DOWNLOAD Panasonic CS-A7HKD / CS-A9HKD / CS-A12HKD / CU-A7HKD / CU-A9HKD / CU-A12HKD Service Manual ↓ Size: 12.64 MB | Pages: 78 in PDF or view online for FREE

Model
CS-A7HKD CS-A9HKD CS-A12HKD CU-A7HKD CU-A9HKD CU-A12HKD
Pages
78
Size
12.64 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner / AIR CONDITIONER
File
cs-a7hkd-cs-a9hkd-cs-a12hkd-cu-a7hkd-cu-a9hkd-cu-a.pdf
Date

Panasonic CS-A7HKD / CS-A9HKD / CS-A12HKD / CU-A7HKD / CU-A9HKD / CU-A12HKD Service Manual ▷ View online

25
11.3. Indoor Unit
11.3.1.
HOW TO FIX INSTALLATION PLATE
The mounting wall is strong and solid enough to prevent it from
the vibration.
The centre of installation plate should be at more than 450 mm
at right and left of the wall. 
The distance from installation plate edge to ceiling should more
than 67 mm.
From installation plate left edge to unit’s left side is 74 mm.
From installation plate right edge to unit’s right is 94 mm.
1. Mount the installation plate on the wall with 5 screws or
more.
(If mounting the unit on the concrete wall, consider using
anchor bolts.)
• Always mount the installation plate horizontally by
aligning the marking-off line with the thread and using a
level gauge.
2. Drill the piping plate hole with ø70 mm hole-core drill.
• Line according to the left and right side of the installation
plate. The meeting point of the extended line is the
centre of the hole. Another method is by putting
measuring tape at position as shown in the diagram
above. The hole centre is obtained by measuring the
distance namely 150 mm and 125 mm for left and right
hole respectively.
• Drill the piping hole at either the right or the left and the
hole should be slightly slanted to the outdoor side.
11.3.2.
TO DRILL A HOLE IN THE WALL
AND INSTALL A SLEEVE OF
PIPING
1. Insert the piping sleeve to the hole.
2. Fix the bushing to the sleeve.
3. Cut the sleeve until it extrudes about 15 mm from the
wall.
4. Finish by sealing the sleeve with putty or caulking
compound at the final stage.
11.3.3.
INDOOR UNIT INSTALLATION
1. For the right rear piping
2. For the right and right bottom piping
: For left side piping, piping connection for liquid should be about
15 mm from this line.
: For left side piping, piping connection for gas should be about
45 mm from this line.
: For left side piping, piping connection cable should be about
800 mm from this line.
Caution
When the wall is hollow, please be sure to use the
sleeve for tube ass’y to prevent dangers caused by
mice biting the connecting cable.
26
3. For the embedded piping
(This can be used for left rear piping and left bottom piping
also.)
27
11.3.4.
CONNECT THE CABLE TO THE
INDOOR UNIT
1. The inside and outside connecting cable can be
connected without removing the front grille.
2. Connecting cable between indoor unit and outdoor unit
shall be approved polychloroprene sheathed 3 (C7HKD,
C9HKD, C12HKD) or 5 (A7HKD, A9HKD, A12HKD)
x 1.5 mm
2
 flexible cord, type designation 245 IEC 57 or
heavier cord.
• Ensure the colour of wires of outdoor unit and the
terminal Nos. are the same to the indoor’s respectively.
• Earth lead wire shall be longer than the other lead wires
as shown in the figure for the electrical safety in case of
the slipping out of the cord from the anchorage.
• Secure the cable onto the control board with the holder
(clamper).
28
11.4. Outdoor Unit
11.4.1.
INSTALL THE OUTDOOR UNIT
• After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and
horizontally by bolt nut (ø10 mm).
2. When installing at roof, please consider strong wind and
earthquake. Please fasten the installation stand firmly
with bolt or nails.
11.4.2.
CONNECTING THE PIPING
Connecting The Piping To Indoor Unit 
Please make flare after inserting flare nut (locate at joint portion of tube assembly) onto the copper pipe.
(In case of using long piping)
Connect the piping
• Align the center of piping and sufficiently tighten the flare nut with fingers.
• Further tighten the flare nut with torque wrench in specified torque as stated in the table.
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge. Make flare after inserting the flare nut
(locate at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque wrench to the specified torque as stated in the table.
CUTTING AND FLARING THE PIPING
1. Please cut using pipe cutter and then remove the burrs.
2. Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused.
Turn the piping end down to avoid the metal powder entering the pipe.
3. Please make flare after inserting the flare nut onto the copper pipes.
Model
A
B
C
D
C7HKD, C9HKD, C12HKD, 
A7HKD, A9HKD
474 mm
87 mm
18.5 mm 261 mm
A12HKD
570 mm 105 mm 18.5 mm 320 mm
Model
Piping size (Torque)
Gas
Liquid
C7HKD, C9HKD, A7HKD, A9HKD
3/8” [42 N
O
m]
1/4” [18 N
O
m)
C12HKD, A12HKD
1/2” [55 N
O
m]
1/4” [18 N
O
m)
Do not over tighten, over tightening cause gas leakage.
Page of 78
Display

Click on the first or last page to see other CS-A7HKD / CS-A9HKD / CS-A12HKD / CU-A7HKD / CU-A9HKD / CU-A12HKD service manuals if exist.