DOWNLOAD Sony HDR-CX720V / HDR-CX730E / HDR-CX740E / HDR-CX740VE / HDR-CX760E / HDR-CX760V / HDR-PJ710 / HDR-PJ710V / HDR-PJ710VE / HDR-PJ720E / HDR-PJ740VE / HDR-PJ760 / HDR-PJ760E / HDR-PJ760V / HDR-PJ760VE (serv.man4) Service Manual ↓ Size: 7.97 MB | Pages: 12 in PDF or view online for FREE

Model
HDR-CX720V HDR-CX730E HDR-CX740E HDR-CX740VE HDR-CX760E HDR-CX760V HDR-PJ710 HDR-PJ710V HDR-PJ710VE HDR-PJ720E HDR-PJ740VE HDR-PJ760 HDR-PJ760E HDR-PJ760V HDR-PJ760VE (serv.man4)
Pages
12
Size
7.97 MB
Type
PDF
Document
Service Manual
Brand
Device
Movie / LEVEL 2 SUPPLEMENT-1
File
hdr-cx720v-hdr-cx730e-hdr-cx740e-hdr-cx740ve-hdr-c.pdf
Date

Sony HDR-CX720V / HDR-CX730E / HDR-CX740E / HDR-CX740VE / HDR-CX760E / HDR-CX760V / HDR-PJ710 / HDR-PJ710V / HDR-PJ710VE / HDR-PJ720E / HDR-PJ740VE / HDR-PJ760 / HDR-PJ760E / HDR-PJ760V / HDR-PJ760VE (serv.man4) Service Manual ▷ View online

– 5 –
HDR-CX720V/CX730E/CX740E/CX740VE/CX760E/CX760V/PJ710/PJ710V/PJ710VE/PJ720E/PJ740VE/PJ760/PJ760E/PJ760V/PJ760VE_L2
LF-153 Flexible Board
Connector
(7)
Connect the connector of the LF-153 Flexible Board and stick 
the Adhesive Part of the Flexible Board.
When sticking the LF-153 Flexible Board, position it at 
the two boss holes and stick the Flexible Board.
Adhesive Part
Bosses
TO
P
FR
ONT
If the adhesive force is lowered, cut the Adhesive Sheet as 
shown in the figure in the frame and then stick it.
Shape and sticking position 
of Adhesive Sheet
Boss positions
Adhesive
Sheets
Screw (A)
Screw (B)
Screw (B)
Screw
Screw
Screw
Plate of the Motor A
(8) Set the Motor A to the state shown in the figure, position it 
with the two bosses, and then secure it with three screws 
while turning the Plate of the Motor A.
Screw (A)
Tightening torque = 0.12 ± 0.01N · m (1.2 ± 0.1kg f · cm)
Screw (B)
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Motor A
Motor A
Cutout
Cutout
Bosses
TO
P
FRONT
Bosses
1
3
4
2
2
1
3
Screw
Screw
Screw
Sheet Metal (B)
(9) Install the Sheet Metal (B), Edge of Mechanical Rubber 
while positioning it with the two bosses and tighten three screws 
in the order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Flexible Board of the Motor A
(10) Stick the Adhesive Part of the Flexible Board of the Motor A.
Flexible Board of the Motor A
Adhesive Sheet
Screw
Screw
Screw
Screw
Frame (E-Sub-A),
Frame (E-Sub-B),
Ball Bearing
Shaft
Bosses
Bosses
(11) While attaching the four bosses and the shaft, install the Frame 
(E-Sub-A), Frame (E-Sub-B), and Ball Bearing, and then tighten 
four screws in the order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Adhesive Part
Sheet Metal (B),
Edge of Mechanical Rubber
TOP
TOP
FR
ONT
FRONT
FRO
NT
If the adhesive force is lowered, cut the Adhesive Sheet 
as shown in the figure in the frame and then stick it.
Shape and sticking position 
of Adhesive Sheet
Bosses
TO
P
1
2
3
Screw
Screw
Screw
Plate of the Motor B
Screws
Motor B
(12) Set the Motor B to the state shown in the figure, position it 
with the two bosses and install it, and then tighten three screws 
while turning the Plate of the Motor B.
Tightening torque =  0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Motor B
Cutout
Cutout
Bosses
TO
P
FRONT
– ENGLISH –
– 6 –
HDR-CX720V/CX730E/CX740E/CX740VE/CX760E/CX760V/PJ710/PJ710V/PJ710VE/PJ720E/PJ740VE/PJ760/PJ760E/PJ760V/PJ760VE_L2
1
5
6
1
2
3
4
2
Screw
Screw
Frame (F-Sub-A),
Frame (F-Sub-B),
Ball Bearing
Shaft
Hole
LF-153
Flexible
Board
Bosses
(13)
(14)
While attaching the two bosses and the shaft and passing the 
LF-153 Flexible Board through the hole, install the Frame 
(F-Sub-A), Frame (F-Sub-B), and Ball Bearing, and then tighten 
two screws in the order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Adhesive Part
LF-153 Flexible Board
LF-153 Flexible Board
While positioning the Adhesive Parts of the LF-153 Flexible Board  
with he two bosses, stick the Adhesive Part.
Bosses
Screw
Screw
Screw
Screw
Screw
Screw
Bosses
Bosses
(15) While attaching the four bosses, install the Sheet Metal (C) ,
Edge of Mechanical Rubber and then tighten six screws in the 
order shown in the figure below.
Tightening torque = 0.18 ± 0.01N · m (1.8 ± 0.1kg f · cm)
Sheet Metal (C),
Edge of Mechanical Rubber
TO
P
TO
P
FR
ONT
FRONT
Adhesive
Sheet
Shape and sticking position 
of Adhesive Sheet
Sheet Metal (C)
Adhesive Part
LF-148 Flexible Board
Redundant part of LF-148 
Flexible Board
Sheet Metal (C)
LF-148 Flexible Board
(16) Stick the LF-148 Flexible Board to the Sheet Metal (C).
If the adhesive force is lowered, cut the Adhesive Sheet 
as shown in the figure in the frame and then stick it.
Put the redundant part of the LF-148 Flexible Board 
inside the Sheet Metal (C).
Adhesive
Sheets
TO
P
FRONT
Shape and sticking position 
of Adhesive Sheet
Handling redundant part of 
LF-148 Flexible Board
Sheet Metal (C)
Adhesive
Parts
Connectors
Flexible Board
of the Motor A
Flexible Board
of the Motor A
Flexible Board
of the Motor A
(17) Stick the Flexible Board of the Motor A to the Sheet Metal (C) 
and connect the two connectors.
If the adhesive force is lowered, cut the Adhesive Sheet as 
shown in the figure in the frame and then stick it.
Adhesive
Sheets
Stick the Flexible Board of the Motor A from the center of 
the Flexible Board to its both ends.
TO
P
FRONT
Shape and sticking position of 
Adhesive Sheet
Flexible Board sticking direction
– ENGLISH –
– 7 –
HDR-CX720V/CX730E/CX740E/CX740VE/CX760E/CX760V/PJ710/PJ710V/PJ710VE/PJ720E/PJ740VE/PJ760/PJ760E/PJ760V/PJ760VE_L2
外し方
(1)
コネクター2箇所を外し,モーターAのフレキシブル
基板とLF-148フレキシブル基板の接着部を剥がす。
コネクター
モーターAの
フレキシブル基板
LF-148
フレキシブル基板
接着部
接着部
TO
P
FRO
NT
(2)
ねじ6本を外し,ボス4箇所を外しながら板金(C),
メカ端ゴムを取り外す。
LF-153フレキシブル基板
接着部
(3)
LF-153フレキシブル基板の接着部を剥がす。
TO
P
TO
P
FRO
NT
FRON
T
ボス
ボス
ねじ
ねじ
ねじ
ねじ
ねじ
ねじ
板金 (C),
メカ端ゴム
(4)
ねじ2本を外し,ボス2箇所と軸1箇所を外しながら,
枠(F-Sub-A), 枠(F-Sub-B), ボールベアリングを取り外す。
(5)
ねじ1本を外し,モーターBの板を回転させてねじ2本を外し,
モーターBを取り外す。
TO
P
FR
ONT
TO
P
FRONT
枠 (F-Sub-A),
枠 (F-Sub-B),
ボールベアリング
モーターB
モーターB
の板
ねじ
ねじ
ねじ
ねじ
ボス
ねじ
ねじ
サービスノート
前飾りの交換方法
新品のサービス用レンズブロックには保護用の
レンズキャップが取り付いています。
作業中はこのレンズキャップを取り付けた状態
で作業を行なってください。
レンズキャップ
Note:
– JAPANESE –
(7)
モーターAのフレキシブル基板の接着部を剥がす。
(6)
ねじ4本を外し,ボス4箇所と軸1箇所を外しながら,
枠(E-Sub-A), 枠(E-Sub-B), ボールベアリングを
取り外す。
(8)
ねじ3本を外し,板金(B),メカ端ゴムを取り外す。
TO
P
TO
P
FRONT
FRONT
FRONT
モーターAの
フレキシブル基板
接着部
板金 (B),
メカ端ゴム
ねじ
ねじ
ボス
ボス
ねじ
ねじ
ねじ
ねじ
枠 (E-Sub-A),
枠 (E-Sub-B),
ボールベアリング
TO
P
– 8 –
HDR-CX720V/CX730E/CX740E/CX740VE/CX760E/CX760V/PJ710/PJ710V/PJ710VE/PJ720E/PJ740VE/PJ760/PJ760E/PJ760V/PJ760VE_L2
(9) モーターAの板を回転させながら,ねじ3本を外し,
モーターAを取り外す。
TO
P
FRO
NT
ねじ
ねじ
ねじ
ねじ
ねじ
ねじ
モーターAの板
モーターA
(10)
LF-153フレキシブル基板の接着部を剥がし,
コネクター1箇所を外してLF-153フレキシブル基板
を取り外す。
(11)
CM輻射シートを剥がし,LF-148フレキシブル基板
の接着部を剥がす。
(12)
ポリイミドシート2枚を剥がし,ねじ4本を外す。
TO
P
TO
P
TO
P
FRO
NT
FRO
NT
FRON
T
ポリイミドシート
ポリイミドシート
ねじ
ねじ
ねじ
ねじ
LF-148
フレキシブル基板
LF-153
フレキシブル基板
接着部
接着部
CM
輻射シート
コネクター
(13)
(14)
ねじ1本を外し,ボス5箇所とコネクター1箇所を外し,
板金(D-Sub),LF-148フレキシブル基板を取り外す。
ボンドを剥がす。
(15) ねじ1本を外し,板金(A)を取り外す。
TO
P
FRONT
TO
P
FRO
NT
TO
P
FR
ONT
板金 (A)
ボンド
ボス
ボス
ねじ
ねじ
ボス
ボス
コネクター
LF-148 フレキシブル基板,
板金 (D-Sub)
– JAPANESE –
(16) ボス1箇所とツメ1箇所を外し,前飾りを取り外す。
TO
P
FRONT
ボス
ツメ
前飾り
Page of 12
Display

Click on the first or last page to see other HDR-CX720V / HDR-CX730E / HDR-CX740E / HDR-CX740VE / HDR-CX760E / HDR-CX760V / HDR-PJ710 / HDR-PJ710V / HDR-PJ710VE / HDR-PJ720E / HDR-PJ740VE / HDR-PJ760 / HDR-PJ760E / HDR-PJ760V / HDR-PJ760VE (serv.man4) service manuals if exist.