Panasonic SR-PE55LTQ Service Manual ▷ View online
17
7.2.2 Disassemble the frame of the fi nished control baseplate
1.
Remove the fixed screw securing the sw panel
ass’y and the protective frame (one piece).
Note: PE45 is not provided with such fi xed screw.
ass’y and the protective frame (one piece).
Note: PE45 is not provided with such fi xed screw.
2.
Remove 2 fixed screws securing the sw panel
ass’y and the housing.
ass’y and the housing.
Sw panel ass'y
3.
Dismantle the sw panel ass’y from the housing.
Housing
Sw panel ass'y
IP4749_SR_PE45_PE55_Eng_07_140314.indd 17
IP4749_SR_PE45_PE55_Eng_07_140314.indd 17
2014-3-14 9:12:40
2014-3-14 9:12:40
18
7.2.3 Disassemble the micro switch
1.
Remove the stop screw of the micro switch (one
piece) and disassemble the micro switch.
piece) and disassemble the micro switch.
Micro switch
7.2.4 Disassemble the thermost ass’y
1. Remove all the leads connected to the thermost
ass’y.
Thermost ass'y
Heater terminal
2.
As shown in the right diagram, extend the claws
(three) straight and take off the thermost ass’y.
Heater terminal
IP4749_SR_PE45_PE55_Eng_07_140314.indd 18
IP4749_SR_PE45_PE55_Eng_07_140314.indd 18
2014-3-14 9:12:40
2014-3-14 9:12:40
19
7.2.5 Disassemble the cast heater ass’y
1.
Remove the fi xed screws of the cast heater ass’y
from the bottom of the protective frame, which is
near the control baseplate.
from the bottom of the protective frame, which is
near the control baseplate.
2.
Retain the self-tapping screws near the binding
post of the heater.
post of the heater.
Housing
Do not remove
the screws
the screws
3.
Roll the cast heater ass’y out of the lock catch and
remove it from the protective frame.
remove it from the protective frame.
Heater
terminal
terminal
Cast heater ass'y
Screw
7.2.6 Assembly
1. Conduct the assembly as per the disassembly steps in a reversed way.
IP4749_SR_PE45_PE55_Eng_07_140314.indd 19
IP4749_SR_PE45_PE55_Eng_07_140314.indd 19
2014-3-14 9:12:40
2014-3-14 9:12:40
20
8. Wiring
Diagram
8.1 Actual Wiring Diagram (China)
Thermost
ass'y
ass'y
Cast
heater
ass'y
heater
ass'y
Control Unit A
(operation)
(operation)
Control Unit B
(power supply)
(power supply)
Body earth lead
Wlre ass'y
Wlre ass'y
Peg frame comp
Power line
Micro switch
IP4749_SR_PE45_PE55_Eng_07_140314.indd 20
IP4749_SR_PE45_PE55_Eng_07_140314.indd 20
2014-3-14 9:12:40
2014-3-14 9:12:40
Click on the first or last page to see other SR-PE55LTQ service manuals if exist.