Panasonic CR14 Service Manual ▷ View online
6.2. Description of tray selection operation
1. The loading motor turns in the clockwise direction and the rotation is transmitted via the belt, the pulley gear also turns clockwise.
2. The relay gear turns counter clockwise.
3. The change gear turns clockwise.
4. The cam gear turns counter clockwise.
5. The UD drive gear turns counter clockwise engages UD cam L guide drives UD connection turns counter clockwise, UD cam R
guide is driven to move UD base unit down.
guide is driven to move UD base unit down.
(The operation of the UD base unit up is the opposite of that for the UD base unit down.)
9
CR14
6.3. Description of play operation
1. The loading motor turns in the clockwise direction and the rotation is transmitted via the belt, the pulley gear also turns cloc
2. The relay gear turns counter clockwise.
3. The change gear turns clockwise.
4. The cam gear turns counter clockwise.
5. Turn the TRV motor clockwise, the tray will load into play position until OPU at the centre position.
10
CR14
This section is not available at the time of issue.
7 Mechanism Operations Description
11
CR14
8 CR14 Mechanism Reliability
Purpose: To test the CR14 mechanism unit operation by using the Reliability P.C.B. before installation into the main unit.
8.1. Setup Connection
Below diagram shows the set-up necessary to carry out the reliability of mechanism.
Equipments required for the set up preparation:
- Power supply
- Reliability P.C.B. (RFKZCR14)
12
CR14