DOWNLOAD LG WT6001HVA Service Manual ↓ Size: 25.24 MB | Pages: 61 in PDF or view online for FREE

Model
WT6001HVA
Pages
61
Size
25.24 MB
Type
PDF
Document
Service Manual
Brand
Device
Washing Machine
File
wt6001hva.pdf
Date

LG WT6001HVA Service Manual ▷ View online

FOR LG TECHNICIAN
49
Test
point
and
Result
(Hall
Sensor)
- Voltage Testing Hall Sensor at Stator
If measuring voltage from the main PCB assembly to the Hall Sensor, use the following steps:
1. Unplug power cord.
2. Remove rear washer panel.
3. Locate hall sensor connector on the stator behind the rotor.
4. Place meter leads on terminals 5 to 4, white to gray.
5. Plug in power cord, close door, and press power button. 
    DO NOT PRESS START!
6.  You should measure 10 to 15 Vdc. If 10 to 15 Vdc is present, control board, white wire, and gray 
wire are OK! If not follow testing output voltages on control board in next section.
7.  To measure output signal voltage from the hall sensor, carefully  move test leads to terminals 1 to 
4, blue and gray. Slowly rotate motor rotor by hand. You should read a pulsing 10 Vdc. If 10 Vdc is 
measured from 1 to 4, move lead on blue wire to red wire, terminal 2. Repeat rotating motor rotor 
by hand. You should  read a pulsing 10 Vdc from red to gray.  
8.  If pulsing 10 Vdc is measured from 1 to 4 and 2 to 4, hall sensor  is OK! If either test netted only 9 
to 10 Vdc without changing (no pulsing) the hall  sensor is likely defective. Disconnect  power by 
unplugging washer and ohm check hall sensor to verify failure of the hall sensor.
The hall sensor determines the speed and direction of the motor. 
It also can read that the load is off balance when the drum speed fluctuates.
(1)
(2)
(3)
(4)
(5)
Result
3 MΩ ↑
3 MΩ ↑
9 MΩ ↑
9 MΩ ↑
Test Points
(1) To (4)
(2) To (4)
(1) To (5)
(2) To (5)
Remarks
Resistance
Resistance
Resistance
Resistance
FOR LG TECHNICIAN
50
Test
point
and
Result
(Hall
Sensor)
- Voltage Testing Hall Sensor from the Main PCB Assembly
1. Unplug power cord.
2. Remove rear panel.
3. Remove washer top.
4. Remove main PCB assembly cover as shown in chart below.
5. Locate the blue hall sensor 6 wire connector using wiring diagram wire colors as your guide.
6. Plug in power cord, close door, and press power button. DO NOT  PRESS START!
7.  Place meter leads on white and gray wires. You should read 10 to 15 Vdc  output from the Main 
PCB Assembly to the Hall sensor. If no 10 to 15 Vdc is  measured the control board is defective.
8.  Place meters leads on blue to yellow. Turn motor rotor slowly by hand. You should measure  
 a pulsing 10 Vdc. Place meter leads on red to yellow. Turn motor rotor slowly by hand.  
You should measure a pulsing 10 Vdc. If both tests measure a pulsing 10 Vdc, hall sensor and 
harness OK. If either or both tests measures 9 to 10 volts, but does not pulse or change,  
hall sensor has failed and must be replaced. IF zero (0) voltage is measured on either test,  
check red and blue wires for continuity. Repair or replace harness as needed. 
Result
8-12 kΩ
8-12 kΩ
10-15 Vdc
10 Vdc
10 Vdc
Test Points
(1) to (2)
(1) to (3)
(1) to (6)
(2) to (6)
(3) to (6)
Remarks
Voltage Input
Pulsing Signal
Pulsing Signal
(1)
(2)
(3)
(6)
FOR LG TECHNICIAN
5-4. PUMP MOTOR ASSEMBLY
51
Wiring
diagram
Test 
points
and
Result
Circuit in the MAIN PCB
Wiring Diagram
(1) (2)
Result
10.9 Ω±5%
Remarks
Resistance
Test Points
(1) to (2)
FOR LG TECHNICIAN
5-5. INLET VALVE ASSEMBLY
52
Wiring
diagram
Function
Test
points
and
Result
Circuit in the MAIN PCB
Wiring diagram
INLET VALVE
Inlet valve driving circuit
Depending on the cycle and water temperature, the controller will energize the hot or cold water 
valve solenoids to meet the selected water temperature.
After unplugging the connector of the defective valve, check the resistance.
(1) (2)
(2)
(2)
(2)
(2)
(1)
(1)
(1)
(1)
Test 
Points
(1)-(2)
Result
0.8-1.2 k Ω
Page of 61
Display

Click on the first or last page to see other WT6001HVA service manuals if exist.