Panasonic TH-75EQ1W (serv.man2) Service Manual ▷ View online
DIS-5
SECTION 2 DISASSEMBLY PROCEDURES
<75EQ1>
2.2. Rear cover removal
[REAR COVER MID removal]
1. Remove 4 screw S3 and 16 screw S8.
2. Remove the REAR COVER MID (Ref. No.9).
[REAR COVER removal]
1. Remove a screw S3 and 8 screw S8.
2. Remove the REAR COVER (Ref. No.11).
3. Remove a screw S3 and 10 screw S8.
4. Remove the REAR COVER (Ref. No.10).
9
: Screw S8 (16pcs) : Screw S3 (4pcs)
10
11
: Screw S8 (18pcs) : Screw S3 (2pcs)
DIS-6
SECTION 2 DISASSEMBLY PROCEDURES
<75EQ1>
2.3. A module removal
1. Disconnect 5 connectors on the A module (Ref.No.30).
Note: Pay attention not to tear off the cable from the connector.
2. Remove 3 screw S8 and 4 screw S9.
And then remove the A module (Ref.No.30) and BKT IO BTM (Ref.No.15).
3. Remove 6 Hex screws (Ref.No.31) and remove the BKT IO BTM from the A module.
: Screw S8 (5pcs) : Screw S9 (4pcs)
[ A3 ]
[ CN901 ]
[ A2 ]
[ A13 ]
[ A6 ]
30
[ CN901 ]
[ A13 ]
[ A6 ]
[ A3 ]
[ A2 ]
30
15
14
31
31
DIS-7
SECTION 2 DISASSEMBLY PROCEDURES
<75EQ1>
2.4. P1 module removal
1. Disconnect 4 connectors on the P module (Ref.No.28).
Note: Pay attention not to tear off the cable from the connector.
2. Remove a screw S2 and 10 Screw S9, and then remove the P module (Ref.No.28).
: Screw S2 (1pc) : Screw S9 (10pcs)
28
[ CN903 ]
[ CN902 ]
[ CN904 ]
[ CN903 ]
[ CN902 ]
[ CN904 ]
[ CN901 ]
28
DIS-8
SECTION 2 DISASSEMBLY PROCEDURES
<75EQ1>
2.5. AC inlet removal
1. Remove 2 screws on connector CN901 and remove the cables of AC inlet.
2. Remove a screw S2 and 2 screw S4, and then remove the AC ASSY (Ref.No.42) and the COVER CABLE (Ref.No.24)
from the REAR_COVER (Ref.No.7).
S4
24
S2
[ CN901 ]
7
42
Click on the first or last page to see other TH-75EQ1W (serv.man2) service manuals if exist.