DOWNLOAD Sony DSC-QX10 Service Manual ↓ Size: 5.85 MB | Pages: 39 in PDF or view online for FREE

Model
DSC-QX10
Pages
39
Size
5.85 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera
File
dsc-qx10.pdf
Date

Sony DSC-QX10 Service Manual ▷ View online

DSC-QX10
4-7
4-4. LENS BLOCK
4-4-1. Removal and Installation
(1) Ornamental Ring A or Barrier Assy Replacing Method
Installation
Removal
5. Disengage the four claws and remove the Barrier Assy.
1. Fit the four claws while inserting the Barrier Lever into the hole and attach the Barrier Assy.
2. Peel off the release papers of the Barrier Tapes.
3. Install the Ornamental Ring A and press it lightly.
1. Turn on the power switch and extend the lens (TELE end).
2. Detach the battery.
3. Pour a solvent such as alcohol to two gaps A of the Ornamental Ring A with tweezers or a fine-tipped 
    stick as shown below.
4. Turn the Ornamental Ring A clockwise and counterclockwise 
    to detach it.
Solvent
A
Tweezers
Ornamental Ring A
Barrier Assy
Claws
Claws
Barrier Assy
Claws
Claws
Hole
Barrier
Lever
Barrier Tapes
Barrier Assy
Barrier Tapes
Ornamental Ring A
DSC-QX10
4-8
(2) DC Motor Worm Assy Replacing Method
Claws
Sensors
FG Leaf
Spring
Claw
FPC Retainer
Z Retainer
Removal
1. Disengage the two claws and remove the FG Leaf Spring.
2. Remove the two Sensors.
3. Disengage the claw and remove the FPC Retainer.
4. Disconnect the two flexible boards from the connectors on the LF-139 Flexible Board.
5. Peel off the FPC Tape.
6. Remove the LF-139 Flexible Board.
7. Remove the four screws and remove the Z Retainer and the Sensor.
8. Detach the Rear Mirror Plate and remove the Gear Worm Wheel, Gear A, and Gear B.
9. Remove the two screws and remove solder at two locations to detach the DC Motor Worm Assy.
Gear A
Gear B
Gear Worm
Wheel
Ribs
Rib
Rib
Rib
Boss
Boss
Screws
Screws
Screw
Sensor
Boss
Boss
Flexible board
LF-139 Flexible Board
LF-139 Flexible Board
Flexible board
FPC Tape
Connector
Connector
Rear Mirror
Plate
DC Motor Worm Assy
Solders
DSC-QX10
4-9
Fold inside
Draw up
Claws
Sensors
OK
NG
FG Leaf
Spring
FG Leaf Spring
FG Leaf Spring
Claw
FPC Retainer
Z Retainer
Installation
1. Install the LF-139 Flexible Board to the DC Motor Worm Assy and solder the LF-139 Flexible Board at two locations.
2. Install the DC Motor Worm Assy to the Stationary Tube Assy with two screws.
3. Install the Gear Worm Wheel, Gear A, and Gear B.
4. Install the Rear Mirror Plate.
5. Install four screws and the Z Retainer. Tighten the screws in the order of numbers in the figure below.
6. Install the LF-139 Flexible Board.
7. Connect the two Flexible Boards to the Connectors on the LF-139 Flexible Board.
8. Stick the FPC Tape as shown in the figure below.
9. Install the two Sensors and attach the FG Leaf Spring.
    Note: Attach the FG Leaf Spring in the correct orientation.
10. Attach the FPC Retainer.
1
2
3
4
Screws
Screws
Screw
Sensor
LF-139 Flexible Board
LF-139 Flexible Board
Flexible Board
Flexible Board
FPC Tape
FPC Tape
Rib
Connector
Connector
Gear A
Gear B
Gear Worm
Wheel
Rear Mirror
Plate
DC Motor Worm Assy
Solders
Ribs
Rib
Rib
Rib
Boss
Boss
Boss
Boss
DSC-QX10
4-10
(3) Three Tube Lubricating Block Assy and Group 1 Frame Replacing Method
Claws
Sensors
FG Leaf
Spring
Claw
FPC Retainer
4. Disconnect the flexible board from the connectors on the LF-139 Flexible Board.
5. Peel off the FPC Tape.
Flexible board
Flexible board
FPC Tape
Connector
Connector
Ribs
Rib
Rib
Rib
Boss
Boss
Boss
Boss
LF-139 Flexible Board
Z Retainer
Screws
Screw
Sensor
6. Remove the LF-139 Flexible Board.
7. Remove the four screws and remove the Z Retainer and the Sensor.
Removal
1. Disengage the two claws and remove the FG Leaf Spring.
2. Remove the two Sensors.
3. Disengage the claw and remove the FPC Retainer.
Page of 39
Display

Click on the first or last page to see other DSC-QX10 service manuals if exist.