JBL SPARK (serv.man7) EMC - CB Certificate ▷ View online
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 17 of 48
levels were recorded for reference of the final test.
Procedure of Final Test
EUT and support equipment were set up on the test bench as per the configuration with
highest emission level in the preliminary test. A scan was taken on both power lines,
recording at least the six highest emissions. Emission frequency and amplitude were recorded
into a computer in which correction factors were used to calculate the emission level and
compare reading to the applicable limit. The test data of the worst-case condition(s) was
recorded.
EUT and support equipment were set up on the test bench as per the configuration with
highest emission level in the preliminary test. A scan was taken on both power lines,
recording at least the six highest emissions. Emission frequency and amplitude were recorded
into a computer in which correction factors were used to calculate the emission level and
compare reading to the applicable limit. The test data of the worst-case condition(s) was
recorded.
4.2.3 TEST SETUP
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 18 of 48
4.2.4 TEST RESULTS
Project No.:
ZJ00028648
Probe:
L1
Standard:
(CE)CISPR22 class B_QP
Power Source: AC 230V/50Hz
Test item:
Conduction Test
Date:
2013-5-2
Temp./Hum.(%RH): 21/53%RH
Time:
19:00:57
EUT:
JBL Wireless Speaker
Model:
JBL SPARK
Test Result:
Pass
Note:
Test Mode:Mode 1
No.
Frequency
Reading
Correct
Result
Limit
Margin
Remark
(MHz)
(dBuV)
Factor(dB)
(dBuV)
(dBuV)
(dB)
1 0.2014
41.89
3.46 45.35
63.55
-18.20
QP
2 0.2014
33.81
3.46 37.27
53.55
-16.28
AVG
3 0.3765
39.06
3.51 42.57
58.35
-15.78
QP
4 0.3765
31.15
3.51 34.66
48.35
-13.69
AVG
5 0.4220
45.82
3.51 49.33
57.41
-8.08
QP
6 0.4220
40.33
3.51 43.84
47.41
-3.57
AVG
7 0.7706
37.73
3.47 41.20
56.00
-14.80
QP
8 0.7706
30.23
3.47 33.70
46.00
-12.30
AVG
9 1.2279
37.53
3.51 41.04
56.00
-14.96
QP
10 1.2279 30.22 3.51 33.73 46.00 -12.27
AVG
11 1.8584 33.44 3.59 37.03 56.00 -18.97
QP
12 1.8584 25.28 3.59 28.87 46.00 -17.13
AVG
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 19 of 48
Project No.:
ZJ00028648
Probe:
N
Standard:
(CE)CISPR22 class B_QP
Power Source: AC 230V/50Hz
Test item:
Conduction Test
Date:
2013-5-2
Temp./Hum.(%RH): 21/53%RH
Time:
19:17:37
EUT:
JBL Wireless Speaker
Model:
JBL SPARK
Test Result:
Pass
Note:
Test Mode:Mode 1
No.
Frequency
Reading
Correct
Result
Limit
Margin
Remark
(MHz)
(dBuV)
Factor(dB)
(dBuV)
(dBuV)
(dB)
1 0.1939
42.53
3.50 46.03
63.86
-17.83
QP
2 0.1939
34.72
3.50 38.22
53.86
-15.64
AVG
3 0.2196
42.05
3.47 45.52
62.83
-17.31
QP
4 0.2196
34.45
3.47 37.92
52.83
-14.91
AVG
5 0.3552
39.54
3.51 43.05
58.84
-15.79
QP
6 0.3552
32.22
3.51 35.73
48.84
-13.11
AVG
7 0.4239
46.87
3.51 50.38
57.37
-6.99
QP
8 0.4239
40.56
3.51 44.07
47.37
-3.30
AVG
9 0.7443
36.07
3.47 39.54
56.00
-16.46
QP
10 0.7443 28.70 3.47 32.17 46.00 -13.83
AVG
11 1.3139 36.16 3.57 39.73 56.00 -16.27
QP
12 1.3139 28.66 3.57 32.23 46.00 -13.77
AVG
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 20 of 48
4.3 VOLTAGE FLUCTUATION AND FLICKS MEASUREMENT
4.3.1 LIMITS
Test standard: EN 61000-3-3:2008
Test Item
Limit
Remark
P
st
1.0
P
st
means short-term flicker indicator.
P
lt
0.65
P
lt
means long-term flicker indicator.
T
dt
(ms)
500
T
dt
means maximum time that dt exceeds 3 %.
d
max
(%)
4%
d
max
means maximum relative voltage change.
dc (%)
3.3%
dc means relative steady-state voltage change
4.3.2 TEST PROCEDURES
The EUT was placed on the top of a wooden table 0.8 meters above the ground and operated
to produce the most unfavorable sequence of voltage changes under normal operating
conditions.
to produce the most unfavorable sequence of voltage changes under normal operating
conditions.
During the flick measurement, the measure time shall include that part of whole operation
cycle in which the EUT produce the most unfavorable sequence of voltage changes. The
observation period for short-term flicker indicator is 10 minutes and the observation period
for long-term flicker indicator is 2 hours.
cycle in which the EUT produce the most unfavorable sequence of voltage changes. The
observation period for short-term flicker indicator is 10 minutes and the observation period
for long-term flicker indicator is 2 hours.
4.3.3 TEST SETUP
Harmonics &
Flicker
Analyzer
+
Power Source
EUT
Support
Power
Cord
Cord
0.8
m
Click on the first or last page to see other SPARK (serv.man7) service manuals if exist.