Panasonic CF-T5LWETZBM Service Manual ▷ View online
53
9.3.3.9. Assembly of the W-LAN Sheet
SW Cable Sheet
Vertical direction
< preparation of W-LAN Sheet >
W-LAN Sheet
W-LAN Sheet
Sheet is lightly held by the finger and the fold
habit is applied.
habit is applied.
Chip bottom match on Board
Horizontal direction
Silk line match on Board
Silk line match on Board
Runs side
by side.
by side.
The cutting lack part is
inserted, and puts into
the state of the roll.
inserted, and puts into
the state of the roll.
W-LAN Sheet is the sheet
metal externals and a
difference match.
metal externals and a
difference match.
The both sides tape flaking off
paper is peeled off and affixes.
paper is peeled off and affixes.
Horizontal direction is a
suiting seat copper part
externals 0-1mm.
suiting seat copper part
externals 0-1mm.
Silk is made a sign and affixes
CPU Cushion
HDD FPC
Bend completion chart
Mountain case
Mountain
case
case
Valley case
Valley case
Bends in the line of T mark.
9.3.3.10. Assembly of the HDD FPC
54
Execute after setting the substrate in the receiving treatment device when working.
HDD FPC
PET Tape
Watching confirmation of insertion in silk line
(Attention)
Affixation load of affixation thing not instructed : More than 1kgf/c
Bend completion chart
Valley case from white solid
line on the back
line on the back
Mountain case 35mm
Valley case 45mm
Valley case 23mm
Mountain case 6mm
The white line is in respect
The white line is in respect
Use the too
Use the too
55
9.3.3.12. Setting the Main Board
Insert HDD FPC in the opening
of the bottom case while bent.
No damage on the edge side
to FPC.
of the bottom case while bent.
No damage on the edge side
to FPC.
Main Board
Running aground of shutter to bottom
Confirm, and install the turning off position
(left side) Main Board’s W-LAN SW.
(left side) Main Board’s W-LAN SW.
It is confirmed that the SW lever has been
surely inserted in the ditch of the knob.
surely inserted in the ditch of the knob.
B
A
(5)
(5)
Bends in the vicinity of the tube root.
Bends in the vicinity of the
connector root.
connector root.
Do not give the terminal the load
while working.
while working.
Ferrite Sheet
DC-IN Cable
Safety work
It is confirmed to move right
and left after wrapping.
and left after wrapping.
9.3.3.11. Assembly of the DC-IN Cable
56
9.3.4. Assembly knowhow of the Top Case
9.3.4.1. Assembly of the Speaker
Affixation of Speaker Ring
Affix and kick according to the shape of the rib.
Note not running aground in the rib.
Note not running aground in the rib.
Speaker Cable
Speaker
Soldering
Soldering
Soldering
Solder must not overflow
Board externals.
Board externals.
Solder must not overflow Board externals.
Black line
Red line
Soldering of Speaker Cable
Speaker Ring
Processing of Speaker Cable
Speaker installation
Secure 2mm or more for the space in each rib and
the soldering part.
the soldering part.
Marking of the safety distance confirmation is put.
The people other than the speaker affixation worker
execute the safety distance.
The people other than the speaker affixation worker
execute the safety distance.
Inserts in the ditch
2mm or more
Rib
Rib
Rib
Rib
Rib
Rib
Marking
Processes to Hook
Processing below
Plinth outside suiting
Plinth outside suiting
Speaker Sheet
Processes
to the ditch
to the ditch
Safety work
Safety work
More than 2mm
Speaker Sheet
Processing below
Processes to Hook
< Speaker Cable processing >
Plinth outside suiting
Plinth outside suiting
Safety work
Processes to the ditch
9.3.4.2. Line processing Speaker Cable and putting Speaker Sheet
Click on the first or last page to see other CF-T5LWETZBM service manuals if exist.