DOWNLOAD Sharp MX-2300N / MX-2700N / MX-2300G / MX-2700G / MX-2300FG / MX-2700FG (serv.man8) Service Manual ↓ Size: 21.98 MB | Pages: 88 in PDF or view online for FREE

Model
MX-2300N MX-2700N MX-2300G MX-2700G MX-2300FG MX-2700FG (serv.man8)
Pages
88
Size
21.98 MB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / Installation Manual
File
mx-2300n-mx-2700n-mx-2300g-mx-2700g-mx-2300fg-mx-2.pdf
Date

Sharp MX-2300N / MX-2700N / MX-2300G / MX-2700G / MX-2300FG / MX-2700FG (serv.man8) Service Manual ▷ View online

MX-2300/2700 N/G  MX-RBX1, MX-FNX2  8 – 4
3. Unpacking the MX-FNX2
A. Removal of the saddle finisher
B. Removal of the fixing tape and protection 
material
1) Remove the fixing tape and protection material.
C. Check the packed items
1)
Check that all the items are included in the package.
* The punch position labels (No.10 and No.11) should be kept at
hand since they will be necessary when installing the punch unit.
4. Installing the MX-FNX2
<Note before installation>
* Make sure that none of the data lamps on the operation panels
are lit or flashing before starting the installation work.
* Installing the MX-FNX2 requires that the option desk (MX-DEX1/
DEX2) and junction unit (MX-RBX1) be installed in advance.  Be
sure to complete the installation of the option desk (MX-DEX1/
DEX2) and junction unit (MX-RBX1) before installing the saddle
finisher.
* Make sure that the connection plate provided on the front side of
the option desk is securely installed.
Make sure that the connection plate (package part No. 2)
included in the package is securely installed.
A. Replacement of the Operation Manual storage 
cover
1)
Remove the Operation Manual storage cover on the left side of
the machine.
No.
Packed part names
Quantity
1
Paper exit tray
1
2
Connection plate
1
3
Staple unit
1
4
Staple cartridge
1
5
Fixing screw A
2
6
Fixing screw B
8
7
Paper entry guide
1
8
Staple position label (For scanner)
1
9
Staple position label (For RSPF)
1
10
Punch position label (For scanner)
1
11
Punch position label (For RSPF)
1
1
1
2
3
5
6
8
9
4
10
11
7
1
2
2
1
: Dec. 15 2005
1
MX-2300/2700 N/G  MX-RBX1, MX-FNX2  8 – 5
2) Install the Operation Manual storage cover (which was
removed from the machine) to the saddle finisher.
First, insert the pawl on the lower side of the Operation Manual
pocket.
Then, lift the pawl on the upper side and insert it, and slide
down to install.
B. Connection of the main unit and saddle 
finisher
1) Fix the connection plate (package part No. 2) to the paper feed
desk with two fixing screws A (package part No. 5).
2) Install the rail bracket to the frame with four fixing screws B
(package part No. 6).
C. Staple unit installation
1) Open the front cover of the finisher, and insert the staple unit
(package part No. 3).
2)
As shown in the figure, rotate the roller rotation knob so that
the triangle mark is fit with the indication.
3)
Insert the staple cartridge (package part No. 4) into the staple
section until it clicks.
NOTE:
Check to confirm that there are no clearance at the left and
right sections of the staple cartridge.
4)
Insert the staple unit and close the front cover of the finisher.
1
1
1
2
Roller rotation knob
Staple unit
: Dec. 15 2005
1
MX-2300/2700 N/G  MX-RBX1, MX-FNX2  8 – 6
D. Installation of the paper exit tray
1) Engage the pawls (two positions) of the paper exit tray (pack-
age part No. 1) on the finisher.
Fix the paper exit tray with four fixing screws B.
E. Height adjustment of the finisher
1) Put the finisher closer to the main unit, and check to insure that
the guide pin is smoothly inserted into the connection hole.
* If the guide pin is not inserted smoothly, perform the follow-
ing adjustment.
(1) When the guide pin is not fit with the connection 
hole in the finisher:
1) Loosen the fixing screw of the adjustment section on the rear
side. Adjust the height adjustment screw so that the guide pin
is fit with the connection hole in the finisher.
2)
Loosen the fixing screw of the adjustment section on the front
side. If the guide pin is inserted smoothly, tighten the fixing
screws of the adjustment section on the front/rear sides.
(2) When the guide pin is fit with the connection hole 
in the finisher:
1)
Insert the finisher into the main unit. Check to insure that the
upper and lower clearances between the main unit and the fin-
isher are even.
2)
If the upper and lower clearances between the main unit and
the finisher are not even, remove the screw (one for each) of
the foot covers on the front/rear sides, and remove the foot
cover.
Positioning dowel
Pawl
Pawl
Screw B
Connection hole
Guide pin
1
2
1
2
Clearance
Clearance
MX-2300/2700 N/G  MX-RBX1, MX-FNX2  8 – 7
3) Loosen four fixing screws of the adjustment section, and turn
the height adjustment screws on the front/rear sides to adjust
so that the clearances are even.
4) When the clearances are even, tighten the fixing screw of the
adjustment section, and install the foot cover.
F. Connector connection
1) Connect the finisher connector with the connector of the inter-
face pass unit, and tighten the screw.
2)
Connect the finisher connector with the connector of the main
unit, and tighten the screw.
G. Staple position label attachment
1)
Attach the label to the position indicated in the figure.
[For scanner] (package part No. 8)
[For RSPF] (package part No. 9)
Label attachment
reference
* Corner of the
"upper cabinet rear"
Corner R end fitting
Corner R end fitting
Cleaning of the document scan section
CAUTION
When streaks appear on copy or scan
images, open the automatic document
feed unit and clean the document scan
section with the glass cleaner (accessory).
Page of 88
Display

Click on the first or last page to see other MX-2300N / MX-2700N / MX-2300G / MX-2700G / MX-2300FG / MX-2700FG (serv.man8) service manuals if exist.