DOWNLOAD Panasonic CS-G95KE / CS-G125KE / CU-G95KE / CU-G125KE Service Manual ↓ Size: 14.78 MB | Pages: 113 in PDF or view online for FREE

Model
CS-G95KE CS-G125KE CU-G95KE CU-G125KE
Pages
113
Size
14.78 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner / SPLIT TYPE
File
cs-g95ke-cs-g125ke-cu-g95ke-cu-g125ke.pdf
Date

Panasonic CS-G95KE / CS-G125KE / CU-G95KE / CU-G125KE Service Manual ▷ View online

10.2.5. CONNECT THE CABLE TO THE
INDOOR UNIT
 1. The inside and outside connecting cable can be connected
without removing the front grille.
 2. Connecting cable between indoor unit and outdoor unit
shall be approved polychloroprene sheathed 4 × 1.5 mm
2
flexible cord, type designation H05 RN-F or heavier cord.
  • 
Ensure the color of wires of outdoor unit and the
terminal Nos. are the same to the Indoor’s respectively.
  • 
Earth lead wire shall be longer than the other lead wires
as shown in the figure for the electrical safety in case of
the slipping out of the cord from the anchorage.
  • 
Secure the cable onto the control board with the holder
(clamper).
INSTALLATION OF AIR PURIFYING FILTERS
 1. Open the front panel.
 2. Remove the air filters.
 3. Hold the purifying filters by their tabs and install as shown in
the illustration at below.
77
CS-G95KE CU-G95KE / CS-G125KE CU-G125KE
HOW TO TAKE OUT FRONT GRILLE
Please follow below steps to take out front grille if necessary
such as when servicing.
 1. Set the vertical airflow direction louver to the horizontal
position.
 2. Slide down the two caps on the front grille as shown in the
illustration below, and then remove the two mounting
screws.
 3. Pull the lower section of the front grille towards you to
remove the front grille.
When reinstalling the front grille, first set the vertical
airflow direction louver to the horizontal position and
then carry out above steps 2 - 3 in the reverse order.
AUTO SWITCH OPERATION
The below operations will be performed by pressing the
“AUTO” switch.
 1. AUTO OPERATION MODE
The Auto operation will be activated immediately once the
Auto Switch is pressed.
 2. TEST RUN OPERATION (FOR PUMP DOWN/SERVICING
PURPOSE)
The Test Run operation will be activated if the Auto Switch
is pressed continuously for more than 5 sec. to below 10
sec.. A “beep” sound will occur at the fifth sec., in order to
identify the starting of Test Run operation
 3. REMOTE CONTROLLER RECEIVING SOUND ON/OFF
The ON/OFF of Remote Controller receiving sound can be
change over by pressing the “AUTO” Switch continuously
for 10 sec. and above. A “beep”, “beep” sound will occur at
the tenth sec., in order to indicate the “ON/OFF” change
over of remote control receiving sound.
10.3. OUTDOOR UNIT
10.3.1. SELECT THE BEST LOCATION
(Refer to “Select the best location”
section)
10.3.2. INSTALL THE OUTDOOR UNIT
  • 
After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.
 1. Fix the unit on concrete or rigid frame firmly and horizontally
by bolt nut. (ø10 mm).
 2. When installing at roof, please consider strong wind and
earthquake. Please fasten the installation stand firmly with
bolt or nails.
10.3.3. CONNECTING THE PIPING
Connecting the Piping to Indoor Unit
Please make flare after inserting flare nut (locate at joint portion
of tube assembly) onto the copper pipe. (In case of using
piping)
Connect the piping
  • 
Align the center of piping and sufficiently tighten the flare
nut with fingers.
  • 
Further tighten the flare nut with torque wrench in specified
torque as stated in the table.
MODEL
Piping size (Torque)
Gas
Liquid
G95KE
3/8” (42 N.m)
1/4” (18 N.m)
G125KE
1/2” (55 N.m)
1/4” (18 N.m)
Connecting the Piping to Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove
burrs from cut edge. Make flare after inserting the flare nut
(located at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque
wrench to the specified torque as stated in the table.
78
S-G95KE CU-G95KE / CS-G125KE CU-G125KE
CUTTING AND FLARING THE PIPING
 1. Please cut using pipe cutter and then remove the burrs.
 2. Remove the burrs by using reamer. If burrs is not
removed, gas leakage may be caused.
Turn the piping and down to avoid the metal powder
entering the pipe.
 3. Please make flare after inserting the flare nut onto the
copper pipes.
10.3.4.  EVACUATION OF THE EQUIPMENT
WHEN INSTALLING AND AIR CONDITIONER, BE SURE TO
EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES
in the following procedure.
 1. Connect a charging hose with a push pin to the Low and
High side of a charging set and the service port of the 3-way
valve.
  • 
Be sure to connect the end of the charging hose with the
push pin to the service port.
 2. Connect the center hose of the charging set to a vacuum
pump.
 3. Turn on the power switch of the vacuum pump and make
sure that the needle in the gauge moves from 0 cmHg (0
MPa) to -76 cmHg (-0.1 MPa). Then evacuate the air
approximately ten minutes.
 4. Close the valve of both the Low and High sides of the
charging set and turn off the vacuum pump. Make sure that
the needle in the gauge does not move after approximately
five minutes.
Note: BE SURE TO TAKE THIS PROCEDURE IN ORDER
TO AVOID REFRIGERANT GAS LEAKAGE.
 5. Disconnect the charging hose from the vacuum pump and
from the service port of the 3-way valve.
 6. Tighten the service port caps of the 3-way valve at torque of
18 N.m with a torque wrench.
 7. Remove the valve caps of both of the 2-way valve and 3-
way valve. Position both of the valves to “OPEN” using a
hexagonal wrench (4 mm).
 8. Mount valve caps onto the 2-way valve and the 3-way valve.
  • 
Be sure to check for gas leakage.
CAUTION
  • 
If gauge needle does not move from 0 cmHg (0
MPa) to -76 cmHg (-0.1 MPa), in step 3 above take
the following measure:
  • 
If the leak stops when the piping connections are
tightened further, continue working from step 3.
  • 
If the leak does not stop when the connections are
retightened, repair the location of leak.
  • 
Do not release refrigerant during piping work for
installation and re-installation. Take care of the
liquid refrigerant, it may cause frostbite.
10.3.5. CONNECT THE CABLE TO THE
OUTDOOR UNIT
 1. Remove the control board cover from the unit by loosening
the screw.
 2. Connecting cable between indoor unit and outdoor unit
shall be approved polychloroprene sheathed 4 × 1.5 mm
2
flexible cord, type designation H05 RN-F or heavier cord.
 3. Secure the cable onto the control board with the holder
(clamper).
 4. Attach the control board cover back to the original position
with the screw.
10.3.6. PIPE INSULATION
 1. Please carry out insulation at pipe connection portion as
mentioned in Indoor/Outdoor Unit Installation Diagram.
Please wrap the insulated piping end to prevent water from
going inside the piping.
 2. If drain hose or connecting piping is in the room (where dew
may form), please increase the insulation by using POLY-E
FOAM with thickness 6 mm or above.
79
CS-G95KE CU-G95KE / CS-G125KE CU-G125KE
DISPOSAL OF OUTDOOR UNIT DRAIN WATER
  • 
If a drain elbow is used, the unit should be placed on a
stand which is taller than 3 cm.
  • 
If the unit is used in an area where temperature falls below
0°C for 2 or 3 days in succession, it is recommended not to
use a drain elbow, for the drain water freezes and the fan
will not rotate.
CHECK THE DRAINAGE
  • 
Open front panel and remove air filters.
(Drainage checking can be carried out without removing the
front grille.)
  • 
Pour a glass of water into the drain tray-styrofoam.
  • 
Ensure that water flows out from drain hose of the indoor
unit.
EVALUATION OF THE PERFORMANCE
  • 
Operate the unit at cooling operation mode for fifteen
minutes or more.
  • 
Measure the temperature of the intake and discharge air.
  • 
Ensure the difference between the intake temperature and
the discharge is more than 8°C.
CHECK ITEMS
Is there any gas leakage at flare nut connections?
Has the heat insulation been carried out at flare nut
connection?
Is the connecting cable being fixed to terminal board firmly?
Is the connecting cable being clamped firmly?
Is the drainage OK?
(Refer to “Check the drainage” section)
Is the earth wire connection properly done?
Is the indoor unit properly hooked to the installation plate?
Is the power supply voltage complied with rated value?
Is there any abnormal sound?
Is the cooling operation normal?
Is the thermostat operation normal?
Is the remote control’s LCD operation normal?
Is the air purifying filter installed?
80
S-G95KE CU-G95KE / CS-G125KE CU-G125KE
Page of 113
Display

Click on the first or last page to see other CS-G95KE / CS-G125KE / CU-G95KE / CU-G125KE service manuals if exist.