JBL FLIP II (serv.man6) EMC - CB Certificate ▷ View online
Page 3 of 88 Report No. EFSN13070129E-1
TRF No. IEC60950_1C
List of Attachments (including a total number of pages in each attachment):
2. Australian/New Zealand differences (8 pages)
3. Korean differences (1page)
4. Canada differences (4 pages)
5. USA differences (4 pages)
6. Photos (7 pages)
Summary of testing:
From the result of our tests on the submitted samples, we conclude they comply with the requirements of
the standards
the standards
Tests performed (name of test and test clause):
Clause(s)
Test(s)
1.6
Input Current test
1.7
Durability of Marking testing
2.10
Clearances, creepage distances and
distances through insulation
distances through insulation
4.3.8
Battery test
4.5
Thermal requirements
5.3
Abnormal operating and fault
conditions
conditions
Testing location:
03A, F1.6, Tianfa Building, Tian'an Cyber Park,
Futian District, Shenzhen, Guangdong Province,
PRC
Futian District, Shenzhen, Guangdong Province,
PRC
Summary of compliance with National Differences
List of countries addressed:
2. Australia/New Zealand
3. Korea
4. Canada
5. USA
The product fulfils the requirements of IEC 60950-1:2005 (Second Edition) + Am 1:2009 and
EN 60950-1: 2006 + A11: 2009 +A1: 2010 +A12: 2011
Page 4 of 88 Report No. EFSN13070129E-1
TRF No. IEC60950_1C
Copy of marking plate
The artwork below may be only a draft. The use of certification marks on a product must be authorized by
the respective NCBs that own these marks.
the respective NCBs that own these marks.
(Additional requirements for markings. See 1.7 NOTE)
Label of adapter:
Label of speaker:
Page 5 of 88 Report No. EFSN13070129E-1
TRF No. IEC60950_1C
Page 6 of 88 Report No. EFSN13070129E-1
TRF No. IEC60950_1C
Test item particulars .................................................. :
Equipment mobility .................................................... : [] movable [] hand-held [X]transportable
[] stationary [] for building-in [] direct plug-in
Connection to the mains ............................................ : [] pluggable equipment [] type A [] type B
[] permanent connection
[] detachable power supply cord
[] non-detachable power supply cord
[X] not directly connected to the mains
[] detachable power supply cord
[] non-detachable power supply cord
[X] not directly connected to the mains
Operating condition ................................................... : [X] continuous
[] rated operating / resting time:
Access location ......................................................... : [X] operator accessible
[] restricted access location
Over voltage category (OVC) ................................... : [] OVC I [X] OVC II [] OVC III [] OVC IV
[] other:
Mains supply tolerance (%) or absolute mains supply
values ....................................................................... :
values ....................................................................... :
±10%
Tested for IT power systems .................................... : [] Yes [X] No
IT testing, phase-phase voltage (V) ......................... :
Class of equipment ................................................... : [] Class I [] Class II [X] Class III
[] Not classified
Considered current rating of protective device as
part of the building installation (A) ............................ :
part of the building installation (A) ............................ :
Pollution degree (PD) ............................................... : [] PD 1 [X] PD 2 [] PD 3
IP protection class .................................................... : IP X0
Altitude during operation (m) .................................... : Up to 2000m
Altitude of test laboratory (m) ................................... : Below 2000m
Mass of equipment (kg) ............................................ : Approx. 0.5Kg
Possible test case verdicts:
- test case does not apply to the test object................. : N/A
- test object does meet the requirement ...................... : P (Pass)
- test object does not meet the requirement ................ : F (Fail)
Testing .......................................................................... :
Date of receipt of test item ............................................ : 2013-07-01
Date(s) of performance of tests .................................... : 2013-07-01 to 2013-07-04
Click on the first or last page to see other FLIP II (serv.man6) service manuals if exist.