DOWNLOAD JBL VOYAGER (serv.man2) Service Manual ↓ Size: 1.69 MB | Pages: 58 in PDF or view online for FREE

Model
VOYAGER (serv.man2)
Pages
58
Size
1.69 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
voyager-sm2.pdf
Date

JBL VOYAGER (serv.man2) EMC - CB Certificate ▷ View online

Report No.:  EM201300534-2                Application No.:  ZJ00032799                        Page 41 of 58 
 
 
5.5 ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST 
5.5.1 TEST SPECIFICATION 
Basic Standard 
EN 61000-4-4: 2012 
Test Voltage 
Electrical Fast Transient/Burst – EFT: 
AC Power Port: ±1kV,Signal port ±0.5kV 
Performance Criterion B 
Polarity 
Positive and Negative 
Impulse Frequency 
5 kHz 
Impulse Wave-shape 
5 ns/50ns for voltage  
Burst Duration 
15 ms 
Burst Period 
300 ms 
Test Duration 
2 minutes 
5.5.2 TEST PROCEDURE  
 
The EUT and its simulators shall be placed 0.1m high above the ground reference plane which is a min. 
1m×1m metallic sheet with 0.65mm minimum thickness. This reference ground plane shall project 
beyond the EUT by at least 0.1m on all sides and the minimum distance between EUT and all other 
conductive structure, except the ground plane beneath the EUT, shall be more than 0.5m. 
For input and AC power ports
The EUT is connected to the power mains by using a coupling device which couples the EFT 
interference signal to AC power lines. Both polarities of the test voltage should be applied during 
compliance test and the duration of the test can’t less than 1min. 
5.5.3 TEST SETUP 
 
 
 
 
 
10 cm 
isolation 
supporter
AC
 input 
EFT 
Generator 
EUT 
AC
  
AC Line 
Ground Reference Plane 
0.5m
Report No.:  EM201300534-2                Application No.:  ZJ00032799                        Page 42 of 58 
 
 
5.5.4 TEST RESULTS 
EUT 
Wireless speaker  system 
Mode Number 
JBL VOYAGER 
Test date 
2013-08-08 
Voltage Supply 
AC 230V/50Hz 
Test Engineer 
Bruce 
environment 
Tem:21℃ Hum:54 %101kPa 
Test mode: 
1. Test the EUT in mode 1:
 AUDIOIN 
(adapter) 
2. Test the EUT in mode 2: 
BT 
(adapter) 
3. Test the EUT in mode 3:
 BT 
(battery) 
4. Test the EUT in mode 4:Standby 
 
Test Point 
Polarity 
Test Level 
(kV) 
Required Passing 
Performance 
Actual 
performance 
Result 
L–N 
+/- 
Criterion B 
Criterion A* 
PASS 
A*EUT is working on intended use operation, no abnormal phenomenon was observed. 
 
Report No.:  EM201300534-2                Application No.:  ZJ00032799                        Page 43 of 58 
 
 
5.6 SURGE IMMUNITY TEST 
5.6.1 TEST SPECIFICATION 
Basic Standard:  
EN 61000-4-5:2006 
Wave-Shape: 
CW 1.2μs/50μs 
Test Voltage: 
Line to line 0.5kV; line to PE 1kV 
Generator Source Impedance: 
Line to line 2ohm; line to PE 12ohm 
Polarity: 
Positive and Negative 
Phase Angle: 
0°, 90°, 180°, 270° 
Pulse Repetition Rate: 
60s 
Number of Tests: 
5 times 
5.6.2 TEST PROCEDURE  
a)  For EUT power supply: 
The surge is applied to the EUT power supply terminals via the capacitive coupling network. Decoupling 
networks are required in order to avoid possible adverse effects on equipment not under test that may be 
powered by the same lines, and to provide sufficient decoupling impedance to the surge wave. The power 
cord between the EUT and the coupling/decoupling networks was shorter than 2 meters in length. 
b)  For test applied to unshielded un-symmetrically operated interconnection lines of EUT: The surge was 
applied to the lines via the capacitive coupling. The coupling / decoupling networks didn’t influence the 
specified functional conditions of the EUT. The interconnection line between the EUT and the 
coupling/decoupling networks was shorter than 2 meters in length. 
c) For test applied to unshielded symmetrically operated interconnection / telecommunication lines of 
EUT:The surge was applied to the lines via gas arrestors coupling. Test levels below the ignition point of 
the coupling arrestor were not specified. The interconnection line between the EUT and the 
coupling/decoupling networks was shorter than 2 meters in length. 
5.6.3 TEST SETUP 
 
Report No.:  EM201300534-2                Application No.:  ZJ00032799                        Page 44 of 58 
 
 
5.6.4 TEST RESULTS 
EUT 
Wireless speaker  system 
Mode Number 
JBL VOYAGER 
Test date 
2013-08-08 
Voltage Supply 
AC 230V/50Hz 
Test Engineer 
Bruce 
environment 
Tem:21℃ Hum:54 %101kPa 
Test mode: 
1. Test the EUT in mode 1:
 AUDIOIN 
(adapter) 
2. Test the EUT in mode 2: 
BT 
(adapter) 
3. Test the EUT in mode3:
 BT 
(battery) 
4. Test the EUT in mode 4:Standby 
 
Test Point   Polarity
Test 
Level 
(kV) 
Phase
Performance
Criterion 
Actual 
performance 
Result 
(P/F) 
L - N 
+/- 1 0°  B 
A
*
 PASS 
+/- 1 90°  B 
A
*
 
PASS 
+/- 1 
180° B 
A
*
 
PASS 
+/- 1 
270° B 
A
*
 
PASS 
B*EUT is working and it has some noise and the volume is descended. It can recover after test. 
Page of 58
Display

Click on the first or last page to see other VOYAGER (serv.man2) service manuals if exist.