JBL SPARK (serv.man7) EMC - CB Certificate ▷ View online
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 29 of 48
5.4.3 TEST SETUP
Power
Amp
Amp
Signal
Generato
r
EUT Monitoring by
using a spectrum and
ear
using a spectrum and
ear
0.8m
Control Room
9
×
6
×
6
EUT&
Support
Support
Units
PC Controller to
control S.G. & PA as
well as forward
power
control S.G. & PA as
well as forward
power
3 meter
1.5m
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 30 of 48
5.4.4 TEST RESULTS
EUT
JBL Wireless Speaker
Mode Number
JBL SPARK
Test date
2013-05-03
Voltage Supply
AC 230V/50Hz
Test Engineer
Liang
environment
Tem:22℃ Hum:54 %100kPa
Test mode:
1. Test the EUT in mode 1:BT
2. Test the EUT in mode 2:Standby
2. Test the EUT in mode 2:Standby
Frequency
(MHz)
Polarity
Azimuth
Field
Strength
(V/m)
Required
Passing
Performance
Actual
performance
Result
80 ~ 1000
V&H
Front
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Rear
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Right
3
Criterion A
Criterion A* PASS
80 ~ 1000
V&H
Left
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Front
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Rear
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Right
3
Criterion A
Criterion A* PASS
1400 ~ 2700
V&H
Left
3
Criterion A
Criterion A* PASS
A*: EUT is working on intended use operation, no abnormal phenomenon was observed.
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 31 of 48
5.5 ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
5.5.1 TEST SPECIFICATION
Basic Standard
EN 61000-4-4: 2012
Test Voltage
Electrical Fast Transient/Burst – EFT:
AC Power Port: ±1kV,Signal port ±0.5kV
Performance Criterion B
AC Power Port: ±1kV,Signal port ±0.5kV
Performance Criterion B
Polarity
Positive and Negative
Impulse Frequency
5 kHz
Impulse Wave-shape
5 ns/50ns for voltage
Burst Duration
15 ms
Burst Period
300 ms
Test Duration
2 minutes
5.5.2 TEST PROCEDURE
The EUT and its simulators shall be placed 0.1m high above the ground reference plane which is a min.
1m×1m metallic sheet with 0.65mm minimum thickness. This reference ground plane shall project
beyond the EUT by at least 0.1m on all sides and the minimum distance between EUT and all other
conductive structure, except the ground plane beneath the EUT, shall be more than 0.5m.
For input and AC power ports:
The EUT is connected to the power mains by using a coupling device which couples the EFT
interference signal to AC power lines. Both polarities of the test voltage should be applied during
compliance test and the duration of the test can’t less than 1min.
5.5.3 TEST SETUP
10 cm isolation
supporter
AC
input
EFT
Generator
EUT
AC
AC Line
Ground Reference Plane
0.5m
Report No.: EM201300221-2 Application No.: ZJ00028648 Page 32 of 48
5.5.4 TEST RESULTS
EUT
JBL Wireless Speaker
Mode Number
JBL SPARK
Test date
2013-05-03
Voltage Supply
AC 230V/50Hz
Test Engineer
Liang
environment
Tem:21℃ Hum:54 %100kPa
Test mode:
1. Test the EUT in mode 1:BT
2. Test the EUT in mode 2:Standby
2. Test the EUT in mode 2:Standby
Test Point
Polarity
Test Level
(kV)
Required Passing
Performance
Actual
performance
Result
L–N
+/-
1
Criterion B
Criterion A*
PASS
A*: EUT is working on intended use operation, no abnormal phenomenon was observed.
Click on the first or last page to see other SPARK (serv.man7) service manuals if exist.