DOWNLOAD Sony SAL55300 Service Manual ↓ Size: 4.42 MB | Pages: 49 in PDF or view online for FREE

Model
SAL55300
Pages
49
Size
4.42 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera
File
sal55300.pdf
Date

Sony SAL55300 Service Manual ▷ View online

4-13
SAL55300 (DT 4.5-5.6/55-300 SAM) (DT 55-300mm F4.5-5.6 SAM)
4-7.  INSTALLATION OF LENS ADJUSTMENT PROGRAM
4-7-1. Installing the Lens Adjustment Program (ActuatorCheckerSAM)
Equipment used
• Personal Computer
•  Lens Adjustment Program (ACSAM-S-VerX.XX.zip)
•  Finished Inspection JIG II (AC 100 - 240 V)
Note 1:
  Personal computer must have the condition that Windows Vista/7 runs normally and USB is connectable.
Note 2:
  Acquire the Lens Adjustment Program (ACSAM-S-VerX.XX.zip) from the each HQ.
1.  Saving Lens Adjustment Program (ACSAM-S-VerX.XX.zip)
1)  Unzip the Lens Adjustment Program (ACSAM-S-VerX.XX.zip)
2) Save ACSAM-S-VerX.XX.exe  in an arbitrary folder.
Note: 
The version of  ACSAM-S-VerX.XX.exe  might be updated.
4-7-2. Connection of Finished Inspection JIG II and Startup of Lens Adjustment Program (ActuatorCheck-
erSAM)
Note 1:
 Confirm that 4-7-1. Installing the Lens Adjustment Program (ActuatorCheckerSAM)  has been completed before this procedure is executed.
Note 2:
  In case of performing Finished inspection, be sure to perform in the condition that the lens is laid down (do not perform in the lens standing 
condition).
Equipment
• Personal Computer
•  Finished Inspection JIG II (AC 100 - 240 V)
Note:
  The cables and so on are not supplied as accessories.
•  AC Cable (Sold on the Market)
•  RS232C Cable (D-Sub 9 Pins (Male with Securing Screws), D-Sub 9 Pins (Female with Securing Screws)) Straight Type (Sold on the 
Market)
•  USB to Serial Cable (D-Sub 9 Pins (Male)) (Sold on the Market)
•  M-BOX-JIG (J-6082-722-A) (Or the Jig supplied with Finished Inspection JIG (J-6082-645-A))
•  Lens Adjustment Program (ACSAM-S-VerX.XX.zip)
1. Connection
 
Connect equipment and checking lens as shown in Fig. 4-7-1.
Note: 
ActuatorCheckerSAM  cannot start up without the connection to the finished inspection JIG II.
• Final
 
Finished Inspection JIG II
AC Cable
D-sub 9 Pins: Male
D-sub 9 Pins: Female
RS232C Cable
USB to Serial Cable
Lens
 Fig. 
4-7-1
2.  Startup of Lens Adjustment Program (ActuatorCheckerSAM)
1)  Turn on the personal computer and the finished inspection JIG II.
2) Start up ACSAM-S-VerX.XX.exe  from an arbitrary folder.
Note:
•  At the first time using, the followings appear on the screen (Fig. 4-7-2).
It is required to ask HQ about the password for the Com/User Characteristic Number and the manufacturer/type name of the personal 
computer.
Ex.  Com/User Characteristic Number :  iYdDZfq9q
 
Personal Computer : 
SONY PCV-RZ33P
•  It is no need to input password to the computer once registered.
(The screen requires password does not appear.)
•  If the personal computer or the finished inspection JIG II is changed, the password and the Com/User Characteristic Number are 
changed.Therefore on the startup, the password input is required again
3) Input the password and click [OK [Ent]], the following appears on the screen (Fig. 4-7-3).
Fig. 4-7-2
Fig. 4-7-3
4-7-3. Initial Setting of Lens Adjustment Program (ActuatorCheckerSAM)
1. Start 
up ACSAM-S-VerX.XX.exe .
 
 Fig. 
4-7-4
2.  When the Japanese window appears, click the [Set up] button, change the language to English.
Note: 
Depending on the initial startup or setting made at the previous startup, the window differs.
4-14
SAL55300 (DT 4.5-5.6/55-300 SAM) (DT 55-300mm F4.5-5.6 SAM)
3.  Set the following contents in the SETUP window.
MODEL 
Model to be adjustment in this time
Language English
State Final
Process
Service
 Table 
4-7-1
4.  Confirm that all of the items are set.
 
 Fig. 
4-7-5
5.  Click the [OK] to close the SETUP window.
4-7-4. About Inspection Procedure of Lens Adjustment Program (ActuatorCheckerSAM)
The inspection method has the method of executing the method of inspecting the corresponding model as everything continues and the 
inspection of each item one by one.
Click [START] from the start up window when you inspect the corresponding model as everything continues.
Click the inspection of each item from the start up window, when you inspect one by one. 
4-8. FINISHED ADJUSTMENT/INSPECTION
Equipment (Only dedicated equipment is listed.)
•  Adhesive Bond (B-10)
4-8-1. Preparation
1.  Connect the lens to be inspected to the equipment. (Refer to  4-7-2. Connection of Finished Inspection JIG II and Startup of Lens Ad-
justment Program (ActuatorCheckerSAM) .)
2.  Start the lens adjustment program (ACSAM-S-VerX.XX.exe).
3.  Click [Setup] and perform the initial setting. (Refer to  4-7-3. Initial Setting of Lens Adjustment Program (ActuatorCheckerSAM) .)
4-8-2. Completion  Adjustment/Inspection  Items
1. Adjustment/Inspection Method
1) Click 
[Start[Ent]].
2)  Follow the instructions on the screen.
2. Adjustment/Inspection Items
1)  Check AF/MF Switch
2)  Check LVDD1 Consumption Current 
3)  Adjust Focus Potentiometer 
4)  Check Zoom Pattern 
5) Adjust PI 
6)  Adjust Motor Gain
7)  Focus Load FB 
8)  Check Focus Potentiometer 
9)  Focus Motor Current 
10) Stopping Accuracy 
11) Write 
SB
Fig. 4-8-1
Note: 
 The following item is not adjusted automatically if it is adjusted or inspected by clicking [Start[Ent]].
12) Search Zoom Adj
4-15
SAL55300 (DT 4.5-5.6/55-300 SAM) (DT 55-300mm F4.5-5.6 SAM)
4-8-3. Zoom Pattern Inspection
1. Preparation
1)  Disassemble or assemble the lens to be inspected to set it in the state of Fig. 4-8-2.
Note:
  Disassembling the lens is not required during checking.
 Fig. 
4-8-2
2. Checking/Adjustment Method
1)  Loosen the two screws securing the brush.
2)  Adjust the Zoom Brush position as shown in the figure below, and then secure it with the screws.
Note:
  Adjust the Zoom Brush position so that the pattern cut A of the Zoom Encoder Board aligns with the Zoom Brush contacting point B.
3)  Check continuity between the top pattern and the fifth pattern from the top with a multimeter as shown in the figure below.
•  When the Zoom Brush is present at the pattern cut A, there is no continuity (adjustment OK).
•  When the Zoom Brush is not present at the pattern cut A, there is continuity (adjustment NG).
Zoom Brush
contacting point
Align the pattern cut A with the Zoom Brush contacting point.
Check continuity.
Apply the bond
(B-10)
Pattern cut A
Zoom Encoder Board˴
Zoom Brush
Brush Retainer Plate
 Fig. 
4-8-3
4)  Set the zoom from the WIDE end to the TELE end again, and check the Zoom Brush position.
5)  Click Inspect [Zoom Pattern] of ACSAM-S.
6)  If the zoom brush is on the TELE adjustment end, the following pop-up window appears.
 
 Fig. 
4-8-4
7)  Set the zoom to the TELE or WIDE end again and check that the TELE adjustment end is not deviated.
8)  After the adjustment has been completed, apply bond (B-10) to the screw head. (Refer to Fig. 4-8-3.)
4-8-4. Focusing Error Amount Adjustment (Write SB)
1) Click 
[Write 
SB].
 [Select 
SB] window is displayed.
 
At this time, the current 
SB is highlighted.
2) Write the 
SB based on the error amount that was confirmed by the  4-6. Focusing Error Amount Check .
 Example)
 
When changing the focus to the front (Front focus):   Select the left side of the button (current 
SB) that is highlighted and press the 
[Enter] key.
 
When changing the focus to the rear (Rear focus): 
 Select the right side of the button (current 
SB) that is highlighted and press the 
[Enter] key.
 
 (1)  (9)
 
To the front focus  To the rear focus
 Fig. 
4-8-5
3) Performs the 4-6. Focusing Error Amount Check , and check that the error amount is smaller than the reference value. 
 
If the error amount is larger than the reference value, perform [Write 
SB] again, and repeat steps 1) to 3) until the error amount be-
comes less than reference value.
1-1
SAL55300 (DT 4.5-5.6/55-300 SAM) (DT 55-300mm F4.5-5.6 SAM)
1. SERVICE NOTE
1-1. 
各種薬品の取り扱いについて
現在使用されている薬品の中には揮発性の高い薬品もあります。
それらを不用意に取り扱い蒸発させてしまうと,環境や健康へ影響を与えたり,資源の無駄使いになります。
各種薬品は,
下記の点に注意して取り扱ってください。
• 
保管場所を定め,高温になったり直射日光の当たらない場所に密閉して保管してください。
• 
小分け
(
ハンドラップ等
)
する数は必要最小限に留め,容器による自然蒸発を防いでください。
• 
作業に使用しない時は,必ずキャップ等をして自然蒸発を防いでください。
• 
薬品を使用する回数を極力少なくし,使用する場合は使用する量だけ容器より出して受け皿に残さないようにしてください。
1-2. 
外装部品の取り扱いについて
本機に使用されている外装部品は,
下記の点に注意して取り扱ってください。
• 
清掃には薬品を使用せず,清掃紙や清掃布を使用してください。
やむを得ず汚れがひどくて薬品を使用する場合は,シンナー,ケトン,エーテルは使用しないでください。
• 
各部品の取り付けには指定されたねじを使用し,部品に対して垂直に取り付けてください。
また,ねじを締め付ける時は,無理な力を加えないでください。
1-3. 
無鉛半田について
本機には無鉛半田が使用されています。
無鉛半田を使用している基板には,無鉛(
Lead Free
)を意味するレッドフリーマークがプリントされています。
注意
:
 
基板サイズによっては,無鉛半田を使用していてもレッドフリーマークがプリントされていないものがあります)
レッドフリーマーク
無鉛半田は,
下記の点に注意して使用してください。
• 
半田こてのこて先温度は約
350
℃に設定してください。
温度調節が無理な場合は,高温短時間で作業を行ってください。
注意:
  
半田こてを長く当てすぎると,基板のパターン(銅箔)がはがれてしまうことがありますので,注意してください。また,従来の半田よりも粘性が強い
ため,
IC
端子などが半田ブリッジしないように注意してください。
• 
半田こてのこて先は,必ず無鉛半田用と有鉛半田用に分けて管理してください。
無鉛半田と有鉛半田が混在すると剥離現象が発生してしまいます。
1-4. SAFETY CHECK-OUT
サービス,点検時には次のことにご注意ください。
1. 
注意事項をお守りください。
サービスのとき特に注意を要する個所については,キャビネット,シャーシ,部品などにラベルや捺印で注意事項を表示しています。これら
の注意書き及び取扱説明書等の注意事項を必ずお守りください。
2. 
指定部品のご使用を
セットの部品は難燃性や耐電圧など安全上の特性を持ったものとなっています。
従って交換部品は,使用されていたものと同じ特性の部品を使用してください。
特に回路図,部品表に0印で指定されている安全上重要な部品は必ず指定のものをご使用ください。
3. 
部品の取付けや配線の引きまわしはもとどおりに
安全上,チューブやテープなどの絶縁材料を使用したり,プリント基板から浮かして取付けた部品があります。
また内部配線は引きまわしやクランパによって発熱部品や高圧部品に接近しないよう配慮されていますので,これらは必ずもとどおりにし
てください。
4. 
サービス後は安全点検を
サービスのために取外したネジ,部品,配線がもとどおりになっているか,またサービスした個所の周辺を劣化させてしまったところがない
かなどを点検し,安全性が確保されていることを確認してください。
5. 
チップ部品交換時の注意
• 
取り外した部品は再使用しないでください。
• 
タンタルコンデンサのマイナス側は熱に弱いため交換時は注意してください。
6. 
フレキシブルプリント基板の取扱いについて
• 
半田こてのこて先温度は約
350
℃に設定してください。
• 
同一パターンに何度もコテ先を当てないでください。
(3
回以内
)
• 
パターンに力が加わらないよう注意してください。
注意
電池の交換は,正しく行わないと破裂する恐れがあります。
電池を交換する場合には必ず同じ型名の電池又は同等品と
交換してください。
使用済み電池は,取扱指示に従って処分してください。
Page of 49
Display

Click on the first or last page to see other SAL55300 service manuals if exist.