Sony KD-30XS955 Service Manual ▷ View online
18
KD-30XS955/34XBR960/34XS955/36XS955
KD-30XS955/34XBR960/34XS955/36XS955
Rev. 1
6/28/04
6/28/04
DY
Make sure Woofer Arm does NOT
touch the LCC Coil!!
Weight of Woofer & Woofer Arm can
damage LCC if the Arm Supporter is
touching the Coil!!
touch the LCC Coil!!
Weight of Woofer & Woofer Arm can
damage LCC if the Arm Supporter is
touching the Coil!!
CRT
LCC
LCC
LCC
CRT
LCC
Woofer Arm
Supporter
Supporter
Woofer Arm
Supporter
Supporter
SIDE VIEW
Woofer Arm
Woofer Arm
N.G.
Condition!
Condition!
O. K.
Condition!
Condition!
Touch!
N.G.
N.G.
!
WOOFER ARM WIRE DRESSING CAUTION (KD-34XBR960 ONLY)
Rev. 1
6/28/04
6/28/04
!
4-079-129-21
50 x 20mm Himelon Tape
(Align with edge of Pierce [D Cut-Out] on HS-BAND)
HS - BAND
FRONT PANEL
Bottom of
16X9 CRT
16X9 CRT
D Cut-Out
D Cut-Out
FRIT LINE
ALIGN TAPE WITH EDGE
OF D CUT-OUT
(TOLERANCE +- 5mm)
OF D CUT-OUT
(TOLERANCE +- 5mm)
ALIGN TAPE WITH EDGE
OF D CUT-OUT
(TOLERANCE +-5mm)
OF D CUT-OUT
(TOLERANCE +-5mm)
CRT PREP CAUTION POINT (KD-34XBR960 ONLY)
19
KD-30XS955/34XBR960/34XS955/36XS955
KD-30XS955/34XBR960/34XS955/36XS955
DGC ASSEMBLY CAUTION POINT (KD-34XBR960 ONLY)
DGC
DY
Rev. 1
6/28/04
6/28/04
CRT BRKT
34XBR p/n:4-093-523-xx
1-900-803-55
DGC Restraint Cable
1-900-803-55
DGC Restraint Cable
!
!
Wrap 2 TIMES (for 34W)
Wrap 4 TIMES (for 30W)
CHECK for NO SLACK ON
WIRE!
Wrap 4 TIMES (for 30W)
CHECK for NO SLACK ON
WIRE!
!
Caution:
Make sure
hook is
secure on CRT
pierce!
Make sure
hook is
secure on CRT
pierce!
!
Caution:
Make sure
hook is
secure on CRT
pierce!
Make sure
hook is
secure on CRT
pierce!
Caution:
Make sure
hook is
secure on CRT
pierce!
Make sure
hook is
secure on CRT
pierce!
!
!
Caution:
Make sure
hook is
secure on CRT
pierce!
Make sure
hook is
secure on CRT
pierce!
Wrap 2 TIMES (for 34W)
CHECK for NO SLACK ON
WIRE!
CHECK for NO SLACK ON
WIRE!
Caution:
Make sure Cable
Tie is TIGHTENED
once CRT is in
Vertical postion.
Make sure Cable
Tie is TIGHTENED
once CRT is in
Vertical postion.
Caution:
Make sure Cable
Tie is TIGHTENED
once CRT is in
Vertical postion.
Make sure Cable
Tie is TIGHTENED
once CRT is in
Vertical postion.
DY
Rotation
COIL
COIL
Rev. 1
6/28//04
6/28//04
CRT BRKT
WIRE HOOK
4-097-355-01
4-097-355-01
NOTE: Leads are
dressed inside
Rotation Coil.
dressed inside
Rotation Coil.
NOTE2: There are
2 Leads (TOTAL 4
Wires) to connect
to CX
2 Leads (TOTAL 4
Wires) to connect
to CX
ECG - P/N’s
1-900-808-04 - 34 W CRT
1-900-808-04 - 34 W CRT
SPRING
4-065-852-01
4-065-852-01
SPRING
4-065-852-01
4-065-852-01
EGC WIRE DRESSING (KD-34XBR960 ONLY)
20
KD-30XS955/34XBR960/34XS955/36XS955
KD-30XS955/34XBR960/34XS955/36XS955
CRT GROUND WIRE CAUTION POINT (KD-34XBR960 ONLY)
!
* Make sure DGC tension Cable (p/n:1-900-803-55)
does NOT cross over Tension Spring (p/n:4-065-852-01)!!
* Tension spring must NOT touch LCC Coils!
* CRT Ground Wire is CENTERED (as best as possible) upon
* CRT Ground Wire is CENTERED (as best as possible) upon
installation (so spring will not touch LCC Coil).
* DGC Tension Cable is CENTERED (as best as possible) upon
Installation (so that cable does not touch spring).
* DGC Tension Cable is CENTERED (as best as possible) upon
Installation (so that cable does not touch spring).
LCC Coil
LCC Coil
CRT Ground Wire
34XBR: 1-900-808-04
34XBR: 1-900-808-04
DGC Tension Cable
p/n: 1-900-803-55
2-Loops for 34XBR
p/n: 1-900-803-55
2-Loops for 34XBR
DGC
DGC
REV-1
6/28/04
6/28/04
OK INSTALLATION w/ Countermeasure
Himelon Tape
p/n: 4-079-129-21
Center Tape over the
END of the tension spring.
p/n: 4-079-129-21
Center Tape over the
END of the tension spring.
Himelon Tape
p/n: 4-079-129-21
Center Tape over the
END of the tension spring.
p/n: 4-079-129-21
Center Tape over the
END of the tension spring.
Rev.1
6/28/04
6/28/04
CRT BRKT X2
p/n: 4-093-523-XX (34XBR)
North-South Coil (N-S)
1-424-695-11 (34XBR)
1-424-695-11 (34XBR)
!
Make sure wires are routed
on the OUTSIDE of CRT
Support Bracket.
on the OUTSIDE of CRT
Support Bracket.
!
CAUTION:
Make sure direction of lead wires is
COUNTER-CLOCK-WISE!
Make sure direction of lead wires is
COUNTER-CLOCK-WISE!
DIRECTION OF LEAD WIRES
NOTE:
Thicker taping of N-S Coil
is clipped to Beznet Here.
Thicker taping of N-S Coil
is clipped to Beznet Here.
N-S COIL WIRE DRESSING CAUTION POINT (KD-34XBR960 ONLY)
21
KD-30XS955/34XBR960/34XS955/36XS955
KD-30XS955/34XBR960/34XS955/36XS955
g
p
Rev. 1
6/28/04
6/28/04
CRT
CLAMP
P/N: 4-857-472-01
4X16mm Screw
p/n: 7-685-663-99
TORQUE: 12kg-cm +-1
4X16mm Screw
p/n: 7-685-663-99
TORQUE: 12kg-cm +-1
HIMELON TAPE
P/N: 4-079-129-21
(2-PLACES)
(2-PLACES)
Make sure tweeter
terminals are facing
AWAY from CRT!
terminals are facing
AWAY from CRT!
+
CLAMP
P/N: 4-857-472-01
4X16mm Screw
p/n: 7-685-663-99
TORQUE: 12kg-cm +-1
4X16mm Screw
p/n: 7-685-663-99
TORQUE: 12kg-cm +-1
Hold Capacitor down with Himelon tape
(to prevent vibration and touching CRT
(to prevent vibration and touching CRT
Make sure Tweeter
leads do NOT touch
Beznet Rib (dashed
line)!!
Wires can Pinch when
Rear Cover is installed!
leads do NOT touch
Beznet Rib (dashed
line)!!
Wires can Pinch when
Rear Cover is installed!
!
SPEAKER ASSY. WIRE DRESSING - LEFT SPEAKERS (KD-34XBR960 ONLY)
Click on the first or last page to see other KD-30XS955 service manuals if exist.