Sharp AR-235 (serv.man2) Handy Guide ▷ View online
AR-235/275
Technical Information Pack
Document Systems Support
25
14. PWB Exchange Scheme
The Sharp “PWB exchange scheme” has been developed by Sharp Electronics (UK)
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
The scheme will run for the life of the machine and does not include a warranty
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
For more details of the scheme please refer to ‘PWB Exchange Scheme’ document,
found in the Policies section of the Technical Web Site.
found in the Policies section of the Technical Web Site.
15.
Training
AR235/275 Engine training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of the digital introduction or AR250-507 product
course
course
Content
This course covers the AR-235 / 275 models, including AR-VR3, AR-SP4,
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR235/275 Connectivity Training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of ARPB2 course
Content
This course covers AR-P11 printer board specification and installation,
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
AR-235/275
Technical Information Pack
Document Systems Support
25
14. PWB Exchange Scheme
The Sharp “PWB exchange scheme” has been developed by Sharp Electronics (UK)
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
The scheme will run for the life of the machine and does not include a warranty
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
For more details of the scheme please refer to ‘PWB Exchange Scheme’ document,
found in the Policies section of the Technical Web Site.
found in the Policies section of the Technical Web Site.
15.
Training
AR235/275 Engine training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of the digital introduction or AR250-507 product
course
course
Content
This course covers the AR-235 / 275 models, including AR-VR3, AR-SP4,
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR235/275 Connectivity Training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of ARPB2 course
Content
This course covers AR-P11 printer board specification and installation,
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
AR-235/275
Technical Information Pack
Document Systems Support
25
14. PWB Exchange Scheme
The Sharp “PWB exchange scheme” has been developed by Sharp Electronics (UK)
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
The scheme will run for the life of the machine and does not include a warranty
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
For more details of the scheme please refer to ‘PWB Exchange Scheme’ document,
found in the Policies section of the Technical Web Site.
found in the Policies section of the Technical Web Site.
15.
Training
AR235/275 Engine training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of the digital introduction or AR250-507 product
course
course
Content
This course covers the AR-235 / 275 models, including AR-VR3, AR-SP4,
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR235/275 Connectivity Training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of ARPB2 course
Content
This course covers AR-P11 printer board specification and installation,
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
AR-235/275
Technical Information Pack
Document Systems Support
25
14. PWB Exchange Scheme
The Sharp “PWB exchange scheme” has been developed by Sharp Electronics (UK)
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
Ltd. and T P Serviceco to offer our Authorised Resellers a fast and effective PWB
repair scheme, ensuring minimum machine downtime. The scheme also offers
Resellers a diagnostic facility, allowing more than one PWB to be ordered and thus
providing the Technician with a simple fault diagnosis.
The scheme will run for the life of the machine and does not include a warranty
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
period. PWBs covered by the scheme include IMC, MCU and PSU. Option PWBs
include AR-P11, AR-NC5J and AR-FX4.
For more details of the scheme please refer to ‘PWB Exchange Scheme’ document,
found in the Policies section of the Technical Web Site.
found in the Policies section of the Technical Web Site.
15.
Training
AR235/275 Engine training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of the digital introduction or AR250-507 product
course
course
Content
This course covers the AR-235 / 275 models, including AR-VR3, AR-SP4,
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR-RP3, AR-D11, AR-D12, AR-TR3, and AR-FN5 options. Connectivity
options AR-P11, AR-NC5J, AR-NS2 and AR-PK1 are covered on the
separate one-day Connectivity course. Explanation of new features for this
model, initial set-up procedures, Key operator function and simulation codes.
Demonstration of Flash ROM Upgrade Procedure. Disassembly / re-
assembly of the product, followed by installation of options AR-D12 (Option
Cassette), AR-RP3 (Reversing Single Pass Feeder) and AR-FN5 (Finisher).
AR235/275 Connectivity Training
Duration
1 Day
Location
Manchester / Watford
Prerequisite
Successful attendance of ARPB2 course
Content
This course covers AR-P11 printer board specification and installation,
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.
Network card specification and installation, printer driver and new features.
Troubleshooting and problem escalation.