Panasonic CR14 Service Manual ▷ View online
• Assembly of UD Cam R Guide
Step 10: Insert the boss of the UD cam R guide onto mecha
base assy’s groove.
base assy’s groove.
Step 11: Ensure UD cam R guide seated properly onto the
guides and slide as arrow shown.
guides and slide as arrow shown.
• Assembly of UD Cam L Guide
Step 12: Install UD cam L guide align with all guides.
49
CR14
• Assembly of UD Connection
Step 13: Slide the UD cam L guide until it stop as arrows
shown.
shown.
Step 14: Push the catch and slide the UD cam R guide as
arrows shown.
arrows shown.
Step 15: Slot the UD connection onto the boss (L) and turn to
the direction as arrow shown to slot onto boss (R) to install it.
the direction as arrow shown to slot onto boss (R) to install it.
50
CR14
• Assembly of UD Cam Lock
Step 16: Slot cam lock onto the grooves.
Step 17: Move the UD cam lock as arrow shown, make sure the
UD came lock is underneath both guides.
UD came lock is underneath both guides.
• Assembly of Slider Arm
Step 18: Install the slider arm.
• Assembly of Trigger Link Lever
Step 19: Slide and hold the all trigger lever as arrow shown
followed by Install the trigger link lever.
followed by Install the trigger link lever.
51
CR14
Step 20: Make sure the trigger link spring is hooked underneath
the catch.
the catch.
• Assembly of Change Lever and Change Gear
Step 21: Slot the change gear onto the change lever.
Step 22: Align change gear to the shaft and snap both bosses
of the change lever to the hooks.
of the change lever to the hooks.
• Assembly of Cam Gear
Step 23: Adjust both parts to align with the underneath holes.
Step 24: Align the holes and press down until it “click”.
52
CR14
Click on the first or last page to see other CR14 service manuals if exist.