Panasonic CR14 Service Manual ▷ View online
• Assembly of Relay Gear and UD Drive Gear
Step 25: Install relay gear and UD drive gear respectively.
• Assembly of Pulley Gear and Belt
Step 26: Install pulley gear.
Step 27: Install belt.
• Assembly of OC Drive Gear
Step 28: Install OC drive gear.
• Assembly of Pitch Plate
Step 29: Install the pitch plate, ensure all the catches hooked
onto the mecha base assy.
onto the mecha base assy.
53
CR14
Step 30: Ensure the guide is underneath the mecha base assy.
Step 31: Fix 1 screw.
10.3.3. Assembly of Trays
Step 1: Slot and tilt the trays as arrows shown.
Step 2: Place down the trays and position underneath their
respective guides.
respective guides.
54
CR14
Step 3: Push the trays out.
10.3.4. Assembly of UD Base Unit
Step 1: Push the catch and slide the UD cam R guide as arrows
shown.
shown.
Step 2: Slot the UD base unit into the grooves.
Step 3: Ensure the change arm slot onto the groove then place
down the UD base unit into the open grooves.
down the UD base unit into the open grooves.
Step 4: Slide the UD cam R guide as arrow shown to lock in the
UD base unit.
UD base unit.
55
CR14
Step 5: Turn over the set and fix the FFC wires by using the
adhesive tapes.
adhesive tapes.
Step 6: Push in the trays.
Step 7: Install tray lock lever.
56
CR14
Click on the first or last page to see other CR14 service manuals if exist.