DOWNLOAD Panasonic UB-5335 / UB-5835 (serv.man2) Service Manual ↓ Size: 4.9 MB | Pages: 127 in PDF or view online for FREE

Model
UB-5335 UB-5835 (serv.man2)
Pages
127
Size
4.9 MB
Type
PDF
Document
Service Manual
Brand
Device
Service Manual / Other / ELECTRONIC BOARD
File
ub-5335-ub-5835-sm2.pdf
Date

Panasonic UB-5335 / UB-5835 (serv.man2) Service Manual ▷ View online

13
3.2.2.
Power Operation Mode and Setting Mode
14
4 INSTALLATION
The Panaboard is used by hanging it on the wall or installing it on the stand (sold separately as an option).
When using the Panaboard by hanging it on the wall, refer to the description in this manual or the Installation Manual for UB-5335/
5835.
When using the Panaboard by installing it on the stand (sold separately), refer to the Installation Manual for UB-5335/5835 to
assemble the stand, then refer to the description below except for sections 4.4 and 4.5 for installation.
4.1.
Requirements on Installation
Since the Panaboard is precision equipment, the operation is affected by the installation environment.
Avoid usage in the following environment to secure stable operation.
(1) Outdoor use or the environment below:
- Exposure to direct rain or water (includes space under the eaves)
- Location with much moisture and oil such as factories and kitchens, and special environment such as in combustible atmo-
sphere
- On the sea or seaside, and where corrosive gas is generated
- Locations exceeding usage temperature range (ambient temperature of 10 to 35 
°C
, humidity of 30 to 80%)
(2) Under direct sunlight, or near cooler/heater
4.2.
Securing Space
Before installing the Panaboard, be sure to secure space shown in section 2.6.
Note: Location of the power outlet:
- Must be within 3 m from the installation position of the Panaboard
- Must not be behind the Panaboard
15
4.3.
Checking Components
The following parts are included in the Panaboard main body product box. Check that all parts are included before installation. Take
out the Board Attachment Upper (A1) and Board Attachment Lower (A2) from the component box. 
Note:
When using the Panaboard by placing it on the Stand (sold separately), refer to the Installation Manual for UB-5335/
5835 to assemble the Stand, then refer to the description below except for sections 4.4 and 4.5 for installation.
16
4.4.
Installation of Wall Hanging Fittings
4.4.1.
Necessary Tools and Parts
The way of hanging the Panaboard depends largely on the structure of the wall. Consult the building manager, the managing engi-
neer, or the designer in advance, whether the structure of the wall is suitable for hanging the heavy system to the wall. For safety,
consult the selection of attachment bolt (sold on the open market) and the construction method sufficiently before attachment.
(1) Tools necessary for assembly
      Phillips screwdriver
      Drill
      Measuring tape
      Level
      Dust pump
      Hammer
      Torque driver (*1 The torque needs to be specified)
Note: *1
The torque specification range has a limit. Use an appropriate torque driver.
(Recommended tightening torque: 5.2 N m [53 kgf cm]
(2) Parts required for wall hanging construction
      Anchors: 4 pcs
      M6 bolts: 4 pcs
      Flat washers: 4 pcs
      Spring washers: 4 pcs
Note:
Specified pulling strength of 5 times or more is required per anchor. 
The anchor bolt M6 is used for hanging the Panaboard on the wall.
(Specified pulling strength = 196 N [20 kgf] or more)
4.4.2.
Request on Construction
4.4.2.1.
Safety Notice on Construction
When attaching the Panaboard, read the following instructions carefully so that no accidents occur.
    - Make sure that safety control is secured so as to secure safe and secure operation.
    - When the Panaboard shape is changed or is damaged by shock at transportation or at installation, do not perform installation as 
it may fall.
4.4.2.2.
Installation Surface
• Do not attach the Panaboard to a wall not made of plasterboard or plywood that is the major construction section (concrete of
120 mm or more) since its strength is weak. If it is to be inevitably attached, provide sufficient reinforcement (securing five times
or more strength of specified pulling strength of the anchor).
Page of 127
Display

Click on the first or last page to see other UB-5335 / UB-5835 (serv.man2) service manuals if exist.