Harman Kardon ABH-4 (serv.man10) EMC - CB Certificate ▷ View online
page 28 of 42
Report No.SPCLVD31229
TRF No.: I950___D
TRF originator: FIMKO
A
ANNEX A, TESTS FOR RESISTANCE TO HEAT AND FIRE
N/A
A.1
Flammability test for fire enclosures of movable equipment having a total
mass exceeding 18 kg, and of stationary equipment (see 4.7.3.2)
mass exceeding 18 kg, and of stationary equipment (see 4.7.3.2)
N/A
A.1.1
Samples, material ............................................. :
Wall thickness (mm).......................................... :
A.1.2
Conditioning of samples; temperature (
°
C) ........ :
N/A
A.1.3
Mounting of samples ......................................... :
N/A
A.1.4
Test flame
N/A
A.1.5
Test procedure
N/A
A.1.6
Compliance criteria
N/A
Sample 1 burning time (s) ................................. :
Sample 2 burning time (s) ................................. :
Sample 3 burning time (s) ................................. :
A.2
Flammability test for fire enclosures of movable equipment having a total
mass not exceeding 18 kg, and for material and components located inside
fire enclosures (see 4.7.3.2 and 4.7.3.4)
mass not exceeding 18 kg, and for material and components located inside
fire enclosures (see 4.7.3.2 and 4.7.3.4)
N/A
A.2.1
Samples, material ............................................. :
Wall thickness (mm).......................................... :
A.2.6
Compliance criteria
N/A
Sample 1 burning time (s) ................................. :
Sample 2 burning time (s) ................................. :
Sample 3 burning time (s) ................................. :
A.2.7
Alternative test acc. to IEC 60695-2-2, cl. 4, 8
N/A
Sample 1 burning time (s) ................................. :
Sample 2 burning time (s) ................................. :
Sample 3 burning time (s) ................................. :
A.3
High current arcing ignition test (see 4.7.3.2)
N/A
A.3.1
Samples, material ............................................ :
Wall thickness (mm).......................................... :
A.3.5
Compliance criteria
N/A
Sample 1 number of arcs to ignition (pcs).......... :
Sample 2 number of arcs to ignition (pcs).......... :
Sample 3 number of arcs to ignition (pcs) ......... :
Sample 4 number of arcs to ignition (pcs) ......... :
Sample 5 number of arcs to ignition (pcs).......... :
A.4
Hot wire ignition test (see 4.7.3.2)
N/A
A.4.1
Samples, material ............................................. :
Wall thickness (mm).......................................... :
page 29 of 42
Report No.SPCLVD31229
TRF No.: I950___D
TRF originator: FIMKO
A.4.5
Compliance criteria
N/A
Sample 1 ignition time (s) .................................. :
Sample 2 ignition time (s) .................................. :
Sample 3 ignition time (s) .................................. :
Sample 4 ignition time (s) .................................. :
Sample 5 ignition time (s) .................................. :
A.5
Hot flaming oil test (see 4.6.2)
N/A
A.6
Flammability tests for classifying materials V-0, V-1 or V-2
N/A
A.6.1
Samples, material ............................................. :
Wall thickness (mm).......................................... :
A.6.5
Compliance criteria
N/A
A.6.6
Permitted re-test
N/A
A.7
Flammability test for classifying foamed materials HF-1, HF-2 or HFB
N/A
A.7.1
Sample, material ............................................... :
Wall thickness (mm).......................................... :
A.7.4
Compliance criteria
N/A
A.7.5
Compliance criteria, HF-2
N/A
A.7.6
Compliance criteria, HF-1
N/A
A.7.7
Compliance criteria, HBF
N/A
A.7.8
Permitted re-test, HF-1 or HF-2
N/A
A.7.9
Permitted re-test, HBF
N/A
A.8
Flammability test for classifying materials HB
N/A
A.8.1
Samples, material ............................................. :
Sample thickness (mm)..................................... :
A.8.2
Conditioning of samples; temperature (
°
C) ........ :
N/A
A.8.4
Test procedure
N/A
A.8.5
Compliance criteria
N/A
A.8.6
Permitted re-test
N/A
A.9
Flammability test for classifying materials 5V
N/A
A.9.1
Samples, material ............................................. :
Sample thickness (mm)..................................... :
A.9.4
Test procedure, test bars
N/A
A.9.5
Test procedure, test plaques
N/A
A.9.6
Compliance criteria
N/A
A.9.7
Permitted re-test
N/A
A.10
Stress relief conditioning (see 4.2.7)
N/A
Temperature (
°
C) .............................................. :
page 30 of 42
Report No.SPCLVD31229
TRF No.: I950___D
TRF originator: FIMKO
B
ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2
and 5.3.2)
and 5.3.2)
N/A
B.1
General requirements
N/A
Position ............................................................ :
Manufacturer .................................................... :
Type ................................................................ :
Rated values ................................................... :
B.2
Test conditions
N/A
B.3
Maximum temperatures
N/A
B.4
Running overload test
N/A
B.5
Locked-rotor overload test
N/A
Test duration (days) ......................................... :
Electric strength test: test voltage (V) ............... :
B.6
Running overload test for DC motors in
secondary circuits
secondary circuits
N/A
B.7
Locked-rotor overload test for DC motors in secondary circuits
N/A
B.7.1
Test procedure
N/A
B.7.2
Alternative test procedure; test time (h) .............. :
N/A
B.7.3
Electric strength test
N/A
B.8
Test for motors with capacitors
N/A
B.9
Test for three-phase motors
N/A
B.10
Test for series motors
N/A
Operating voltage (V) ....................................... :
page 31 of 42
Report No.SPCLVD31229
TRF No.: I950___D
TRF originator: FIMKO
C
ANNEX C, TRANSFORMERS (see 1.5.4 and 5.3.3)
Pass
Position ............................................................ : T1
Manufacturer .................................................... : Salom
Type ................................................................ : SPB-0667
Rated values ................................................... : Class B
Method of protection ......................................... : Inherent protection
C.1
Overload test
See enclosed Test record.
Pass
C.2
Insulation
See tabel 1.5.1
Pass
Protection from displacement of windings.......... : See tabel 1.5.1
Pass
G
ANNEX G, ALTERNATIVE METHOD FOR DETERMINING MINIMUM
CLEARANCES
CLEARANCES
N/A
G.1
Summary of the procedure for determining
minimum clearances
minimum clearances
N/A
G.2
Determination of mains transient voltage (V) :
N/A
G.3
Determination of telecommunication network
transient voltage (V)........................................:
transient voltage (V)........................................:
N/A
G.4
Determination of required withstand voltage
(V) ....................................................................:
(V) ....................................................................:
N/A
G.5
Measurement of transient levels (V)...............:
N/A
G.6
Determination of minimum clearances ..........:
N/A
H
ANNEX H, IONIZING RADIATION (see 4.3.13)
N/A
Ionizing radiation
N/A
Measured radiation (mR/h) ................................ :
Measured high-voltage (kV) ............................... :
Measured focus voltage (kV) ............................. :
CRT markings ................................................... :
Click on the first or last page to see other ABH-4 (serv.man10) service manuals if exist.