AR-M550/M620 INSTALLATION MANUAL (AR-LC6) 2 - 8
3) Then pull out the paper feed tray again until it stops.
[When shifted to the front side]
When shifting the print line from the paper center in the arrow direction
as shown below:
as shown below:
4) Loosen the red fixing screws (2 pcs. for each) of the front/back size
guide adjustment plate, and slide the side guide adjustment plate
in the direction A (R side) by the shift dimension. Tighten the red
fixing screws (2 pcs. for each). Slide the auxiliary guide in the
direction of A by the same dimension.
in the direction A (R side) by the shift dimension. Tighten the red
fixing screws (2 pcs. for each). Slide the auxiliary guide in the
direction of A by the same dimension.
Then push the paper feed tray into the machine, and return the
stopper to the original position, and fix it with the fixing screw (1 pc.).
stopper to the original position, and fix it with the fixing screw (1 pc.).
At that time, check that the stopper pawl is engaged with the stop-
per receiver of the large capacity tray.
per receiver of the large capacity tray.
5) Push the large capacity tray to the original position slowly.
Then make a copy again to check that the center is not shifted. Repeat
this procedure as required.
this procedure as required.
[When shifted to the rear side]
When shifting the print line from the paper center in the arrow direction
as shown below:
as shown below:
4) Loosen the red fixing screws (2 pcs. for each) of the front/back size
guide adjustment plate, and slide the side guide adjustment plate
in the direction B (F side) by the shift dimension. Tighten the red
fixing screws (2 pcs. for each), and push the paper feed tray into
the machine. Return the stopper to the original position, and fix it
with the fixing screw (1 pc.). Slide the auxiliary guide in the direc-
tion of B by the same dimension.
in the direction B (F side) by the shift dimension. Tighten the red
fixing screws (2 pcs. for each), and push the paper feed tray into
the machine. Return the stopper to the original position, and fix it
with the fixing screw (1 pc.). Slide the auxiliary guide in the direc-
tion of B by the same dimension.
At that time, check that the stopper pawl is engaged with the stop-
per receiver of the large capacity tray.
per receiver of the large capacity tray.
5) Push the large capacity tray slowly into the original position.
Then make a copy again to check that the center is not shifted. Repeat
this procedure as required.
this procedure as required.
A
R side
F side
B
R side
F side
AR-M550/M620 INSTALLATION MANUAL (AR-CF2) 3 - 1
[3] AR-CF2 UNPACKING AND
INSTALLATION
<Before installation>
Start installation after checking that the DATA indicator on the opera-
tion panel is neither lit nor blinking.
tion panel is neither lit nor blinking.
1. Unpacking
(Removal of the main unit)
(Removal of the parts included)
(Removal of the fixing member)
1) Remove the tape and open the upper door.
2) Remove the tape and remove the miramatte.
3) Remove the tape and remove the fixing member.
: Jan. 9 2004
1
AR-M550/M620 INSTALLATION MANUAL (AR-CF2) 3 - 2
4) Remove the tape and open the base cover.
5) Remove the connector cable fixing tape.
2. Installation
(Packaged parts check)
• Check to insure that all the following parts are packaged.
(1) Turn off the power of the main unit
1) Turn OFF the power switch on the right side of the main unit.
2) Open the front cabinet, and turn OFF the main power switch.
3) Disconnect the power plug from the power outlet.
<When the finisher (F15) or the saddle finisher (F16) is
installed>
installed>
(2) Removal of the connector between the main unit and
the finisher
1) Remove the screw from the finisher connector connected to the left
side of the main unit.
2) Disconnect the finisher connector.
Parts name
Quantity
1
Positioning plate
1 pc.
2
Upper limit regulation wire
1 pc.
3
Button cover
1 pc.
4
Screw C (M4 x 12 small screw bind)
3 pcs.
5
Screw D (M3 x 8 tapping bind)
2 pcs.
6
Screw E (M4 x 7 small screw bind)
2 pcs.
7
Screw F (M4 x 14 tapping bind)
2 pcs.
1
3
7
5
6
4
2
1
1
1
1
∗
If it is not installed, perform procedure (4).
1
2
3
1
1
2
: Jan. 9 2004
1
AR-M550/M620 INSTALLATION MANUAL (AR-CF2) 3 - 3
(3) Removal of the rail, the connectting plate, and the
earth plate
1) Separate the finisher and the main unit.
2) Remove two screws which are fixing the connecting plate under the
finisher.
3) Remove the plate (fixed by one screw) from the rear lower section
of the finisher.
4) Go to procedure 5.
<When the finisher (F15) and the saddle finisher (F16) are
not installed to the main unit>
not installed to the main unit>
(4) Attach the positioning pin and the earth plate to the
main unit. (Use the packaged parts of the finisher.)
1) Remove the connector cover fixing screw for connection of the fin-
isher joint harness connector, and remove the connector cover.
∗
Only when the finisher and the inserter are installed together, per-
form this procedure.
form this procedure.
Note: For fixing screws H and I, use the packaged parts of the AR-
F15/F16.
3) Attach the earth plate with the fixing screws H (2 pcs.) to the left
lower section of the main unit.
In this case, attach so that the R mark on the earth plate faces up.
4) Pull out the lock release lever on the left side of the main unit, and
open the left door.
5) Remove the paper exit cover on the upper side of the left door.
6) Close the left door.
1
2
1
2
1
2
2) Attach the positioning pin with two fixing screws I to the left upper
section of the main unit. Be careful to the attachment direction of
the positioning pin.
the positioning pin.
1
F
R
2
1