Panasonic UE-608030 / UE-608031 / UE-608032 Service Manual ▷ View online
29
2. Mount the elite Panaboard on the up/down unit.
• Attach the board brackets (7) to the left and right board
attachments on the rear side of the elite Panaboard using
screws (6) for securing each board bracket.
• Attach the lower-left bracket to the left side (outer side) of the
left board attachment. Similarly, attach the lower-right bracket
to the left side (inner side) of the right board attachment.
attachments on the rear side of the elite Panaboard using
screws (6) for securing each board bracket.
• Attach the lower-left bracket to the left side (outer side) of the
left board attachment. Similarly, attach the lower-right bracket
to the left side (inner side) of the right board attachment.
• With the help of another individual, take hold of the elite
Panaboard, align it so that the board bottom bracket and the part
for securing the elite Panaboard wall amount are aligned, and
suspend the elite Panaboard at that position.
Panaboard, align it so that the board bottom bracket and the part
for securing the elite Panaboard wall amount are aligned, and
suspend the elite Panaboard at that position.
Note:
Even when the elite Panaboard has been placed on the Up/
Down Unit, it has still not been secured in place. If any attempt
is made to lift the elite Panaboard in this state, it may become
disengaged from the up/down unit so do not lift it until it has
been secured loosely.
Down Unit, it has still not been secured in place. If any attempt
is made to lift the elite Panaboard in this state, it may become
disengaged from the up/down unit so do not lift it until it has
been secured loosely.
30
3. Loosely secure the elite Panaboard to the Up/ Down Unit.
• Remove the Lower Frame Cover centered at the bottom of the
elite Panaboard. Align the wall mount holes on the bottom of the
board attachments with the left and right positions of the board
bottom bracket (loosely secured to the Up/Down Unit) and
loosely secure them using the board mounting screws
(5, one on each side).
• Depending on the model of elite Panaboard, the lower frame
cover is removed differently and screws are in different
positions. Refer to the Operating Instructions of the relevant elite
Panaboard.
elite Panaboard. Align the wall mount holes on the bottom of the
board attachments with the left and right positions of the board
bottom bracket (loosely secured to the Up/Down Unit) and
loosely secure them using the board mounting screws
(5, one on each side).
• Depending on the model of elite Panaboard, the lower frame
cover is removed differently and screws are in different
positions. Refer to the Operating Instructions of the relevant elite
Panaboard.
4. After removing the up/down locking plates attached to both
sides of the Up/Down Unit, secure the elite Panaboard at the
highest position.
• The up/down locking plates are secured using screws. When
removing them, remove the screws. After mounting the plates
the other way round, tighten the screws again to secure them.
• Lift the elite Panaboard to the highest point and secure it with
the brake
Note:
sides of the Up/Down Unit, secure the elite Panaboard at the
highest position.
• The up/down locking plates are secured using screws. When
removing them, remove the screws. After mounting the plates
the other way round, tighten the screws again to secure them.
• Lift the elite Panaboard to the highest point and secure it with
the brake
Note:
1. At this stage, compensation for board weight is not possible,
and if a UB-T880W is mounted, it will gradually shift
downward from the highest point. Also be aware that if a
and if a UB-T880W is mounted, it will gradually shift
downward from the highest point. Also be aware that if a
UB-T780, UB-T781, or UB-T780BP is mounted, it will
gradually shift upward.
2. When disposing of the system, be aware that the Up/Down
Unit may spring up when the elite Panaboard is removed
from the up/down unit.
3. At the time of shipment, the position was set for the
UB-T880. When using a model other than the UB-T880,
adjust the position of the Up/Down Unit by taking the
following steps.
4. UB-T880: Refer to "4.8 Mounting the elite Panaboard".
2. When disposing of the system, be aware that the Up/Down
Unit may spring up when the elite Panaboard is removed
from the up/down unit.
3. At the time of shipment, the position was set for the
UB-T880. When using a model other than the UB-T880,
adjust the position of the Up/Down Unit by taking the
following steps.
4. UB-T880: Refer to "4.8 Mounting the elite Panaboard".
5. Remove the loosely secured board mounting screws (5) and
temporarily take the elite Panaboard off of the Up/Down Unit.
temporarily take the elite Panaboard off of the Up/Down Unit.
31
6. Confirm that the M6 189 bolt and nuts A and B are in the correct
positions. (The direction of rotation in instructions is relative to
the part being adjusted as viewed from above.)
7. Holding nut B in place with a 10 mm (13/32 in.) wrench, use
another wrench to loosen nut A (counterclockwise), and then
move the nut about 1 mm (1/16 in.) (1).
another wrench to loosen nut A (counterclockwise), and then
move the nut about 1 mm (1/16 in.) (1).
8. Holding nut B in place with a 10 mm (13/32 in.) wrench, use
another wrench to turn the M6 189 screw clockwise, and then
move nut B about 1 mm (1/16 in.) (2).
another wrench to turn the M6 189 screw clockwise, and then
move nut B about 1 mm (1/16 in.) (2).
32
9. Holding nut B in place with a 10 mm (13/32 in.) wrench, use
another wrench to turn nut A clockwise, and then tighten nuts A
and B (3).
another wrench to turn nut A clockwise, and then tighten nuts A
and B (3).
10. Turn the head of the M6 189 screw with a 10 mm (13/32 in.)
wrench (ratchet type) and reposition the hold tube assembly
to the adjustment position for the model to be mounted (4).
(Example: When mounting a UB-T880W, turn the M6 189
screw clockwise with a 10 mm [13/32 in.] wrench [ratchet type]
and reposition the assembly from adjustment position 7
wrench (ratchet type) and reposition the hold tube assembly
to the adjustment position for the model to be mounted (4).
(Example: When mounting a UB-T880W, turn the M6 189
screw clockwise with a 10 mm [13/32 in.] wrench [ratchet type]
and reposition the assembly from adjustment position 7
[as shipped] to adjustment position 9.)
Note:
1. When the hold tube assembly is moved toward the "+" side
of the arm 450, the load which can be supported by the arm
assembly is increased. (When the UB-T880W is installed)
of the arm 450, the load which can be supported by the arm
assembly is increased. (When the UB-T880W is installed)
2. Conversely, when the hold tube assembly is moved toward
the "-" side of the arm 450, the load which can be supported
by the arm assembly is reduced.
the "-" side of the arm 450, the load which can be supported
by the arm assembly is reduced.
(When the UB-T781, UB-T781W, UB-T780 or UB-T780BP
is installed)
11. Holding nut B in place with a 10 mm (13/32 in.) wrench, use
another wrench to loosen nut A (counterclockwise, 5).
another wrench to loosen nut A (counterclockwise, 5).
Click on the first or last page to see other UE-608030 / UE-608031 / UE-608032 service manuals if exist.