Panasonic CR14C Service Manual ▷ View online
• Assembly of UD Cam Lock
Step 16: Slot cam lock onto the grooves.
Step 17: Move the UD cam lock as arrow shown, make sure the
UD came lock is underneath both guides.
UD came lock is underneath both guides.
• Assembly of Slider Arm
Step 18: Install the slider arm.
• Assembly of Trigger Link Lever
Step 19: Slide and hold the all trigger lever as arrow shown
followed by Install the trigger link lever.
followed by Install the trigger link lever.
53
CR14C
Step 20: Make sure the trigger link spring is hooked underneath
the catch.
the catch.
• Assembly of Change Lever and Change Gear
Step 21: Slot the change gear onto the change lever.
Step 22: Align change gear to the shaft and snap both bosses
of the change lever to the hooks.
of the change lever to the hooks.
• Assembly of Cam Gear
Step 23: Adjust both parts to align with the underneath holes.
Step 24: Align the holes and press down until it “click”.
54
CR14C
• Assembly of Relay Gear and UD Drive Gear
Step 25: Install relay gear and UD drive gear respectively.
• Assembly of Pulley Gear and Belt
Step 26: Install pulley gear.
Step 27: Install belt.
• Assembly of OC Drive Gear
Step 28: Install OC drive gear.
• Assembly of Pitch Plate
Step 29: Install the pitch plate, ensure all the catches hooked
onto the mecha base assy.
onto the mecha base assy.
55
CR14C
Step 30: Ensure the guide is underneath the mecha base assy.
Step 31: Fix 1 screw.
10.3.3. Assembly of Trays
Step 1: Slot and tilt the trays as arrows shown.
Step 2: Place down the trays and position underneath their
respective guides.
respective guides.
56
CR14C
Click on the first or last page to see other CR14C service manuals if exist.