DOWNLOAD Panasonic PT-MZ16K / PT-MZ13K / PT-MZ10K (serv.man2) Service Manual ↓ Size: 18.05 MB | Pages: 116 in PDF or view online for FREE

Model
PT-MZ16K PT-MZ13K PT-MZ10K (serv.man2)
Pages
116
Size
18.05 MB
Type
PDF
Document
Service Manual
Brand
Device
Projector / LCD PROJECTOR
File
pt-mz16k-pt-mz13k-pt-mz10k-sm2.pdf
Date

Panasonic PT-MZ16K / PT-MZ13K / PT-MZ10K (serv.man2) Service Manual ▷ View online

DIS-7
SECTION 2 DISASSEMBLY PROCEDURE
<MZ16K/MZ13K/MZ10K>
2.1. Air filter unit, Air filter cover removal
1. Loosen 1 screw-A and take the air filter cover off.
2. Unhook the hook on the edge of air filter unit, and take the air filter unit off.
A
Air filter unit
Hook
Air filter cover
2.2. Projection lens removal
1. Remove 1 lens drop protection screw-A  with ball point driver (2.0).
2. Slide the top slide cover until the installing line and take it upward off.
A
Top slide cover
A
A
Installing line
DIS-8
SECTION 2 DISASSEMBLY PROCEDURE
<MZ16K/MZ13K/MZ10K>
3. WHile holding the projection lens, pinch the lens lock lever and turn it to [Unlock] side, and then pull the projection lens off.
Projection 
lens
Lock
Unlock
Lens lock lever
How to install the projection lens
1. Check that the lens lock lever sets [Unlock] side.
2.  Match the marker (red point) on the projection lens to the  protrusion on the lens mounter, and gently insert the projection 
lens to the end.
3. While holding the projection lens, turn the lens lock lever to [Lock] side end.
4. Fix the lens with lens drop protection screw.
Protrusion on the mounter
Marker (red point) 
on the lens
When you replace the projection lens, execute the lens calibration through the manu [PROJECTOR SETUP - [LENS] - 
[LENS CALIBRATION].
DIS-9
SECTION 2 DISASSEMBLY PROCEDURE
<MZ16K/MZ13K/MZ10K>
C
C
C
C
C
C
C
C
C
C
C
B
C
A
2.3. Top cover removal
1. Loosen 1 torx screw-A and take the prism cover off.
2. Remove 2 screws-B, 12 screws-C, and take the top cover upward off.
A
B
C
Top cover
Prism cover
A
A
A
A
Terminal cover
2.4. Terminal cover removal
1.  Remove 4 screws-A and take the terminal cover backward off.
A
DIS-10
SECTION 2 DISASSEMBLY PROCEDURE
<MZ16K/MZ13K/MZ10K>
A
2.4.1. S-PCB, INFO-MONITOR removal
1.  Remove 4 screws-B and take the S-PCB off.
2.  Using the thin headed ball point driver (2.0mm diameter), insert it into the openings (2 pints) to peal the 
bottom cover from back.
3. Take the INFO-MONITOR off.
Terminal cover
S-PCB
INFO-MONITOR
Botton cover
Ball point driver
A
B
C
D
E
A
A
C
C
B
D
E
F
F
A-PCB block
Earth metal-1
Earth metal-3
Earth metal-5
Earth metal-6
Earth metal-2
INFO-MONITOR removal
2.5. A-PCB block removal
1.  Remove 3 screws-A and take the Earth metal-1 off. 
Remove 2 screws-B and take the Each metal-2 off. 
Remove 4 screws-C and take the Earth metal-5 and 6 off. 
Remove 2 screws-D, 2 screws-E and take the Earth metal-3 off.
2. Remove 2 screws-F and take the A-PCB block upward off.
Page of 116
Display

Click on the first or last page to see other PT-MZ16K / PT-MZ13K / PT-MZ10K (serv.man2) service manuals if exist.