DOWNLOAD JBL DUET 200 (serv.man3) Service Manual ↓ Size: 424.93 KB | Pages: 62 in PDF or view online for FREE

Model
DUET 200 (serv.man3)
Pages
62
Size
424.93 KB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
duet-200-sm3.pdf
Date

JBL DUET 200 (serv.man3) EMC - CB Certificate ▷ View online

 
 
- Page 33 of 62 - 
 
 
 Report 
No. 111798 
 
 
IEC 60950-1:2005 / EN 60950-1:2006 
Clause 
Requirement + Test 
Result - Remark 
Verdict
 
 
TRF No. IECEN60950_1C 
 
 
A.1.3 Mounting 
of 
samples  ............................................:  
A.1.4 
Test flame (see IEC 60695-11-3) 
 
 
Flame A, B, C or D  ...............................................:  
⎯ 
A.1.5 Test 
procedure 
 
A.1.6 Compliance 
criteria 
 
 
Sample 1 burning time (s).....................................: 
 
⎯ 
 
Sample 2 burning time (s).....................................: 
 
⎯ 
 
Sample 3 burning time (s).....................................: 
 
⎯ 
A.2 
Flammability test for fire enclosures of movable equipment having a total mass not 
exceeding 18 kg, and for material and components located inside fire enclosures (see 
4.7.3.2 and 4.7.3.4) 
A.2.1 Samples, 
material .................................................:  
⎯ 
 Wall 
thickness (mm)..............................................: 
 
⎯ 
A.2.2 
Conditioning of samples; temperature (°C) ..........: 
 
A.2.3 Mounting 
of 
samples  ............................................:  
A.2.4 
Test flame (see IEC 60695-11-4) 
 
 
Flame A, B or C ....................................................: 
 
⎯ 
A.2.5 Test 
procedure 
 
A.2.6 Compliance 
criteria 
 
 
Sample 1 burning time (s).....................................: 
 
⎯ 
 
Sample 2 burning time (s).....................................: 
 
⎯ 
 
Sample 3 burning time (s).....................................: 
 
⎯ 
A.2.7 
Alternative test acc. to IEC 60695-11-5, cl. 5 and 9 
 
 
Sample 1 burning time (s).....................................: 
 
⎯ 
 
Sample 2 burning time (s).....................................: 
 
⎯ 
 
Sample 3 burning time (s).....................................: 
 
⎯ 
A.3 
Hot flaming oil test (see 4.6.2) 
 
A.3.1 
Mounting of samples  
 
A.3.2 
Test procedure  
 
A.3.3 Compliance 
criterion 
 
 
 
 
- Page 34 of 62 - 
 
 
 Report 
No. 111798 
 
 
IEC 60950-1:2005 / EN 60950-1:2006 
Clause 
Requirement + Test 
Result - Remark 
Verdict
 
 
TRF No. IECEN60950_1C 
 
 
B 
ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2 and 
5.3.2) 
⎯ 
B.1 General 
requirements 
 
 Position 
.................................................................: 
 
⎯ 
 Manufacturer ........................................................: 
 
⎯ 
 Type 
.....................................................................: 
 
⎯ 
 Rated 
values   .......................................................: 
 
⎯ 
B.2 Test 
conditions 
 
B.3 Maximum 
temperatures 
 
B.4 
Running overload test 
 
B.5 
Locked-rotor overload test 
 
 Test 
duration 
(days) .............................................: 
 
⎯ 
 
Electric strength test: test voltage (V)  ..................: 
 
⎯ 
B.6 
Running overload test for d.c. motors in secondary 
circuits 
 N 
B.6.1 General 
 
B.6.2 Test 
procedure 
 
B.6.3 
Alternative test procedure 
 
B.6.4 
Electric strength test; test voltage (V) ..................: 
 
B.7 
Locked-rotor overload test for d.c. motors in secondary
circuits 
 N 
B.7.1 General 
 
B.7.2 
Test procedure  
 
B.7.3 
Alternative test procedure 
 
B.7.4 
Electric strength test; test voltage (V) ................. :  
 
B.8 
Test for motors with capacitors 
 
B.9 
Test for three-phase motors 
 
B.10 
Test for series motors 
 
 Operating 
voltage (V)  ...........................................:  
⎯ 
 
ANNEX C, TRANSFORMERS (see 1.5.4 and 5.3.3) 
 Position 
.................................................................: 
 
⎯ 
 
 
- Page 35 of 62 - 
 
 
 Report 
No. 111798 
 
 
IEC 60950-1:2005 / EN 60950-1:2006 
Clause 
Requirement + Test 
Result - Remark 
Verdict
 
 
TRF No. IECEN60950_1C 
 
 
 Manufacturer ........................................................: 
 
⎯ 
 Type 
.....................................................................: 
 
⎯ 
 Rated 
values   .......................................................: 
 
⎯ 
 
Method of protection............................................. :  
⎯ 
C.1 Overload 
test 
 
C.2 Insulation 
 
 
Protection from displacement of windings ............: 
 
 
ANNEX D, MEASURING INSTRUMENTS FOR TOUCH-CURRENT TESTS 
(see 5.1.4) 
⎯ 
D.1 Measuring 
instrument 
 
D.2 
Alternative measuring instrument 
 
 
ANNEX E, TEMPERATURE RISE OF A WINDING (see 1.4.13) 
 
ANNEX F, MEASUREMENT OF CLEARANCES AND CREEPAGE DISTANCES 
(see 2.10 and Annex G) 
ANNEX G, ALTERNATIVE METHOD FOR DETERMINING MINIMUM CLEARANCES 
G.1 Clearances 
 
G.1.1 General 
 
G.1.2 
Summary of the procedure for determining minimum 
clearances 
 N 
G.2 
Determination of mains transient voltage (V)  
 
G.2.1 AC 
mains 
supply ...................................................:  
G.2.2 
Earthed d.c. mains supplies .................................: 
 
G.2.3 
Unearthed d.c. mains supplies .............................: 
 
G.2.4 Battery 
operation ..................................................: 
 
G.3 
Determination of telecommunication network transient 
voltage (V) ............................................................: 
 N 
G.4 
Determination of required withstand voltage (V) 
 
G.4.1 
Mains transients and internal repetitive peaks  .....: 
 
G.4.2 
Transients from telecommunication networks ......: 
 
 
 
- Page 36 of 62 - 
 
 
 Report 
No. 111798 
 
 
IEC 60950-1:2005 / EN 60950-1:2006 
Clause 
Requirement + Test 
Result - Remark 
Verdict
 
 
TRF No. IECEN60950_1C 
 
 
G.4.3 
Combination of transients 
 
G.4.4 
Transients from cable distribution systems 
 
G.5 
Measurement of transient voltages (V) 
 
 
a) Transients from a mains supply 
 
 
For an a.c. mains supply 
 
 
For a d.c. mains supply 
 
 
b) Transients from a telecommunication network 
 
G.6 
Determination of minimum clearances .................: 
 
 
ANNEX H, IONIZING RADIATION (see 4.3.13) 
 
 
ANNEX J, TABLE OF ELECTROCHEMICAL POTENTIALS (see 2.6.5.6) 
 Metal(s) 
used 
........................................................: Considered. 
⎯ 
 
 
 
 
 
ANNEX K, THERMAL CONTROLS (see 1.5.3 and 5.3.8) 
K.1 
Making and breaking capacity 
No thermal control. 
K.2  
Thermostat reliability; operating voltage (V)  ........: 
 
K.3 
Thermostat endurance test; operating voltage (V)   
:  
K.4 
Temperature limiter endurance; operating voltage (V) 
...............................................................................: 
 N 
K.5 
Thermal cut-out reliability 
 
K.6 
Stability of operation 
 
 
ANNEX L, NORMAL LOAD CONDITIONS FOR SOME TYPES OF ELECTRICAL 
BUSINESS EQUIPMENT (see 1.2.2.1 and 4.5.2) 
L.1  
Typewriters 
Not used. 
L.2 
Adding machines and cash registers 
 
L.3 Erasers 
 
L.4 Pencil 
sharpeners 
 
L.5 
Duplicators and copy machines 
 
Page of 62
Display

Click on the first or last page to see other DUET 200 (serv.man3) service manuals if exist.