Harman Kardon DRIVE AND PLAY 2 (serv.man3) EMC - CB Certificate ▷ View online
Report No. 078214R-RFCEP02V01
Page : 21 of 48
Version:1.0
6.4. Test
Procedure
The EUT and its load are placed on a table that is 0.8 meter above a metal ground plane measured
1m*1m min. and 0.65mm thick min. And projected beyond the EUT by at least 0.1m on all sides. The
length of power cord between the coupling device and the EUT shall be 2m or less.
For Signal Ports and Telecommunication Ports
1m*1m min. and 0.65mm thick min. And projected beyond the EUT by at least 0.1m on all sides. The
length of power cord between the coupling device and the EUT shall be 2m or less.
For Signal Ports and Telecommunication Ports
The disturbance signal is through a coupling and decoupling networks (CDN) device couples to
the signal and Telecommunication lines of the EUT.
the signal and Telecommunication lines of the EUT.
For Input and Output AC Power or DC Input and DC Output Power Ports:
The EUT is connected to the power mains through a coupling device that directly couples the
Surge interference signal.
The surge noise shall be applied synchronized to the voltage phase at 0
Surge interference signal.
The surge noise shall be applied synchronized to the voltage phase at 0
0
, 90
0
, 180
0
, 270
0
and the
peak value of the a.c. voltage wave. (Positive and negative)
Each of Line-Earth and Line-Line is impressed with a sequence of five surge voltages with
interval of 1 min.
Each of Line-Earth and Line-Line is impressed with a sequence of five surge voltages with
interval of 1 min.
6.5. Test
Specification
According to EN 61000-4-5:1995+A1+ 2001
6.6. Uncertainty
±
7.93 %
6.7. Test
Result
The measurement of the Surge was investigated and test result was shown in section 12. The
acceptance criterion was met and the EUT passed the test.
acceptance criterion was met and the EUT passed the test.
Report No. 078214R-RFCEP02V01
Page : 22 of 48
Version:1.0
7.
Conducted Susceptibility (CS)
7.1. Test
Equipment
Item Equipment
Manufacturer
Model No. / Serial No.
Last Cal.
1
CS SYSTEM
SCHAFFNER
NSG 2070
March, 2007
2
CDN
SCHAFFNER
CDN M016S / 20822
Dec., 2006
3
CDN
SCHAFFNER
CDN M016S / 20823
Dec., 2006
4
FIXED PAD
SCHAFFNER
INA 2070-1 / 2115
N/A
5
EM Clamp
KEMZ 801 / 21024
Mar., 2007
6
No.2 EMC Fully Chamber
N/A
Note: All equipments are calibrated every one year.
7.2. Test
Setup
7.3. Test
Level
Item Environmental
Phenomena
Units
Test Specification Performance Criteria
AC Input and AC Output & DC Input and DC output Power Ports & Functional Earth Ports
Radio-Frequency
Common Mode.
Amplitude Modulated
MHz
V (rms, Unmodulated)
% AM (1kHz)
Source Impedance
Ω
0.15-80
3
80
150
A
Report No. 078214R-RFCEP02V01
Page : 23 of 48
Version:1.0
7.4. Test
Procedure
The EUT are placed on a table that is 0.8 meter height, and a Ground reference plane on the table,
EUT are placed upon table and use a 10cm insulation between the EUT and Ground reference
plane.
For Signal Ports and Telecommunication Ports
EUT are placed upon table and use a 10cm insulation between the EUT and Ground reference
plane.
For Signal Ports and Telecommunication Ports
The disturbance signal is through a coupling and decoupling networks (CDN) or EM-clamp
device couples to the signal and Telecommunication lines of the EUT.
device couples to the signal and Telecommunication lines of the EUT.
For Input DC and AC Power Ports
The EUT is connected to the power mains through a coupling and decoupling networks for power
supply lines. And directly couples the disturbances signal into EUT.
Used CDN-M2 for two wires or CDN-M3 for three wires.
supply lines. And directly couples the disturbances signal into EUT.
Used CDN-M2 for two wires or CDN-M3 for three wires.
All the scanning conditions are as follows:
Condition
of
Test
Remarks
1. Field Strength
6V
2. Radiated Signal
AM 80% Modulated with 1kHz sinusoidal audio signal
3. Scanning Frequency
0.15MHz – 80MHz
4 Dwell Time
3 Seconds
5. Frequency step size
∆ f
: 1%
6. The rate of Swept of Frequency
1.5 x 10
-3
decades/s
7.5. Test
Specification
According to EN 61000-4-6:1996 +A1: 2001
7.6. Uncertainty
±
6.17 %
7.7. Test
Result
The measurement of the Conducted Susceptibility was investigated and test result was shown in
section 12. The acceptance criterion was met and the EUT passed the test.
section 12. The acceptance criterion was met and the EUT passed the test.
Report No. 078214R-RFCEP02V01
Page : 24 of 48
Version:1.0
8.
EMC Reduction Method During Compliance Testing
No modification was made during testing.
Click on the first or last page to see other DRIVE AND PLAY 2 (serv.man3) service manuals if exist.