Panasonic CR14C Service Manual ▷ View online
Step 3: Push the trays out.
10.3.4. Assembly of UD Base Unit
Step 1: Push the catch and slide the UD cam R guide as arrows
shown.
shown.
Step 2: Slot the UD base unit into the grooves.
Step 3: Ensure the change arm slot onto the groove then place
down the UD base unit into the open grooves.
down the UD base unit into the open grooves.
Step 4: Slide the UD cam R guide as arrow shown to lock in the
UD base unit.
UD base unit.
Step 5: Turn over the set and fix the FFC wires by using the
57
CR14C
adhesive tapes.
Step 6: Push in the trays.
Step 7: Install tray lock lever.
Step 8: Install OC assy.
58
CR14C
Step 9: Install OC spring.
Step 10: Attach the top cover to the tray stoppers.
Step 11: Slide the top cover as arrow shown.
Note: Ensure both claws are catched.
59
CR14C
60
CR14C
Click on the first or last page to see other CR14C service manuals if exist.