Report No.: EM201300534-2 Application No.: ZJ00032799 Page 45 of 58
5.7 INJECTED CURRENTS SUSCEPTIBILITY TEST
5.7.1 TEST SPECIFICATION
Basic Standard
EN 61000-4-6:2009
Frequency Range
0.15 MHz-80 MHz
Field Strength
3 V
Modulation
1 kHz,80% AM
Frequency Step
1%
Dwell time
1s
5.7.2 TEST PROCEDURE
1) Set up the EUT, CDN as shown on Section 5.7.3
2) Let the EUT work in test mode and measure it.
3) The EUT are placed on an insulating support 0.1m high above a ground reference plane. CDN
2) Let the EUT work in test mode and measure it.
3) The EUT are placed on an insulating support 0.1m high above a ground reference plane. CDN
(coupling and decoupling device) is placed on the ground plane about 0.3m from EUT. Cables
between CDN and EUT are as short as possible, and their height above the ground reference
plane shall be between 30 and 50 mm (where possible).
between CDN and EUT are as short as possible, and their height above the ground reference
plane shall be between 30 and 50 mm (where possible).
4) The disturbance signal described below is injected to EUT through CDN.
5) The EUT operates within its operational mode(s) under intended climatic conditions after
5) The EUT operates within its operational mode(s) under intended climatic conditions after
power on.
6) The frequency range is swept from 150 kHz to 80MHz using 3V signal level, and with the
disturbance signal 80% amplitude modulated with a 1 kHz sine wave.
7) The rate of sweep shall not exceed 1.5*10-3decades/s. Where the frequency is swept
incrementally, the step size shall not exceed 1% of the start and thereafter 1% of the preceding
frequency value.
frequency value.
8) Recording the EUT operating situation during compliance testing and decide the EUT immunity
criterion.
Report No.: EM201300534-2 Application No.: ZJ00032799 Page 46 of 58
5.7.3 TEST SETUP
Report No.: EM201300534-2 Application No.: ZJ00032799 Page 47 of 58
5.7.4 TEST RESULTS
EUT
Wireless speaker system
Mode Number
JBL VOYAGER
Test date
2013-08-08
Voltage Supply
AC 230V/50HZ
Test Engineer
Bruce
environment
Tem:23℃ Hum:57 %101kPa
Test mode:
1. Test the EUT in mode 1:
AUDIOIN
(adapter)
2. Test the EUT in mode 2:
BT
(adapter)
3. Test the EUT in mode 3:
BT
(battery)
4. Test the EUT in mode 4: Standby
Frequency
Band (MHz)
Field
Strength
(Vrms)
Cable
Injection
Method
Required
Passing
Performance
Actual
performance
Result
0.15-80
3
AC Line CDN-M2/M3 Criterion A Criterion A*
PASS
A*: EUT is working on intended use operation, no abnormal phenomena were observed.
Report No.: EM201300534-2 Application No.: ZJ00032799 Page 48 of 58
5.8 VOLTAGE DIP & VOLTAGE INTERRUPTIONS
5.8.1 TEST SPECIFICATION
Basic Standard
EN 61000-4-11:2004
Test duration time
Voltage dips:
30 during 25 periods,
Meets the requirements of Performance Criterion C
Meets the requirements of Performance Criterion C
Voltage interruption:
100% during 0.5 cycles,
100% during 1 cycles,
100% during 1 cycles,
Meets the requirements of Performance Criterion B
100% during 250 cycles,
Meets the requirements of Performance Criterion C
Interval between event
10s for each dips at each test angle
Phase Angle
0°
Test cycle
3
5.8.2 TEST PROCEDURE
a) The EUT and test generator were setup as shown on Section
b) The interruptions is introduced at selected phase angles with specified duration.
b) The interruptions is introduced at selected phase angles with specified duration.
c) Record any degradation of performance.
5.8.3 TEST SETUP