the Connection and Measuring Boards as described below. 
1.  Unscrew 2 screws and remove the EVR cover. 
 
 
 
 
 
 
 
 
 
 
 
2.  Connect the 2 pcs. of 30 pin flat cables (VFK1317) between P101/P102 on the Measuring Board (VFK1308P), 
and 2 connectors on the EVR Connector Board (VFK1309A). Make sure that the contact surface of 2 pcs. of 30 
pin Flat Cables are inner side and direction of the EVR Connector Board is as shown in Figure. Then connect 
the Connection Adapter (VFK1763). 
 
 
 
 
 
 
 
 
 
 
 
 
Mech. Cover (R) 
  Mech. Cover (R) side: S1 Post 
  Mech. Cover (L) side: T2 Post 
Mech. Cover (L) 
EVR Cover 
SCREW 
Connect VFK1763 with VFK1309A as 
shown in picture. 
The unit will not work if the connector 
is attached backwards. 
VFK1763 
VFK1309A 
Part side
30 pin Flat Cable 
VFK1308P 
Connect the 
VFK1763 
Page of 127
Display

Click on the first or last page to see other AG-DVC30P / AG-DVC30E / AG-DVC32EN / AG-DVC33MC / AG-MYA30G service manuals if exist.