DOWNLOAD Panasonic NC-PH22WTW / NC-PH30WTW Service Manual ↓ Size: 876.83 KB | Pages: 33 in PDF or view online for FREE

Model
NC-PH22WTW NC-PH30WTW
Pages
33
Size
876.83 KB
Type
PDF
Document
Service Manual
Brand
Device
Home Appliance / ELECTRIC THERMO POT
File
nc-ph22wtw-nc-ph30wtw.pdf
Date

Panasonic NC-PH22WTW / NC-PH30WTW Service Manual ▷ View online

- 21 -
1. Set 2 ribs of hold spring A on cover plate 
    to assemble thermistor assy.
2. Assemble hold spring A on cover plate.
4.21 Thermistor assembly
Paste Decoration panel tightly.
4.22 How to paste Decoration panel
FIG. 23
FIG. 22
Operating point
Paste from A-portion before and follow the
arrow direction.
Peel of scratch protection sheet from decoration
panel surface.
Thermistor assy
Hold spring A
Cover plate
Spring grooves
position
NC-PH22, NC-PH30
4
- 22 -
4.23 Lead wire assy E assembly
Put lead wire assy E on control unit A, B by
turn printing side on the back.
FIG. 24
FIG. 25
4.24 Shaft assembly
Set 4 legs of shaft into groove of Fig. 25 pump
comp., as picture below.
Control unit A (Bottom)
Control unit B 
(Operation)
Shaft
Shaft
Leg
Leg
Slot
NC-PH22, NC-PH30
Lead wire assy E
- 23 -
1. Assemble seal ring on valve A, then assemble spring B.
2. Set 4 legs of valve A of pump comp., as picture below.
4.25 Valve A, Seal ring and Spring B assembly
Use finger to Block         position, and push tightly to prevent air leak from Lid.
(If there is some rebound on Pump Comp., it means OK.)
4.26 How to check Pump comp.
FIG. 27
FIG. 26
Operating point
Assemble pump comp., to lid after check air leak.
If do not set packing lid well, it may not withstand pushing reaction. (Packing lid should not be open)
Operating point
Flat side of sealing should reach to base of valve A.
Valve A
Seal ring
Spring B
Leg
Hole
 Picture when remove Spring B. to make
more  understand how to set Valve A
Lid packing
Valve A
Push
NC-PH22, NC-PH30
- 24 -
4.27 Recheck
After assembly please recheck water leak, insulation resistance and operation, those are usual
or unusual.
: Measure by 500VDC insulation meter, the result should be more than 2M
Ω.
  (Measuring between 2 pins of plug and screw)
Insulation resister
: Should stand at 1000VAC for 1 minute.
  (Measuring location is same as INSULATION RESISTER)
Insulation resistance
: Thermo pot performance test mode (P. 5) and operation is usual or unusual.
Current check
5. PRODUCTION NO. POSITION
Production No. is located at bottome plate.
Production date
NC-PH22, NC-PH30
Page of 33
Display

Click on the first or last page to see other NC-PH22WTW / NC-PH30WTW service manuals if exist.