JBL ON BEAT RUMBLE EMC - CB Certificate ▷ View online
Issue Date:
2013-01-09
Page 33 of 54
Report Reference #
E204594-A39-CB-1
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. : IEC60950_1B
This report issued under the responsibility of UL
telecommunication networks
a) EUT with earthed telecommunication
ports ......................................................... :
ports ......................................................... :
N/A
b) EUT whose telecommunication ports have no
reference to protective earth
reference to protective earth
N/A
5.2
Electric strength
N/A
5.2.1
General
N/A
5.2.2
Test procedure
N/A
5.3
Abnormal operating and fault conditions
Pass
5.3.1
Protection against overload and abnormal
operation
operation
N/A
5.3.2
Motors
N/A
5.3.3
Transformers
N/A
5.3.4
Functional insulation ................................ :
Method c
Pass
5.3.5
Electromechanical components
N/A
5.3.6
Audio amplifiers in ITE ............................. :
See table 5.3
Pass
5.3.7
Simulation of faults
N/A
5.3.8
Unattended equipment
N/A
5.3.9
Compliance criteria for abnormal operating and
fault conditions
fault conditions
Pass
5.3.9.1
During the tests
No fire, emission of molten
metal or deformation was
noted during the tests.
metal or deformation was
noted during the tests.
Pass
5.3.9.2
After the tests
N/A
Issue Date:
2013-01-09
Page 34 of 54
Report Reference #
E204594-A39-CB-1
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. : IEC60950_1B
This report issued under the responsibility of UL
6
CONNECTION TO TELECOMMUNICATION NETWORKS
N/A
6.1
Protection of telecommunication network service persons, and users of other
equipment connected to the network, from hazards in the equipment
equipment connected to the network, from hazards in the equipment
N/A
6.1.1
Protection from hazardous voltages
N/A
6.1.2
Separation of the telecommunication network from earth
N/A
6.1.2.1
Requirements
N/A
Supply voltage (V) .................................... :
-
Current in the test circuit (mA) .................. :
-
6.1.2.2
Exclusions ................................................ :
N/A
6.2
Protection of equipment users from overvoltages on telecommunication
networks
networks
N/A
6.2.1
Separation requirements
N/A
6.2.2
Electric strength test procedure
N/A
6.2.2.1
Impulse test
N/A
6.2.2.2
Steady-state test
N/A
6.2.2.3
Compliance criteria
N/A
6.3
Protection of the telecommunication wiring system from overheating
N/A
Max. output current (A)............................. :
-
Current limiting method ............................ :
-
Issue Date:
2013-01-09
Page 35 of 54
Report Reference #
E204594-A39-CB-1
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. : IEC60950_1B
This report issued under the responsibility of UL
7
CONNECTION TO CABLE DISTRIBUTION SYSTEMS
N/A
7.1
General
N/A
7.2
Protection of cable distribution system service
persons, and users of other equipment connected
to the system, from hazardous voltages in the
equipment
persons, and users of other equipment connected
to the system, from hazardous voltages in the
equipment
N/A
7.3
Protection of equipment users from overvoltages
on the cable distribution system
on the cable distribution system
N/A
7.4
Insulation between primary circuits and cable
distribution systems
distribution systems
N/A
7.4.1
General
N/A
7.4.2
Voltage surge test
N/A
7.4.3
Impulse test
N/A
Issue Date:
2013-01-09
Page 36 of 54
Report Reference #
E204594-A39-CB-1
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. : IEC60950_1B
This report issued under the responsibility of UL
A
ANNEX A, TESTS FOR RESISTANCE TO HEAT AND FIRE
N/A
A.1
Flammability test for fire enclosures of movable equipment having a total mass
exceeding 18 kg, and of stationary equipment (see 4.7.3.2)
exceeding 18 kg, and of stationary equipment (see 4.7.3.2)
N/A
A.1.1
Samples ................................................... :
-
Wall thickness (mm) ................................. :
-
A.1.2
Conditioning of samples; temperature (°C)
................................................................. :
................................................................. :
N/A
A.1.3
Mounting of samples ................................ :
N/A
A.1.4
Test flame (see IEC 60695-11-3)
N/A
Flame A, B, C or D ................................... :
N/A
A.1.5
Test procedure
N/A
A.1.6
Compliance criteria
N/A
Sample 1 burning time (s) ........................ :
-
Sample 2 burning time (s) ........................ :
-
Sample 3 burning time (s) ........................ :
-
A.2
Flammability test for fire enclosures of movable equipment having a total mass not
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
N/A
A.2.1
Samples, material .................................... :
-
Wall thickness (mm) ................................. :
-
A.2.2
Conditioning of samples; temperature (°C)
................................................................. :
................................................................. :
N/A
A.2.3
Mounting of samples ................................ :
N/A
A.2.4
Test flame (see IEC 60695-11-4)
N/A
Flame A, B or C ........................................ :
-
A.2.5
Test procedure
N/A
A.2.6
Compliance criteria
N/A
Sample 1 burning time (s) ........................ :
-
Sample 2 burning time (s) ........................ :
-
Sample 3 burning time (s) ........................ :
-
A.2.7
Alternative test acc. to IEC 60695-11-5, cl. 5 and 9
N/A
Click on the first or last page to see other ON BEAT RUMBLE service manuals if exist.