DOWNLOAD Panasonic WH-SDC03H3E5-1 / WH-SDC05H3E5-1 / WH-SDC07H3E5-1 / WH-SDC09H3E5-1 / WH-UD03HE5-1 / WH-UD05HE5-1 / WH-UD07HE5-1 / WH-UD09HE5-1 Service Manual ↓ Size: 17.29 MB | Pages: 127 in PDF or view online for FREE

Model
WH-SDC03H3E5-1 WH-SDC05H3E5-1 WH-SDC07H3E5-1 WH-SDC09H3E5-1 WH-UD03HE5-1 WH-UD05HE5-1 WH-UD07HE5-1 WH-UD09HE5-1
Pages
127
Size
17.29 MB
Type
PDF
Document
Simplified Service Manual
Brand
Device
Air Conditioner / AIR-TO-WATER HEATPUMP
File
wh-sdc03h3e5-1-wh-sdc05h3e5-1-wh-sdc07h3e5-1-wh-sd.pdf
Date

Panasonic WH-SDC03H3E5-1 / WH-SDC05H3E5-1 / WH-SDC07H3E5-1 / WH-SDC09H3E5-1 / WH-UD03HE5-1 / WH-UD05HE5-1 / WH-UD07HE5-1 / WH-UD09HE5-1 Simplified Service Manual ▷ View online

93 
11.4.2  Install The Outdoor Unit 
11.4.2.1 Installation 
Diagram 
  It is advisable to avoid more than 2 blockage directions. For better ventilation & multiple-outdoor installation, 
please consult authorized dealer/specialist. 
  This illustration is for explanation purposes only. 
 
10
0m
m
or
 m
or
e
100
mm
or m
ore
10
00
m
m
or
 m
or
e
300
mm
or m
ore
Vinyl tape (Wide)
Saddle
Indoor unit/Outdoor unit
connecting cable (4-CORE
WIRE/1.5 mm²)
Type designation 60245 IEC
57 or heavier cable
ø6.35 mm (1/4")
Liquid refrigerant piping
ø12.7 mm (1/2")
Gas refrigerant piping
Vinyl tape
(Wide)
Saddle
Indoor unit/Outdoor unit
connecting cable (4-CORE WIRE/
2.5 mm²)
Type designation 60245 IEC 57 or
heavier cable
ø15.88 mm (5/8")
Gas refrigerant piping
ø6.35 mm (1/4")
Liquid refrigerant piping
100
mm
or m
ore
10
00
m
m
or
 m
or
e
10
0m
m
or
 m
or
e
300
mm
or m
ore
[
]
Check that the
cables do not touch
the compressor, etc.
For UD07*E5* and UD09*E5*
For UD03*E5* and UD05*E5*
 
 
F
E
B
A
C
D
(Anchor pitch)
(A
n
chor
 pi
tc
h
)
 
 
Model A 
UD03*E5* and 
UD05*E5* 
540 160 20 330 430 46 
UD07*E5* and 
UD09*E5* 
620 140 15 355 450 44 
 
(Unit : mm)
  After selecting the best location, start installation according to Installation Diagram. 
1.  Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm). 
2.  When installing at roof, please consider strong wind and earthquake. Please fasten the installation stand firmly 
with bolt or nails. 
11.4.2.2  Disposal of Outdoor Unit Drain Water 
  When a Drain elbow is used, please ensure to follow below: 
the unit should be placed on a stand which is taller than 50 mm. 
cover the ø20 mm holes with Rubber cap 2 (refer to illustration below). 
use a tray (field supply) when necessary to dispose the outdoor unit drain water. 
  If the unit is used in an area where temperature falls below 0°C for 2 or 3 consecutive days, it is recommended 
not to use the Drain elbow and Rubber cap, for the drain water freezes and the fan will not rotate. 
 
UD07*E5* and UD09*E5*
Rubber cap
× 8
Drain elbow
UD03*E5* and UD05*E5*
Rubber cap
× 7
Drain elbow
 
 
 
 
 
 
 
 
94 
11.4.3  Connecting The Piping 
11.4.3.1  Connecting the Piping to 
Outdoor Unit 
Decide piping length and then cut by using pipe cutter. 
Remove burrs from cut edge. Make flare after 
inserting the flare nut (locate at valve) onto the copper 
pipe. Align center of piping to valves and then tighten 
with torque wrench to the specified torque as stated in 
the table. 
 
 
Model 
Piping size (Torque) 
Gas Liquid 
UD03*E5* and 
UD05*E5* 
ø12.7 mm (1/2") 
[55 N•m] 
ø6.35 mm (1/4") 
[18 N•m] 
UD07*E5* and 
UD09*E5* 
ø15.88 mm (5/8") 
[65 N•m] 
ø6.35 mm (1/4") 
[18 N•m] 
 
Torque
wrench
Spanner
or Wrench
 
 
Be sure to use two spanners to tighten. 
(If the nuts are overtightened, it may cause the flares 
to break or leak.) 
 
Close the tube joining area with putty heat insulator 
(local supply) without any gap as shown in below 
figure. (To prevent insects or small animal entering.) 
(For UD07*E5* and UD09*E5* only) 
 
Putty or Heat
insulator
(local supply)
 
 
CUTTING AND FLARING THE PIPING 
1.  Please cut using pipe cutter and then remove the burrs. 
2.  Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused. 
Turn the piping end down to avoid the metal powder entering the pipe. 
3.  Please make flare after inserting the flare nut onto the copper pipes. 
 
When properly flared, the internal
surface of the flare will evenly shine
and be of even thickness. Since the
flare part comes into contact with
the connections, carefully check
the flare finish.
Improper flaring
Inclined Surface
damaged
Cracked Uneven
thickness
1. To cut
2. To remove burrs
3. To flare
Bar
Red arrow mark
Handle
Core
Yoke
Clamp
handle
Bar 0 – 0.5 mm
Copper pipe
Reamer
Point
down
Pipe
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
95 
11.4.4  Evacuation Of The Equipment 
WHEN INSTALLING AN AIR-TO-WATER HEAT PUMP, BE SURE TO EVACUATE THE AIR INSIDE THE UNIT 
AND PIPES in the following procedure. 
 
Vacuum
pump
adaptor
Vacuum
pump
OPEN
CLOSE
Close
Gas side
Liquid side
Outdoor unit
Three-way valve
Two-way valve
Close
Indoor unit
 
 
1  Connect a charging hose with a push pin to the Low side of a charging set and the service port of the 3-way 
valve. 
 
Be sure to connect the end of the charging hose with the push pin to the service port. 
2  Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and 
vacuum pump adaptor. 
3  Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 
0 cmHg (0 MPa) to –76 cmHg (–0.1 MPa). Then evacuate the air approximately ten minutes. 
4  Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the 
gauge does not move after approximately five minutes. 
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE. 
5  Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve. 
6  Tighten the service port caps of the 3-way valve at a torque of 18 N•m with a torque wrench. 
7  Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN” 
using a hexagonal wrench (4 mm). 
8  Mount valve caps onto the 2-way valve and the 3-way valve. 
 
Be sure to check for gas leakage. 
 
CAUTION
If gauge needle does not move from 0 cmHg (0 MPa) to –76 cmHg (–0.1 MPa), in step 11.2.3 above take the following measure: 
  If the leak stops when the piping connections are tightened further, continue working from step 11.2.3. 
  If the leak does not stop when the connections are retightened, repair the location of leak. 
  Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause 
frostbite. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
96 
11.4.5  Connect The Cable To The Outdoor Unit 
(FOR DETAIL REFER TO WIRING DIAGRAM AT UNIT) 
1.  Remove the control board cover from the unit by loosening the screw. 
2.  Connecting cable between indoor unit and outdoor unit shall be approved polychloroprene sheathed flexible 
cable (see below table), type designation 60245 IEC 57 or heavier cable. 
 
Models 
Flexible cable specification 
UD03*E5* and UD05*E5* 
4 × (1.5 mm
2
UD07*E5* and UD09*E5* 
4 × (2.5 mm
2
 
Terminals on the indoor unit
1
2
3
1
2
3
Colour of wires
Terminals on the outdoor unit
 
 
1
2
3
Earth Wire
must be
longer than
others cables
for safety
reason.
Terminal
Board
Holder (Clamper)
 
 
WARNING 
 This equipment must be properly earthed. 
 
3.  Secure the cable onto the control board with the holder (clamper). 
4.  Attach the control board cover back to the original position with screw. 
 
WIRE STRIPPING AND CONNECTING REQUIREMENT 
 
Wire stripping
5 mm or more
(gap between wires)
No loose strand when insert
Indoor/outdoor
connecting terminal
board
10 
± 1
 m
m
ACCEPT
Conductor over
insert
Conductor not
fully insert
Conductor fully
insert
PROHIBITED
PROHIBITED
 
 
(For UD07*E5* and UD09*E5* only)
Select required direction and apply protective bushing provided in accessories to protect cables from sharp edges.
Once all wiring work has been completed, tie the cable and cord together with the binding strap so that they do not touch other parts such as the
compressor and bare copper pipes.
Outdoor Unit
Banding strap
Cord clamp
Terminal Board
Connecting cable
(refer below
diagram for its
guiding)
Selection
of direction
Protective
bushing
Apply cut
DETAIL OF CONNECTING CABLE GUIDING
 
11.4.6 Pipe 
Insulation 
1.  Please carry out insulation at pipe connection portion as mentioned in Indoor/Outdoor Unit Installation Diagram. 
Please wrap the insulated piping end to prevent water from going inside the piping. 
2.  If drain hose or connecting piping is in the room (where dew may form), please increase the insulation by using 
POLY-E FOAM with thickness 6 mm or above. 
 
 
 
 
 
Page of 127
Display

Click on the first or last page to see other WH-SDC03H3E5-1 / WH-SDC05H3E5-1 / WH-SDC07H3E5-1 / WH-SDC09H3E5-1 / WH-UD03HE5-1 / WH-UD05HE5-1 / WH-UD07HE5-1 / WH-UD09HE5-1 service manuals if exist.