DOWNLOAD Panasonic CS-F18DTE5 / CU-L34DBE5 Service Manual ↓ Size: 16.38 MB | Pages: 127 in PDF or view online for FREE

Model
CS-F18DTE5 CU-L34DBE5
Pages
127
Size
16.38 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner / AIR CONDITIONER
File
cs-f18dte5-cu-l34dbe5.pdf
Date

Panasonic CS-F18DTE5 / CU-L34DBE5 Service Manual ▷ View online

 • If a drain pipe needs to be installed, insert the accessory drain elbow into the mounting hole at the bottom of the outdoor unit,
and connect a hose with an inside diameter of 15mm to this drain elbow.
(The hose is not supplied.)
If using the drain elbow, install the outdoor unit on a base which is at least 5cm high.
NOTE
In cold regions (where the outdoor air temperature can drop to 0°C or below continuously for 2-3 days), the drain water may freeze,
and this may prevent the fan from operating. Do not use the drain elbow in such cases.
10.5.6. Connecting the pipes
 • Use a clean pipe which does not include water or dust for inside of piping.
 • When cutting the refrigerant pipes, a piping cutter must be used. Before connecting the refrigerant pipes, blow nitrogen and
blow off dust in the pipes.
(Never use tools which cause a lot of dust such as a saw and a magnet.)
 • When waxing replace nitrogen inside the piping after removing dirt and dust. (In order to prevent oxidization scale from forming
inside the piping).
 • The refrigerant pipes are of particular importance.
The installation work for refrigerant cycles in separate-type air conditioners must be carried out perfectly.
 1. Refer to the table below for the pipe diameters equivalent lengths and indoor/outdoor unit difference of elevation.
Pipe diameter (mm)
Equivalent length (m)
Difference of elevation (m)
Liquid-side pipes
Gas-side pipes
ø9.52 x 0.8
ø15.88 x 1.0
50
30
 2. Local pipes can project in any of four directions.
 • Make holes in the pipe panels for the pipes to pass through.
 • Be sure to install the pipe panels to prevent rain from getting inside the outdoor unit.
[Removing the service panel].
(1)
(2)
Remove the two mounting screws.
Slide the service panel downward to release the pawls. After this, pull the
service panel toward you to remove it.
45
CS-F18DTE5 CU-L34DBE5 /
Caution
Use a material with good heat-resistant properties as the
heat insulation for the pipes. Be sure to insulate both the
gas-side and liquid-side pipes. If the pipes are not
adequately insulated, condensation or water leakages
may occur.
Liquid-side pipes
Material that can withstand
Gas-side pipes
120°C or higher
 3. Notes when connecting the refrigerant pipes.
 • Use clean copper, pipes with no water or dust on the insides.
 • Use phosphorus-free, unjointed copper pipes for the refrigerant pipes.
 • If it is necessary to cut the refrigerant pipes, be sure to use a pipe cutter, and use compressed nitrogen or an air blower to
clean out any foreign particles from inside the pipe.
 • Be careful not to let any dust, foreign materials or water get inside the pipes during connection.
 • If bending the pipes, allow as large a bending radius as possible. Do not flex the pipes any more than necessary.
 • If joining pipe ends, do so before tightening the flare nut.
 • Always blow the pipe end with nitrogen while joining pipe ends.
(This will prevent any oxide scaling from occurring inside the pipe.)
 • If using long pipe lengths with several joined pipe ends, insert strainers inside the pipes. (Strainers are not supplied.)
 • When tightening the flare nuts, coat the flare (both inside surfaces) with a small amount of refrigerator oil, and screw in
about 3-4 turns at first by hand.
 • Refer to the following table for the tightening torques. Be sure to use two spanners to tighten.
(If the nuts are overtightened, it may cause the flares to break or leak.)
 4. After piping connection has been completed, make sure that the joint areas of the indoor and outdoor units are free from gas
leakage by the use of nitrogen, etc.
 5. Air purge within connection piping shall be carried out by evacuation.
 6. Close the tube joining area with putty heat insulator (local supply) without any gap as shown in below figure.
(To prevent insects or small animal entering)
10.5.7. Heat insulation
10.5.8. Charging with refrigerant
 • At the time of shipment from the factory, this unit is charged with enough refrigerant for an equivalent pipe length of 30m. If the
equivalent pipe length used will be 30m or less, no additional charging will be necessary.
 • If the equivalent pipe length will be between 30 and 50m, charge with additional refrigerant according to the equivalent length
given in the table below.
 − For standard type
Additional charging amount
Equivalent length
0.05 kg/m
50m
46
CS-F18DTE5 CU-L34DBE5 /
 • Pump down operation
 − Operate the pump down according to the following procedures.
Procedure
Notes
1. Confirm the valve on the liquid side and the gas side is surely open.
2. Press the PUMP DOWN switch on outdoor printed board for 1
second or more.
Perform the cooling operation for five minutes or more.
3. Shut the valve on the liquid side surely.
When the valve is shut halfway, the compressor is occasionally
damaged.
10.5.9. Electrical wiring
Warning
The units must be connected to the supply cables for fixed wiring by qualified technician.
Feed the power source to the unit via a distribution switch board designed for this purpose, the switch should disconnected all
poles with a contact separation of at least 3mm.
When the supply cable is damaged, it must be replaced by qualified technician.
Caution
Be sure to install a current leakage breaker, main switch and fuse to the main power supply, otherwise electric shocks may
result.
Caution
Be sure to connect the unit to secure earth connection.
If the earthing work is not carried out properly, electric shocks may result.
Warning
Wiring shall be connected securely by using specified cables and fix them securely so that external force of the cables may
not transfer to the terminal connection section.
Imperfect connection and fixing leads to fire, etc.
 • Connect the power supply wiring and indoor/outdoor unit connection wiring according to the electrical circuit diagram
instructions.
 • Clamp the wires securely to the terminal connections using cord clamps so that no undue force is placed on the wires.
 • Once all wiring work has been completed, tie the wires and cords together with the binding strap so that they do not touch other
parts such as the compressor and pipes.
1.
Connect the power supply line to a 3-phase/380-415V (or single-phase 220-
240V) power supply.
2.
The equipment shall be connected to a suitable mains network with a main
impedance less than the valve indicated in the table of power supply
specifications.
3.
Be sure to connect the wires correctly to terminal board with connecting the
crimp type ring terminal to the wires.
4.
The binding screws inside the power supply box may become loosened due to
vibration during transportation, so check that they are tightened securely.
5.
Tighten the binding screws to the specified torque while referring to the table
below.
6.
If connecting two separate wires to a single crimped terminal, place the two
crimped terminal wires together as shown in Fig. A. (If the arrangement shown in
Fig. B is used, poor contacts or contact damage may result.)
7.
If momentarily turning on the power supply for both the indoor and outdoor units,
do not turn the power off again until at least 1 minute has passed (except when
a reversed phase has been detected).
Warning
Use only the specified cables for wiring connections. Connect the cable securely, and secure them properly so that no undue
force will be applied to the terminal connections.
If the terminals are loose or if the wires are not connected securely, fire may result.
Terminal screw
Tightening torque N.cm {kgf.cm}
M3
69 ~ 98 {7 ~ 10}
M4
157 ~ 196 {16 ~ 20}
M5
196 ~ 245 {20 ~ 25}
47
CS-F18DTE5 CU-L34DBE5 /
Earth lead wire shall be longer than other lead wires as shown in the figure for the electrical safety in case of the slipping out of the
cord from the anchorage.
 • Power supply specifications
Model name
Leakage
current
Circuit breaker
(Minimum Capacity)
Minimum
power
4mm
2
cable
Maximum
permissible
impedance
(
Ω)
Indoor/outdoor
unit connection
breaker
(A)
Switch
(A)
Fuse
(A)
supply
cables
based on
length (m)
power cables
(terminals
,
,
,
)
CU-L24DB***
220V-240V~
30
30
20
4 mm
2
14
0.1
2.5 mm
2
× 3
CU-L28DB***
220V-240V~
30
30
20
14
0.1
CU-L34DB***
220V-240V~
40
40
30
9
0.05
CU-L43DB***
220V-240V~
40
40
40
8
0.05
CU-L50DB***
380V-415V 3N~
30
30
30
11
0.02
NOTE
 1. 
Where ground work (earth) is carried out, do not connect the ground return to the gas pipe, water line pipe, grounded circuit of the
telephone and lightning rod, or ground circuit of other product in which earth leakage breaker is incorporated. (Such action is
prohibited by statute, etc.)
Make sure the indoor and outdoor connection wires are detangled. (There might be effect to received outside noise.)
 2. 
Use the standard power supply cables for Europe (such as H05RN-F or H07RN-F which conforms to CENELEC (HAR) rating
specifications) or use the cables based on IEC standard. (245IEC57, 245IEC66)
 3. 
Select the particular size of electrical wire for power supply cables in accordance with the standards of the given nation and
region.
48
CS-F18DTE5 CU-L34DBE5 /
Page of 127
Display

Click on the first or last page to see other CS-F18DTE5 / CU-L34DBE5 service manuals if exist.