Sharp MX-M363N / MX-M363U / MX-M503N / MX-M503U (serv.man18) Service Manual ▷ View online
MX-M503N MX-PNX5A/B/C/D 8 – 4
[For DSPF/RSPF]
E. Turn on the power of the main unit
1)
Connect the connector.
2)
Insert the power plug of the main unit into the power outlet.
3)
Open the front cabinet.
Turn ON the power switch in the front cabinet of the main unit.
Turn ON the power switch in the front cabinet of the main unit.
4)
Turn ON the power switch on the operation panel.
1mm
1mm
1mm
1mm
DSPF
RSPF
ON
MX-M503N MX-FN11 9 – 1
MX-M503N
Service Manual
[9] MX-FN11
1. Unpacking
A. Removal of the finisher
* For removal of the finisher, manpower of two persons or more is
required.
1)
Remove the fixing material, and remove the top case.
2)
Remove the bundled items from packing cushion.
3)
Holding the upper part of the saddle stitch finisher by two peo-
ple, pull up the saddle stitch finisher, and make it stand upright.
(Be careful to sliding worker's foot.)
ple, pull up the saddle stitch finisher, and make it stand upright.
(Be careful to sliding worker's foot.)
4)
Remove the skid and packing cushions.
5)
One person tilt the finisher, another person remove the lower
tray.
tray.
6)
Remove the other side similarly.
MX-M503N MX-FN11 9 – 2
B. Removal of the protection material
1)
Remove the fixing tapes and protection material.
2)
Open the front upper door, and remove the fixing tapes and
protection material.
protection material.
3)
Remove the screws and remove the fixing material for the
paper exit tray. (four positions)
paper exit tray. (four positions)
C. Check the packed items
1)
Check that all the items are included in the package.
* The punch position labels (No.11 and No.12) should be kept at
hand since they will be necessary when installing the punch unit.
No.
Names of bundles
Quantity
1
Binding head round tapping M4x8
2
2
IT tapping M4x20
2
3
Binding head M4x12
4
4
Step screw B
2
5
Rail
1
6
Rail reception sheet metal
1
7
Connection fixture F (for x3)
1
8
Connection fixture R (for x3)
1
9
Staple position label (For scanner)
1
10
Staple position label (For RSPF/DSPF)
1
11
Punch position label (For scanner)
1
12
Punch position label (For RSPF/DSPF)
1
13
Guide mylar
2
14
Cushion (S)
1
15
Cushion (M)
1
16
Cushion (L)
1
1
2
3
6
4
5
7
8
9
11
12
10
14
13
16
15
X3
X3
MX-M503N MX-FN11 9 – 3
2. Installation
<Note before installation>
* Installing the MX-FN11 requires that the option desk (MX-DEX8/
* Installing the MX-FN11 requires that the option desk (MX-DEX8/
DEX9) and junction unit (MX-RBX3) be installed in advance. Be
sure to complete the installation of the option desk (MX-DEX8/
DEX9) and junction unit (MX-RBX3) before installing the finisher.
sure to complete the installation of the option desk (MX-DEX8/
DEX9) and junction unit (MX-RBX3) before installing the finisher.
* When the MX-FN11 and MX-PNX6A/B/C/D is installed at the
same time, first install the MX-PNX6A/B/C/D, and then install the
MX-FN11.
MX-FN11.
A. Replacement of the Operation Manual storage
cover
1)
Remove the Operation Manual storage cover on the left side of
the machine.
the machine.
2)
Install the Operation Manual storage cover (which was
removed from the machine) to the finisher.
removed from the machine) to the finisher.
B. Installation of the rail
1)
Install the rail (Package part No. 5) to the finisher with the fix-
ing screws (Package part No. 1).
ing screws (Package part No. 1).
2)
Install the rail reception sheet metal (Package part No. 6) to
the main unit with the fixing screws (Package part No. 2).
the main unit with the fixing screws (Package part No. 2).
C. Removal of the paper pass latch reception
parts and the positioning pin
1)
Remove the screw, and release the paper pass disconnection
preventing lever.
preventing lever.
2)
Remove the paper pass unit.
3)
Remove the resin E-ring that secures the reverse tray.
2
2
1
Click on the first or last page to see other MX-M363N / MX-M363U / MX-M503N / MX-M503U (serv.man18) service manuals if exist.