4-11
SAL1650 (DT 16-50 / F2.8) (DT 16-50mm F2.8 SSM)
<For reference 1: shooting image by AE master lens> (Fig. 4-6-4)
• Assume it standard image in the setting environment.
• If the peak of image-formation is to equal distance with AF assist chart position, it is ideal. In actual fact, the image of before and
• Assume it standard image in the setting environment.
• If the peak of image-formation is to equal distance with AF assist chart position, it is ideal. In actual fact, the image of before and
behind the peak is displayed. (Because the environment, the individual difference of camera and lens conditions are combined.)
• The image of before and behind the peak, assume it reference standard image.
• When shooting the image with sharpness setting of the camera to + side, it is easy to distinguish the peak of imaging area remarkably.
• When shooting the image with sharpness setting of the camera to + side, it is easy to distinguish the peak of imaging area remarkably.
Enlargement of same pixel magnification
Example of image shot with
a certain AE master lens under
a certain environment.
a certain AE master lens under
a certain environment.
Identifying the peak position of
image-formation:
• Center of sharpest area
• Center of area with less color fogged
- Front defocus area: Magenta fogged
- Rear defocus area: Green fogged
image-formation:
• Center of sharpest area
• Center of area with less color fogged
- Front defocus area: Magenta fogged
- Rear defocus area: Green fogged
Example where peak position accidentally matches
the AF Assist Chart position
the AF Assist Chart position
Fig.
4-6-4
<For reference 2: The example of focusing error amount value check> (Fig. 4-6-5)
Check the displacement between the focus position (peak of image-formation) of the lens to be tested and the focus position (peak of im-
age-formation) of the AE master lens.
Check the displacement between the focus position (peak of image-formation) of the lens to be tested and the focus position (peak of im-
age-formation) of the AE master lens.
Example of image shot with lens to be tested (50 mm F1.4)
Example of image shot with AE master lens
Peak area
(existing around 7 to 8 cm
of the rear scale)
(existing around 7 to 8 cm
of the rear scale)
Peak area
(existing around 6 to 7 cm
of the front scale)
(existing around 6 to 7 cm
of the front scale)
Error amount = approx. 14 cm
Fig.
4-6-5
Example of decision:
The lens to be tested has a tendency of backward defocusing compared to the AE master lens. The error amount is approx. 14 cm.
Compare this error amount with the reference value and check whether the error amount is within the acceptable range.
If the error amount is outside the acceptable range, perform 4-9-3. Focusing Error Amount Adjustment (Write
The lens to be tested has a tendency of backward defocusing compared to the AE master lens. The error amount is approx. 14 cm.
Compare this error amount with the reference value and check whether the error amount is within the acceptable range.
If the error amount is outside the acceptable range, perform 4-9-3. Focusing Error Amount Adjustment (Write
⊿
SB) .
4-12
SAL1650 (DT 16-50 / F2.8) (DT 16-50mm F2.8 SSM)
4-7. INSTALLATION OF LENS ADJUSTMENT PROGRAM
4-7-1. Installing the Lens Adjustment Program (ActuatorCheckerSSM)
Equipment used
• Personal Computer
• Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
• Finished Inspection JIG II (AC 100 - 240 V)
• Half Completion JIG
• Personal Computer
• Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
• Finished Inspection JIG II (AC 100 - 240 V)
• Half Completion JIG
Note 1:
Personal computer must have the condition that Windows Vista/7 runs normally and USB is connectable.
Note 2:
Acquire the Lens Adjustment Program (ACSSM-S-VerX.XX.zip) from the each HQ.
Note 3:
Please make the Half Completion JIG in each service station.
For details of the jig making method, refer to Note 6 of 4-1-1. List of Service Tools and Equipment .
1. Saving Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
1) Unzip the Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
2) Save ACSSM-S-VerX.XX.exe in an arbitrary folder.
1) Unzip the Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
2) Save ACSSM-S-VerX.XX.exe in an arbitrary folder.
Note:
The version of ACSSM-S-VerX.XX.exe might be updated.
4-7-2. Connection of Finished Inspection JIGⅡ/Half Completion JIG and Startup of Lens Adjustment Pro-
gram (ActuatorCheckerSSM)
Note 1:
Confirm that 4-7-1. Installing the Lens Adjustment Program (ActuatorCheckerSSM) has been completed before this procedure is executed.
Note 2:
In case of performing Finished inspection, be sure to perform in the condition that the lens is laid down (do not perform in the lens standing con-
dition).
Equipment
• Personal Computer
• Finished Inspection JIG II (AC 100 - 240 V)
• Personal Computer
• Finished Inspection JIG II (AC 100 - 240 V)
Note:
The cables and so on are not supplied as accessories.
• Half Completion JIG
• AC Cable (Sold on the Market)
• RS232C Cable (D-Sub 9 Pins (Male with Securing Screws), D-Sub 9 Pins (Female with Securing Screws)) Straight Type (Sold on the
• AC Cable (Sold on the Market)
• RS232C Cable (D-Sub 9 Pins (Male with Securing Screws), D-Sub 9 Pins (Female with Securing Screws)) Straight Type (Sold on the
Market)
• USB to Serial Cable (D-Sub 9 Pins (Male)) (Sold on the Market)
• M-BOX-JIG (J-6082-722-A) (Or the Jig supplied with Finished Inspection JIG (J-6082-645-A))
• Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
• M-BOX-JIG (J-6082-722-A) (Or the Jig supplied with Finished Inspection JIG (J-6082-645-A))
• Lens Adjustment Program (ACSSM-S-VerX.XX.zip)
1. Connection
Connect equipment and checking lens as shown in Fig. 4-7-1 or 4-7-2.
Note:
Note:
ActuatorCheckerSSM cannot start up without the connection to the finished inspection JIG II.
• Final
Finished Inspection JIG II
AC Cable
D-sub 9 Pins: Male
D-sub 9 Pins: Female
RS232C Cable
USB to Serial Cable
Lens
Fig.
4-7-1
• Half
1. The Half completion JIG is installed on the Cab lens with two screws.
2. Connect, Encoder flexible, MR flexible, and SSM flexible. (It is no need to connect SW flexible board.)
2. Connect, Encoder flexible, MR flexible, and SSM flexible. (It is no need to connect SW flexible board.)
Finished Inspection JIG
MR Flexible
Board
Board
Potentiometer
Flexible Board
Flexible Board
SSM Flexible
Board
Board
Encoder Flexible
Board
Board
Half Completion JIG
Fig.
4-7-2
4-13
SAL1650 (DT 16-50 / F2.8) (DT 16-50mm F2.8 SSM)
2. Startup of Lens Adjustment Program (ActuatorCheckerSSM)
1) Turn on the personal computer and the finished inspection JIG II.
2) Start up ACSSM-S-VerX.XX.exe from an arbitrary folder.
1) Turn on the personal computer and the finished inspection JIG II.
2) Start up ACSSM-S-VerX.XX.exe from an arbitrary folder.
Note:
• At the first time using, the followings appear on the screen (Fig. 4-7-3).
• At the first time using, the followings appear on the screen (Fig. 4-7-3).
It is required to ask HQ about the password for the Com/User Characteristic Number and the manufacturer/type name of the personal
computer.
Ex. Com/User Characteristic Number : iYdDZfq9q
computer.
Ex. Com/User Characteristic Number : iYdDZfq9q
Personal Computer :
SONY PCV-RZ33P
• It is no need to input password to the computer once registered.
(The screen requires password does not appear.)
• If the personal computer or the finished inspection JIG II is changed, the password and the Com/User Characteristic Number are
changed. Therefore on the startup, the password input is required again.
3) Input the password and click [OK[Ent]], the following appears on the screen (Fig. 4-7-4).
Fig. 4-7-3
Fig. 4-7-4
4-7-3. Initial Setting of Lens Adjustment Program (ActuatorCheckerSSM)
1. Start
up ACSSM-S-VerX.XX.exe .
Fig.
4-7-5
2. When the Japanese window appears, click the [Setup] button, change the language to English.
Note:
Depending on the initial startup or setting made at the previous startup, the window differs.
3. Set the following contents in the SETUP window.
MODEL
Model to be adjustment in this time
Language English
State
Final or Half
Table
4-7-1
4. Confirm that all of the items are set, and click [Save].
Fig.
4-7-6
5. Click the [Finish] to close the SETUP window.
4-7-4. About Inspection Procedure of Lens Adjustment Program (ActuatorCheckerSSM)
The inspection method has the method of executing the method of inspecting the corresponding model as everything continues and the in-
spection of each item one by one.
Click [START] from the start up window when you inspect the corresponding model as everything continues.
Click the inspection of each item from the start up window, when you inspect one by one.
spection of each item one by one.
Click [START] from the start up window when you inspect the corresponding model as everything continues.
Click the inspection of each item from the start up window, when you inspect one by one.
4-8. HALF COMPLETION ADJUSTMENT/INSPECTION (ACTUATORCHECKERSSM)
Equipment (Only the specific equipment is listed.)
Half Completion JIG
Half Completion JIG
Note:
Please make the Half Completion JIG in each service station.
For how to create a half completion JIG, refer to 4-1-1. List of Service Tools and Equipment .
4-8-1. Preparation
1. Connect the equipment to the checking lens. (Refer to 4-7-2. Connection of Finished Inspection JIG II/Half Completion JIG and Start-
up of Lens Adjustment Program (ActuatorCheckerSSM) .)
2. Start up the lens adjustment program (ActuatorChecker).
3. Click the setting and set the initial setting. (Refer to 4-7-3. Initial Setting of Lens Adjustment Program (ActuatorCheckerSSM) .)
3. Click the setting and set the initial setting. (Refer to 4-7-3. Initial Setting of Lens Adjustment Program (ActuatorCheckerSSM) .)
Note:
When the Multi Serial window opens, take the following actions.
Process No. You need not enter process number.
Serial No.
When the mount block assy is replaced, enter a serial number.
Fig.
4-8-1
4-14
SAL1650 (DT 16-50 / F2.8) (DT 16-50mm F2.8 SSM)
4-8-2. Half Completion Adjustment/Inspection Item
Perform Half Completion Adjustment/Inspection items in the order as shown below.
1. Adjustment/Inspection Method
1) Click
1) Click
[Start.[Ent]].
2) Follow the instruction on the menu.
2. Adjustment/Inspection Item
1) Check Focus Pattern (Motor)
2) Adjust & Check MR
3) Adjust Driving Frequency & Gain
4) Focus Load Inspection (FB is included)
5) Focus Drive Inspection
1) Check Focus Pattern (Motor)
2) Adjust & Check MR
3) Adjust Driving Frequency & Gain
4) Focus Load Inspection (FB is included)
5) Focus Drive Inspection
Fig.
4-8-2
6) Check Sound
7) Search Focus-Adj
7) Search Focus-Adj
Note 1:
This item is not adjusted automatically in case of starting Adjustment/
Inspection with clicking [Start[Ent]].
4-8-3. Focus Brush Position Check/Adjustment
Equipment (Only the specific equipment is listed.)
• Adhesive Bond (B-10)
• Adhesive Bond (B-10)
1. Preparation
1) Disassemble or assemble the checking lens and make it in the state shown in Fig. 4-8-3.
1) Disassemble or assemble the checking lens and make it in the state shown in Fig. 4-8-3.
Zoom Rubber
Zoom Coma Cover
Zoom Ring Assy
Fig.
4-8-3
2) Set the focus at
∞
(infinity) end.
2. Checking Procedure
1) Perform
1) Perform
the Focus-adjustment-end search .
2) If the checking result is abnormal, perform the following 3. Adjustment Procedure .
3. Adjustment Method
1) Loosen 2 screws fixing the focus brush.
2) Adjust the focus brush position as shown in the figure and fix it with screws.
1) Loosen 2 screws fixing the focus brush.
2) Adjust the focus brush position as shown in the figure and fix it with screws.
Note:
Adjust the position so that the cut-out A of trace on the flexible board aligns with the contact portion B of focus brush.
3) Check the conduction between 2nd trace and 3rd trace from top with meter as shown in the figure.
• When the brush locates on the cut-out A of trace, the traces are not conducted. (Adjustment: OK)
• When the brush does not locate on the cut-out A of trace, the traces are conducted. (Adjustment: NG)
• When the brush does not locate on the cut-out A of trace, the traces are conducted. (Adjustment: NG)
Focus Brush
Confirm the
conduction
conduction
A
Apply the bond
(B-10)
(B-10)
Fig.
4-8-4
4) Confirm the focus brush position by rotating the focus again from
∞
(infinity) end to NEAR end and from NEAR end to
∞
(infinity).
5) After finishing the adjustment, apply bond (B-10) to the heads of screws.
4-8-4. Adjust & Check MR
Equipment (Only the specific equipment is listed.)
・
Adhesive Bond (B-10)
1. Preparation
1) Set the lens to the state of Fig. 4-7-2 in 4-7-2. Connection of Finished Inspection JIG
1) Set the lens to the state of Fig. 4-7-2 in 4-7-2. Connection of Finished Inspection JIG
Ⅱ
/ Half Completion JIG and Startup of Lens Ad-
justment Program (ActuatorCheckerSSM) .
2. Check Method
1) Click Adjust & Check MR.
2) The processing proceeds to Adjust & Check MR. Enter the upper three digits of the value printed on the flexible board of the ultrasonic
1) Click Adjust & Check MR.
2) The processing proceeds to Adjust & Check MR. Enter the upper three digits of the value printed on the flexible board of the ultrasonic
motor (stator).
Example: When the value is 158
Ultrasonic motor frequency: 158