DOWNLOAD Sony DAV-TZ215 / DAV-TZ715 / HBD-TZ215 / HBD-TZ715 Service Manual ↓ Size: 3.7 MB | Pages: 72 in PDF or view online for FREE

Model
DAV-TZ215 DAV-TZ715 HBD-TZ215 HBD-TZ715
Pages
72
Size
3.7 MB
Type
PDF
Document
Service Manual
Brand
Device
Audio
File
dav-tz215-dav-tz715-hbd-tz215-hbd-tz715.pdf
Date

Sony DAV-TZ215 / DAV-TZ715 / HBD-TZ215 / HBD-TZ715 Service Manual ▷ View online

HBD-TZ215/TZ715
5
DISCHARGE  THE  CHARGED  ELECTRICITY  IN  CAPACITORS  TO  PREVENT ELECTRIC  SHOCK  AS  FOLLOWS
When disassembling the machine, be sure to discharge the charged electricity in the following capacitors.
Use a resistor of 800 ohms, 2 Watts for discharging the following capacitors.
POWER board
   C903: 390V
   C932, C933, C934, CN904: 30V
ARRANGING  THE  USB  WIRE
Point of capacitor discharge for C932, C933, C934:
Connect to the red and black wire of CN904.
Point of capacitor discharge for C903:
Connect to the foot of C903.
800
:/2W
Have the USB wire spread on the inside 
of the claws of the chassis.
USB wire
USB wire
heat sink
heat sink
CN3000
CN509
CN906
red
black
Tie up with LP3002.
Tie up with LP501.
Draw the USB wire through CN3000.
Keep a distance of more than 6.5 mm 
between the wire and CN901. 
Keep the wire tied up from lying on 
the heat sink and the POWER board.
Keep the wire tied up from lying on 
the heat sink and the POWER board.
POWER board
CN901
HBD-TZ215/TZ715
6
SECTION  2
DISASSEMBLY
• 
This set can be disassembled in the order shown below.
2-1.  DISASSEMBLY  FLOW
2-2. CASE 
(KZ)
 (Page 
7)
2-15. HOW TO BEND WIRE (FLAT TYPE)
 (Page 
17)
2-3.  LOADING PANEL
 BLOCK
 (Page 
8)
2-4.  FRONT PANEL BLOCK
 (Page 
8)
2-5. FL 
BOARD, 
 
USB KEY BOARD,
 KZ-USB 
BOARD 
 (Page 
9)
2-14. DC MOTOR
 (LOADING)
 (M001),
 MS-203 
BOARD
 (Page 
17)
2-9. MAIN 
BOARD
 (Page 
13)
2-13. BELT
 (Page 
16)
2-10. POWER BOARD
 (Page 
14)
2-7.  BACK PANEL BLOCK
 (Page 
11)
2-6.  KEY-SW BOARD,
 P-SW 
BOARD
 (Page 
10)
2-8.  DVD MECHANISM DECK
 (CDM85MB-DVBU102)
 (Page 
12)
2-11. FFC HOLDER
 (Page 
15)
2-12. OPTICAL PICK-UP
 (KHM-313CAA)
 (Page 
16)
SET
HBD-TZ215/TZ715
7
Note: Follow the disassembly procedure in the numerical order given.
2-2. CASE 
(KZ)
5 case (KZ)
1 screw
     (BV3 (3-CR))
1 screw
     (BV3 (3-CR))
1 four screws
     (BV3 (3-CR))
1 screw
     (BV3 (3-CR))
2
3
4
3
HBD-TZ215/TZ715
8
2-3.  LOADING  PANEL  BLOCK
2-4.  FRONT  PANEL  BLOCK
4 loading panel block
3 two claws
1 Insert a screwdriver from between the front panel
 
and the chassis and slide the rod in the direction
 
of the arrow 
A.
tray
A
2
– Bottom view –
1 two screws
     (BV3 (3-CR))
5 four screws
     (BV3 (3-CR))
6 seven claws
6 claw
6 claw
7
2 two ground plate (front)
3 knob VOL (KZ)
4 nut
8 connector
 (CN5000)
9 front panel block
Page of 72
Display

Click on the first or last page to see other DAV-TZ215 / DAV-TZ715 / HBD-TZ215 / HBD-TZ715 service manuals if exist.