DOWNLOAD Panasonic CF-29N3LGZBM Service Manual ↓ Size: 3.7 MB | Pages: 103 in PDF or view online for FREE

Model
CF-29N3LGZBM
Pages
103
Size
3.7 MB
Type
PDF
Document
Service Manual
Brand
Device
PC / NOTEBOOK COMPUTER
File
cf-29n3lgzbm.pdf
Date

Panasonic CF-29N3LGZBM Service Manual ▷ View online

7-27
n
 Setting the Main PCB
1. Set the Main PCB to the Top Cabinet in order.
View "C"
View "A"
View "B"
View "C"
View "A"
View "B"
Power SW Cable
Cable
Cable
Main PCB
LAN Cable
LAN Cable
Clamper
Clamper
Confirm that the tying point of the 
LAN Cable's Clamper is in the 
opposite direction to Main PCB.
Pass the Power SW Cable through 
the upper side of Cable.
Confirm that the Pin of the Top 
Cabinet of the hole of the Main PCB.
Pull out the LAN Cable
Confirm that the Pin of 
the Top Cabinet of the 
hole of the Main PCB.
Confirm that the Boss of the Top Cabinet of 
the hole of the Batt HDD CN Angle.
Pass the LAN Cable 
through this Slot.
Slot
Tying point
Main PCB
MP CN Spacer
Hole
Tip of the Screw
Tip of the Screw
Hole
Slot
Batt HDD CN Angle
1
2
Safety Working
Safety Working
Safety Working
7-28
n
 Arranging the Cables and attaching the Sheets, the Tape, the Space PWB Hold MP and the Insulation Sheet
1. Connect the five Cables to the five Connectors.
(Main PCB: CN6, CN9, CN10, CN51, CN54)
2. Attach the three Sheets, the Tape, the Space PWB Hold MP and the Insulation Sheet.
View "A"
View "B"
View "C"
View "D"
View "A"
View "B"
View "C"
View "D"
0~1mm
Connect the 
Connector CN10.
Sheet
Sheet
Sheet
IO FPC
Tape
Insulation Sheet
Insulation Sheet
Space PWB 
Hold MP
Tape
Space PWB 
Hold MP
IC
Connect the Connector CN54.
Connect the Connector CN51.
Sheet
Sheet
Cable
Cable
Connector CN51
Cable
Wireless Module Holder
0~1mm
0~1mm
1~2mm
0~1mm
3~4mm
Power SW Cable
CON Spacer
TP PCB
0.5~1.5mm
0~0.5mm
1~2mm
0~1mm
Do not put up the Cable 
on the Wireless Module 
Holder.
Attach the Sheet in condition that 
the IO FPC is slid to the side of 
the Connector CN10.
Pass the Cable through 
the right side of the 
Connector not to put up it 
on the Connector.
Safety Working
Connect the Connector CN6.
Connect the Connector CN9.
7-29
n
 Setting the RTC Battery
1. Connect the Cable to the Connector CN4 on the Main PCB.
2. Attach the RTC Battery to the Main PCB.
Connect the Connector CN4.
RTC Battery
Gasket
Main PCB
0~1mm
0~1mm
1~2mm
1~2mm
1~2mm
Safety Working
7-30
7.2.12. Setting the PAD SW FFC Cover
1. Set the Power Cable Guard. 
2. Fix the PAD SW FFC Cover using the three Screws<R>.
No1 to No3
Note:
Tighten the Screws in the numbered order (No1 to No3).
Screws <R>: DFHE5054XA
n
 Arranging the Power SW Cable
<R>
:No1
<R>
:No2
<R>
:No3
PAD SW FFC
Cover
Power Cable 
Guard
Power Cable 
Guard
Main PCB
Power SW Cable
Page of 103
Display

Click on the first or last page to see other CF-29N3LGZBM service manuals if exist.