Panasonic CF-T5LWETZBM Service Manual ▷ View online
49
9.3.3.4. Assembly of the PCMCIA Ejector
9.3.3.5. Assembly of the LAN Cable
(Attention)
Affixation load of affixation thing not instructed : More than 1kgf/c
< Explanation 1 >
The sheet metal bend part of Main Board
is inserted in the corner hole part.
The sheet metal bend part of Main Board
is inserted in the corner hole part.
(An opposite direction is also the same)
Refer to < Explanation 1 > for the installation.
< Attention >
Execute after setting the substrate in the receiving treatment
device when working.
Execute after setting the substrate in the receiving treatment
device when working.
The back of substrate
Main Board
Card Bus Ejector
Square hole
Bend
The lever is drawn to
the right before building in.
the right before building in.
The lever is drawn to the
left before building in.
Screw
Screw
DXQT2+G6FKL
DXQT2+G6FKL
Do not hang to the machine screw hole.
Edge measures Sheet
Touch the Connector root
Screw fixation of PCMCIA Ejector
Safety work
Affixes from the top and bottom in one tape
The tape must not hang to the ditch.
2 3mm
2 3mm
LAN Cable
PET Tape
Thing to cover part with cable
completely in the rough.
completely in the rough.
Safety Work
50
9.3.3.6. Line processing LAN cable
(Safety work)
Affixation load of affixation thing not instructed : More than 1kgf/c
Thing to process modem cable previously
Thing to process modem cable previously
1.The modem cable is
processed to the
bottom ditch part.
processed to the
bottom ditch part.
2.LAN cable afterwards
is processed up
is processed up
Lithium Battery
Connect the Conector
Connect the Conector
LAN Cable
51
Spreads on the terminal BATT
(It is one blowing to the range)
(It is one blowing to the range)
W-LAN
MODULE
MODULE
<
Attention
>
Execute after setting the substrate in the receiving
treatment device when working.
treatment device when working.
(Attention)
Affixation load of affixation thing not instructed : More than 1kgf/c
Screw
DXQT2+D25FNL
DXQT2+D25FNL
Execute after setting the substrate in the receiving treatment device when working.
(Attention)
MEMORY HEAT Sheet and B/C Label Affixation load : More than
Seat edge match
From the terminal root
B/C Label
MEMORY HEAT Sheet
9.3.3.7. Assembly of the W-LAN Module / Putting Memory Sheet
52
9.3.3.8. Putting Sheets
(Attention)
Affixation load of affixation thing not instructed : More than
Connector externals application
Management size : 0-1m
Management size : 0-1m
Connector externals application
Management size : 0-1mm
Grease(G-751)
Pressurize
More than 1-1.5
More than 1-1.5
Execute after setting the substrate in the receiving treatment
device when working.
device when working.
Connection
Heat Spreader Bottom
Connector direction
change
change
3mm
3mm
5mm
From the coil
externals
externals
1mm
PET Tape
PET Tape
Processes in the dotted line
SW Cable Sheet
Between cushion and addable
memory Processing
memory Processing
Processes between the
connector and the coil
connector and the coil
Between cushion and coil
Processing
Processing
HEAT SHEET Cushion
The HEAT cushion is affixed in the place without the chip wireless LAN
connector sideward.
Do not run aground in the chip on side.
It is unquestionable for the inclination as long as does not run aground.
connector sideward.
Do not run aground in the chip on side.
It is unquestionable for the inclination as long as does not run aground.
Click on the first or last page to see other CF-T5LWETZBM service manuals if exist.